On March 12, the Inner Mongolia Office of Industry and Information Technology announced the replacement plan for the production capacity of Chifeng Lumeng Special Cement Company with a daily output of 2867 tons and Ordos Qingneng New Material Company with a daily output of 3300 tons.

In accordance with the requirements of the Notice of the Ministry of Industry and Information Technology on the Issuance of the Implementation Measures for Capacity Replacement in the Cement and Glass Industry (2024 edition) (No.206 of the Ministry of Industry and Information Technology). According to the Request for Public Announcement on the Supplementary Capacity Replacement Plan for the Cement Clinker Production Line of Chifeng Lumeng Special Cement Co., Ltd. (CGXF [2025] No.185) issued by Chifeng Bureau of Industry and Information Technology and the Report on the Supplementary Capacity Replacement for the Clinker New Dry Process Cement Production Line of Ordos Qingneng New Materials Co., Ltd. issued by Ordos Bureau of Industry and Information Technology Report on the Announcement of the Scheme (E Gong Xin Zi [2025] No.158), Alu Horqin Banner Xintianshan Cement Group Co., Ltd. has a registered clinker cement production line with a capacity of 2500t/d. The equipment is φ4.0 × 60m new dry precalcining kiln process technology. It is planned to replace 1300 tons of production capacity of Chifeng Lumeng Special Cement Co., Ltd. (Hereinafter referred to as Lumeng Special Cement) and 1200 tons of production capacity of Ordos Qingneng New Materials Co., Ltd. (Hereinafter referred to as Qingneng New Materials) according to the replacement ratio of 1.5: 1.

浙公网安备33010802003254号