On July 21, the Sichuan Economic and Credit Department issued a bulletin, which was checked and accepted by the relevant municipal (state) economic and information bureaus and organized by the Sichuan Economic and Credit Department in accordance with the requirements of the Circular of the Ministry of Industry and Information Technology on the Issuance of the Measures for the Implementation of Capacity Replacement in the Cement and Glass Industry (2024 edition) (No.206 of the Ministry of Industry and Information Technology). The 2000t/d cement clinker production line kiln and other main equipment used for capacity replacement by Sichuan Naituo Special Cement Co., Ltd. have been shut down and dismantled, and the conditions for resuming production are not available.
On July 21, the Economic and Credit Department of Sichuan Province issued a public announcement, in accordance with the requirements of the Circular of the Ministry of Industry and Information Technology on the Issuance of the Implementation Measures for Capacity Replacement in the Cement and Glass Industry (2024 Edition). The 2000t/d cement clinker production line kiln and other main equipment used by Sichuan Naituo Special Cement Co., Ltd. for capacity replacement have been shut down and dismantled, and the conditions for resuming production are not available, after verification and acceptance by relevant municipal (state) economic and information bureaus and on-site review and confirmation by experts organized by Sichuan Economic and Credit Department.