PV 500MW! Full resumption of a wind, solar and storage integration project in Xinjiang

2026-03-09 08:57:55

Digital New Energy DataBM. Com learned that on March 4, a comprehensive resumption ceremony was held for the Shanshan Phase II Wind, Light and Storage Integration Project in Shanshan Photovoltaic and Thermal Industrial Park, Turpan City, Xinjiang.

Digital New Energy DataBM. Com learned that on March 4, a comprehensive resumption ceremony was held for the Shanshan Phase II Wind, Light and Storage Integration Project in Shanshan Photovoltaic and Thermal Industrial Park, Turpan City, Xinjiang.

It is understood that the new energy Shanshan Phase II wind and solar storage integration project integrates photovoltaic, wind power and energy storage technologies , with a total investment of 3.117 billion yuan . The second phase of the project includes photovoltaic 500 MW, wind power 500 MW, and supporting the construction of an electrochemical energy storage system with a scale of 250,000 kilowatts and an energy storage time of 4 hours.

It is worth noting that the resumption of work is the second phase of the new energy Shanshan project. At present, the construction personnel of the second phase project have been fully on duty, and the construction work has been carried out in an orderly manner, focusing on the core tasks of electrochemical energy storage installation and commissioning, the remaining 300 MW photovoltaic installation and commissioning, and wind power construction.

Previously, the first phase of the "photothermal + photovoltaic" integration project has been steadily connected to the grid. The 900,000-kilowatt photovoltaic array in the first phase of the project is composed of 2.05 million monocrystalline silicon double-sided double-glass battery components , and the 100,000-kilowatt photothermal unit is matched with the 16667 heliostat to form a synergistic power supply mode of "photothermal storage + photovoltaic".

All can be viewed after purchase
Correlation

Digital New Energy DataBM. Com learned that on March 4, a comprehensive resumption ceremony was held for the Shanshan Phase II Wind, Light and Storage Integration Project in Shanshan Photovoltaic and Thermal Industrial Park, Turpan City, Xinjiang.

2026-03-09 08:57:55

Recently, the Taiyuan Municipal People's Government of Shanxi Province issued the Action Plan for Consolidating and Improving the Environmental Air Quality of Taiyuan City in 2026. Among them, it is proposed that we should take the continuous decline of PM2.5 concentration as the main line, promote the emission reduction of nitrogen oxides and volatile organic compounds, coordinate the control of ozone pollution, continuously reduce the total emission of air pollutants, and strive to achieve a good start of the "15th Five-Year Plan" ecological environment protection. By the end of December, the assessment, monitoring and acceptance of ultra-low emission transformation will be completed.