(Li Jianfeng, Deputy Engineer of China Electric Power Research Institute)
The State Energy Administration officially released the "China Virtual Power Plant Development Report (2026)" (hereinafter referred to as the "Report"), which comprehensively combs the development of virtual power plants in China. It is of great significance to systematically summarize the development results and scientifically judge the development trend during the 15th Five-Year Plan period for the cohesion of industry consensus and the guidance of the orderly development of industry norms.
1. Top-level design leads the virtual power plant into a new stage
of large-scale development. Virtual power plant is an important way for power demand side resources to play a flexible regulation role in the new power system. With the continuous expansion of the installed capacity of new energy, the "double high" characteristics of the new power system have become increasingly prominent, the demand for system regulation has continued to grow, and the regulation mode has been accelerated from the power side to March 2008. The National Development and Reform Commission and the National Energy Administration issued the first national special policy for virtual power plants, the Guiding Opinions on Accelerating the Development of Virtual Power Plants (FGNY [2025] No.357, hereinafter referred to as the Guiding Opinions). This year, virtual power plants were included in the national power development plan for the first time, and the first batch of national pilot projects were announced. Special policies set the direction, development planning sets the location, pilot demonstration sets the path, and coordinate to build the top-level framework of industry development. Local supporting policies have been followed up synchronously, and development plans, construction and operation management measures, market rules and financial support policies have been improved one after another.
From the perspective of development scale, the number and maximum regulation capacity of virtual power plants in China have increased rapidly, and the development goal of 2027 established in the Guiding Opinions has been fulfilled ahead of schedule. East China, South China, North China and other regions have abundant regulation demand scenarios, rapid progress in power market construction, and relatively advanced development of virtual power plants with large scale.
From the perspective of resource composition, the types of aggregated resources continue to expand, covering distributed generation, adjustable load and
report cover policy, management, scenario, market, subject, technology, standards and security, reflecting the growth process of emerging industries from scratch, from point to area. Generally speaking, since the publication of the Guiding Opinions, the policy system of virtual power plants in China has been continuously improved, the operation level has been steadily improved, and the scale has achieved rapid growth. Virtual power plants are entering a new stage of standardization, normalization, scale and marketization from pilot exploration.
Second, technology and standards work together to continuously consolidate the construction and operation of virtual power plants based
on aggregation regulation, which requires technology to provide capabilities, standards to establish norms, and aggregation resources to participate in an orderly manner across the main body and multiple markets. In terms of
technology, the key technology of virtual power plant covers four hierarchical and progressive links of perception, transmission, decision-making and execution, and jointly realizes the effective aggregation of massive, heterogeneous, small and decentralized resources. Among them, terminal perception and communication access solve the problem of "visible, connected", relying on intelligent terminals, measurement devices and other terminal equipment, to achieve real-time acquisition of the operation status of various resources, through the communication network, the scattered data will be reliably transmitted to the platform, providing a basis for aggregation; Platform aggregation and collaborative control solve the problem of "accurate calculation and adjustment", relying on artificial intelligence, digital twin and other technologies to carry out load forecasting, resource analysis and optimization decision-making, control strategy issued step by step, closed-loop implementation; Multi-time scale optimization and matching, solve the problem of "precise adjustment and stable response", allocate all kinds of resources differently according to the adjustment needs of different time scales, and improve the level of adjustable potential assessment and performance consistency through continuous check of historical response data, and steadily enhance the self-control ability of core technology and key products. In terms of
standards, the industry has formed a virtual power plant standard system of 6 categories, 15 sub-categories and 41 items, which covers resource allocation, aggregation regulation, access and grid connection, platform terminal, operation management, data communication, safety testing and operation evaluation through the collaborative formulation and revision of national standards, industry standards, local standards and group standards. Among the six categories of standards, the basic general standards lay the foundation for the overall architecture, the system terminal specifications and resource access specifications ensure the compatibility and scalability of the virtual power plant, the design and acceptance criteria ensure the reliable quality and functional standards of the virtual power plant project, the operation and management specifications ensure the stable participation of the virtual power plant in the system operation and market transactions, and the benefits and evaluation standards. It promotes the sustainable development of the industry and provides a basis for the fair participation of virtual power plants in various markets.
Third, the application of scenarios continues to expand, the market participation mechanism continues to improve
, and the system adjustment scenarios continue to enrich. Provinces actively explore the regulation mechanism of virtual power plants, which play an active role in alleviating the contradiction between power supply and demand, promoting the absorption of new energy, alleviating the overload of power facilities and improving power quality. Zhejiang's market-oriented response to new energy consumption has achieved the maximum adjustment in a single day 147.
The path of market participation has become increasingly clear. The participation of virtual power plants in medium and long-term electricity transactions is gradually increasing, the participation in spot market is increasingly active, the participation in ancillary services market is steadily advancing, the participation in demand response path tends to be mature, and the multi-revenue model of "capacity + electric energy + ancillary services + demand response" is initially formed. From the perspective of value mechanism, spot price difference, ancillary service cost and capacity compensation respectively reflect the value of electricity optimization, rapid regulation and reliability.It is an important direction for the business model of virtual power plant to mature to realize reasonable value superposition through "integrated multi-use, time-sharing reuse".
4. Multi-subject collaborative participation, industrial ecology to accelerate the cultivation of
浙公网安备33010802003254号