Jingmen Chemical Recycling Industrial Park Special Railway Line Project EPC
Project Location: Dongbao District and Duodao District, Jingmen City
Construction Project Scale: The newly-built Jingmen Chemical Recycling Industrial Park Special Railway Line is located in Dongbao District and Duodao District, Jingmen City. The line is connected from the safety line at the north end of Jingmen East Station, and Jingmen Chemical Industry Park Station is set up on the south side of Xinghua Third Road, and the terminal point is introduced into the operation area of Jingmen International Inland Port. The total length of the main line is 17.469 km, the range of DK0 + 000 ~ DK8 + 526 is in Dongbao District, and the range of DK8 + 526 ~ DK17 + 469 is in Duodao District. The main construction contents include track, line, subgrade, bridge and culvert, station yard, communication, signal, housing construction, traction power supply, water supply and drainage, locomotive, vehicle, machinery and other related supporting projects.
First place: China Railway Fourth Survey and Design Institute Group Co., Ltd.
China Railway Construction Engineering Group Co., Ltd
. China Railway Construction Bridge Engineering Bureau Group Co., Ltd.
Bid price (RMB) 811593496.21
Second place: China Railway Bidding Price of
China Railway 24th Bureau Group Co.
, Ltd. (CNY) 811996506.46
No.3: China Railway Fifth Survey and Design Institute Group Co., Ltd.
China Railway 25th Bureau Group Co., Ltd. 0 HTML0 806943064.0 2 Bidding Price (RMB) 806943064.0 HTML0 806943064.0 3 Construction Scale: The section from Foshan Station to Guangzhou North Station of Guangzhou-Foshan Ring Line (Guangzhou-Foshan West Ring Intercity Line) of Pearl River Delta Intercity Rail Transit starts from Foshan West Station, passes through Nanhai District of Foshan City, Huadu District and Baiyun District of Guangzhou City, and ends at Guangzhou North Station. The total length of the line is 47. The project has one intercity railway vocational training section. Total budget estimate approved for the project 226.0 HTML0 UNK1 4 Main technical standards: Railway grade: intercity railway; number of main lines: double track; design speed: 200 km/H, speed limit in some sections; Distance between main lines: 4.0 HTML0 39974 5 First place: China Railway Construction Electrification Bureau Group Co., Ltd. 0 HTML0 UNK1 6 Bid price: UNK1 199200 (RMB 10,000) 0 HTML0 UNK1 7 Second place: China Railway Electrification Bureau Group Co., Ltd. 0 HTML0 UNK1 8 Bid price: 40688 88 Third place: CRSC Engineering Bureau Group Co., Ltd. 0 HTML 0 Pearl River Delta 0 Tender offer: 40690. 0 HTML 0 UNK2 1 Construction scale: The section from Foshan West Station to Guangzhou North Station of Guangzhou-Foshan Ring Line (Guangzhou-Foshan West Ring Intercity Line) of UNK2 Intercity Rail Transit starts from Foshan Station and passes through Nanhai District of Foshan City. Huadu District and Baiyun District of Guangzhou, ending at Guangzhou North Railway Station. The total length of the line is 47. The project has one intercity railway vocational training section. Total budget estimate approved for the project 226.0 HTML0 UNK2 2 Main technical standards: railway grade: intercity railway; number of main lines: double track; design speed: 200 km/H, speed limit in some sections; Distance between main lines: 4.0 HTML0 105800 3 First place: Electricity Engineering Co., Ltd. of China Railway First Group 0 HTML0 UNK2 4 Bid price: 44385 UNK2 (RMB 10,000) 0 HTML0 UNK2 5 Second place: Electricity Engineering Co., Ltd. of China Railway 11th Bureau 0 HTML0 UNK2 6 Bid price: 44621 901600 (ten thousand yuan) 0 HTML 0 45623 7 Third place: China Railway Electrification Bureau Group Co., Ltd. 0 HTML 0 UNK2 8 Bidding quotation: UNK2. New main line 84. Railway grade is high-speed railway, double-track, design speed 250 km/H. It is planned to start construction on April 16, 2026 and complete on April 15, 2030, with a total construction period of 48 months. 0 HTML0 UNK2 9 The estimated total investment of the project is about 197.0 HTML0 UNK3 5 Bid winning results 0 HTML0 UNK3 1 The first bid section (NGZQSG-01): 0 HTML0 UNK3 2 Bid winner: China Railway Siju Group Co., Ltd. 0 HTML0 UNK3 3 Bid amount 13.0 HTML0 UNK3 4 Second bid section (NGZQSG-02): 0 HTML0 UNK3 5 Bid winner: Sichuan Chuanjiao Road & Bridge Co., Ltd. 0 HTML0 UNK3 6 Bid amount 19.0 HTML0 UNK3 7 Third bid section (NGZQSG-03): 0 HTML0 UNK3 8 Bid winner: China Railway No.6 Engineering Group Co., Ltd. 0 HTML0 UNK3 9 Bid amount 11.0 HTML0 UNK4 0 The fourth bid section (NGZQSG-04): 0 HTML0 UNK4 1 Bid winner: China Construction Eighth Engineering Bureau Co., Ltd., 0 HTML0 UNK4 2 Consortium of CRSC (Zhengzhou) Electrification Bureau Group Co., Ltd., 0 HTML0 UNK4 3 Winning bid amount 10.
浙公网安备33010802003254号