Three cement enterprises in Qinghai supplement clinker production capacity

2026-03-04 16:54:45

Three enterprises in Qinghai Province intend to supplement clinker production capacity through capacity replacement, involving a total of 1000 tons/day (river source) and 2500 tons/day (Qilian Mountain interior) production capacity, strictly following the policy of "equal or reduced replacement", which is a non-new project.

In accordance with the Guiding Opinions of the State Council on Resolving the Serious Contradiction of Overcapacity (Guofa [2013] No.41), the Notice of the Ministry of Industry and Information Technology on the Issuance of the Implementation Measures for Capacity Replacement in the Cement and Glass Industry (2024 Edition) (Ministry of Industry and Information Technology [2024] No.206) and the Ministry of Industry and Information Technology, The requirements of the General Office of the State Development and Reform Commission and other four ministries and commissions on standardizing the capacity management of the cement industry have been applied by enterprises and the competent departments of industry and information technology in the territori al areas have been examined. Now Minhe Qilianshan Cement Co., Ltd. produces 2250 tons of cement per day

Tel: 0971-6362660

Qinghai Provincial Department

of Industry and Information Technology March 4

, 2026 Minhe Qilianshan Cement Co., Ltd. Public Notice

of Replacement Plan for Completed Production Capacity Name of Application Enterprise: Minhe Qilianshan Cement Ltd

Replenishment of production capacity

Name

of enterprise Name of shareholder (to be filled in in the case of the same legal person enterprise)

Project name

Construction

site Minhe Qilianshan Cement Co., Ltd.

/0 HTM L0UNK7 Supplementary Capacity Project of 2250 TPA Cement Clinker Production Line of Minhe Qilianshan Cement Co., Ltd. 0 HTML0UNK8 No.1, Xiangtang Village, Chuankou Town, Minhe County, Haidong City, Qinghai Province 0 HTML0UNK9 Specifications, Models and Quantities of Main Equipment 0 HTML0 UNK1 0 Total Energy Consumption and Emission 0 HTML0 UNK1 1 Original Design Capacity ( 0 HTML 0 UNK1 2 Supplementary capacity (t/d) 0 HTML 0 UNK1 3 Replacement ratio 0 HTML 0 UNK1 4 Capacity after supplementary (t/d) 0 HTML 0 UNK1 5 Planned construction time 0 HTML 0 UNK1 6 Planned ignition and commissioning time 0 HTML 0 UNK1 7 Φ4 × 60m rotary kiln 1 set 0 HTML0 UNK1 8 Comprehensive energy consumption per unit product 109.48 kgce/t; sulfur dioxide: 48.12t/a; nitrogen oxides: 68.75t/a; particulate matter: 44.

20002502

: Complementary production capacity of 12250

(non-new, reconstruction and expansion projects)

Complementary production capacity of compliance (non-new, Reconstruction and expansion project)

Name

of enterprise transferring out production capacity

Name of shareholder (to be filled in under the same legal person enterprise)

Address

Unified social credit code

Filing or approval document

Production License (Valid Period)

Qinghai Jiang Heyuan Cement Co., Ltd.

/

Lalakou Village, Dahua Town, Huangyuan

County 91630123226900861MYJ (2001) No.139 0 HTML0 UNK5 (Qing) XK08-001-000200HTML0UNK6 (May 7, 2030) 0 HTML0UNK7 Specifications, models and quantities of main equipment 0 HTML0UNK8 Filing or approval documents Design capacity (t/d) 0 HTML0UNK9 Replacement capacity for this project (t/d) 0 HTML0U NK10Φ3.1 set of

1000500

of 0 × 48m rotary kiln (Note: the remaining 500 tons of production capacity is supplemented by the production line of 4250 tons of cement clinker per day of Qinghai Hongyang Cement Co., Ltd.)

