Cement Network Video: Involved in More than 125 Million yuan! The ecological dispute case of Gaozheng Building Materials has entered the retrial stage of the Supreme People's Court!

2026-03-20 09:25:10

The disputes over the liability for ecological damage between Changdu Gaozheng Building Materials, a holding subsidiary of Tianlu, a Xizang, and the Sixth Construction Project of Sichuan Coal and Zhejiang Huadian have entered the stage of retrial review by the Supreme Law, involving more than 125 million yuan.

On the evening of March

18, Tianlu, a Xizang, announced that its holding subsidiary, Changdu Gaozheng Building Materials, had entered the stage of retrial review of the Supreme Law in the case of disputes over ecological damage liability between two companies, Sichuan Coal Sixth Construction and Zhejiang Huadian, involving more than 125 million yuan.

Changdu Gaozheng had filed a lawsuit before, claiming more than 125 million yuan in compensation (excluding litigation fees), but lost the first and second instance, and was responsible for the acceptance fee of 670600 yuan. Because it refused to accept the judgment of the second instance, the company applied for retrial, requesting to revoke the original judgment and support all its claims. At present, the outcome of the case is uncertain, and the impact on the company's profits is uncertain.

All can be viewed after purchase
Correlation

The disputes over the liability for ecological damage between Changdu Gaozheng Building Materials, a holding subsidiary of Tianlu, a Xizang, and the Sixth Construction Project of Sichuan Coal and Zhejiang Huadian have entered the stage of retrial review by the Supreme Law, involving more than 125 million yuan.

2026-03-20 09:25:10

The planned land area of this project is about 35272. 27 square meters, the net land area is about 26207 square meters, and the total construction area is about 238544. 45 square meters. Among them, the capacity building area is 172336. 65 square meters, including the 129540 of resettlement housing, the 10423 of public service facilities and municipal service facilities, the 31573 of resettlement property and other capacity area of 800 square meters; The floor area excluding capacity is 66207.8 square meters (the 58607 of the basement is.8 square meters). The building is 100 meters high, with three floors underground and five buildings with 32 floors above ground.