Inner Mongolia: Announcement on Demolition and Withdrawal of 3 # Clinker Production Line with Daily Output of 2500 Tons of Wulanchabu Zhonglian Cement Co., Ltd.

2026-10-28 17:44:11

Wulanchabu Zhonglian Cement 3 # clinker production line has been dismantled and withdrawn, the core equipment has been destroyed, the license has been changed, and the production capacity has been transferred to Gansu and 4 # line in the plant, completely losing the conditions for resumption of production.

In accordance with the relevant requirements of the Measures for the Implementation of Capacity Replacement in the Cement and Glass Industry (2024 edition) (the original No.206 of the Ministry of Industry and Information Technology), The demolition and withdrawal of 3 # clinker production line with a daily output of 2500 tons of Wulanchab u Zhonglian Cement Co., Ltd. are announced as follows. The

company's 3 # clinker production line with a daily output of 2500 tons is located in Honggeertu Town, the right wing of Chahar, Wulanchabu City, and its production capacity is transferred to Yongdeng Qilianshan Cement Co., Ltd. of Lanzhou City, Gansu Province, and the 4 # production line in the factory area for capacity replenishment. According to the Request for Acceptance of 3 # Skilled Production Line De-functionalization of Wulanchabu Zhonglian Cement Co., Ltd. (Wu Gong Yi Fa [2026] No.120) issued by Wulanchabu Municipal Bureau of Industry and Information Technology, our office organized industry experts. On October 16, 2026, the withdrawal of 3 # clinker production line of Wulanchabu Zhonglian Cement Co., Ltd. was confirmed on site together with Wulanchabu Municipal Bureau of Industry and Information Technology and Chahar Right Rear Banner Bureau of Industry and Information Technology. The core process facilities of the production line, such as the cone of the decomposition furnace, the tertiary air duct, the high temperature fan, the tail coal scale and the tail coal conveying system equipment, and the waste heat boiler pipeline at the kiln head, have been dismantled and the procedures for the change of the production license and the pollutant discharge license have been fulfilled. The conditions for resuming the production of cement clinker are no longer available. The public is welcome to supervise.

Hereby announce. Telephone number for

supervision and reporting: 0471 — Department of

Industry and Information Technology of Inner Mongolia Autonomous Region, 4866490

, October 27

, 2026
All can be viewed after purchase
Correlation

Wulanchabu Zhonglian Cement 3 # clinker production line has been dismantled and withdrawn, the core equipment has been destroyed, the license has been changed, and the production capacity has been transferred to Gansu and 4 # line in the plant, completely losing the conditions for resumption of production.

2026-10-28 17:44:11

Since October 27, the price of cement in the main urban area has been raised again, with a range of 60 yuan/ton. Whether this push can be effectively implemented remains to be further verified by the market.