Whether to enjoy the reward and subsidy fund 0 HTML0UNK 4Whether the capacity is reused 0 HTML0 UNK5 Emission Permit No. (Valid) 0 HTML0UNK6 Planned shutdown time 0 HTML0UNK7 Planned removal exit time (before the supplementary capacity comes into effect) 0 HTML0UNK8 No 0HTML0UNK9 No 0HTML0 091630123226900 091630123226900 861M001P (November 14, 2030) 0 HTML0 UNK1 November 1, 12025 0 HTML0 UNK1 before April 15, 22026 0 HTML0 UNK1 3 Remarks: 1. The production line transferred out of capacity must be stopped before submitting the capacity replacement plan. In principle, the main equipment such as kilns shall be dismantled within six months after the announcement of the capacity replacement plan, and the production license and emission permit shall be cancelled or changed; 0 HTML0 UNK1 4 2.0 HTML0 UNK1 5 Public Form of Replacement Plan for Completed Production Capacity of Qinghai Hongyang Cement Co., Ltd. 0 HTML0 UNK1 6 Name of Applicant: Qinghai Hongyang Cement Co., Ltd. 0 HTML0 UNK1 7 src="https://img7.ccement.com/image/news/20260304/69a7f3508c2781951031.

Replenishment of production capacity

Name

of enterprise Name of shareholder (for the same legal person enterprise)

Project name

Construction site

Qinghai Hongyang Cement Co., Ltd.

/0HT ML0UNK7 Supplementary Capacity Project of 4250t/d Cement Clinker Production Line of Qinghai Hongyang Cement Co., Ltd. 0 HTML0UNK8 K2796km, 109 National Highway, Xiaogangou, Guolemude, Golmud City, Qinghai Province 0 HTML0UNK9 Specifications, Models and Quantities of Main Equipment 0 HTML0UNK1 0 Total Energy Consumption and Emission 0 HTML 0 UNK1 1 Original Design Capacity (t/d) 0 HTML0 UNK1 2 Supplementary Capacity (t/d) 0 HTML0 UNK1 3 Replacement Proportion 0 HTML0 UNK1 4 Capacity after Supplementary (t/d) 0 HTML0 UNK1 5 Planned Construction Commencement Date 0 HTML0 UNK1 6 Planned Ignition and Commissioning Date 0 HTML0 UNK1 7Φ4.8 × 72m rotary kiln 1 set 0 HTML0 UNK1 8 Comprehensive energy consumption per unit product 115kgce/t; sulfur dioxide 96.47t/a; nitrogen oxide: 771.59t/a; particulate matter: 2.

1000500

of 0 × 48m rotary kiln (Note: the remaining 500 tons of production capacity is used for the production capacity supplement project of Minhe Qilianshan Cement Co., Ltd. with a daily output of 2250 tons of cement clinker production line)

can enjoy the reward and subsidy fund 0 HTML0UNK 6 Whether the capacity is reused 0 HTML0UNK7 Emission permit number (valid period) 0 HTML0UNK8 Planned shutdown time 0 HTML0UNK9 Planned removal exit time (before the supplementary capacity comes into effect) 0 HTML0 2916301232269 0 No 0 HTML0 UNK1 1 No 0 HTML0 UNK1 2916301232269 00861M001P (November 14, 2030) 0 HTML0 UNK1 November 1, 32025 0 HTML0 UNK1 April 15, 42026 0 HTML0 UNK1 5 Remarks: 1. The production line with capacity transferred out must be stopped before submitting the capacity replacement plan. In principle, the main equipment such as kilns shall be dismantled within six months after the announcement of the capacity replacement plan, and the production license and emission permit shall be cancelled or changed; 0 HTML0 UNK1 6 2.0 HTML0 UNK1 7 Qinghai Qilianshan Cement Co., Ltd. Public Notice of Completed Capacity Plan 0 HTML0 UNK1 8 Name of Applicant: Qinghai Qilianshan Cement Co., Ltd. 0 HTML0 UNK1 9 src="https://img7.ccement.com/image/news/20260304/69a7f351125443813830.JPG ">