According to local media reports, as of November 11, the overall construction progress of the Qilian Mountain circular economy industrial construction project in Longnan, Gansu Province, has exceeded 93% , and has entered the final stage. It is planned to have the conditions for ignition production in mid-December 2026.


According to the previous release of Gansu Industry and Information Technology Office, a new 5000t/ d clinker production line has been built in Qilian Mountain Cement , Longnan . Withdrawn capacity comes from a 2500t/d clinker line in the same plant area and a 2500t/d clinker line in Wenxian Qilianshan Cement, with a replacement ratio of 1:1. After the
project is put into operation, it is estimated that the annual industrial output value will reach 1 billion yuan, the profit and tax will reach 150 million yuan, the annual standard coal will be saved by about 30000 tons, the carbon dioxide emission will be reduced by about 66000 tons, and the sulfur dioxide emission will be reduced by about 600 tons.
浙公网安备33010802003254号