On June 25, Atlas Sunshine Power Group announced that. Atlas Energy Storage (e ‑ STORAGE), a subsidiary of its energy storage solutions business, has signed a supply agreement with a Florida electric utility company to provide 95MW/426MWh (DC). DC) Battery Energy Storage System (BESS). The project is scheduled to be installed in the second half of 2027 and is expected to be put into commercial operation in early 2028.

Atlas SolBank 3.0 Energy Storage System (Figure)
According to the agreement, Atlas Energy Storage (e-STORAGE) will provide a complete battery energy storage system (BESS) solution for the project. Including 5MWh SolBank 3.0 energy storage system with lithium iron phosphate (LFP) core, energy storage converter (PCS) and energy management system (EMS), all core equipment are independently developed, designed and manufactured by Atlas Energy Storage (e-STORAGE) to achieve transparent traceability of the supply chain. Provide customers with solid quality and compliance assurance. After the
project is put into operation, the energy storage system with a total capacity of 426MWh will release stored energy during peak hours, help power companies optimize energy dispatch, reduce power supply costs, and further enhance the flexibility and reliability of power grid operation.
This cooperation also marks the official entry of Atlas Energy Storage (e-STORAGE) into the Florida market. Under the background of the rapid growth of local solar energy installation scale and the continuous rise of seasonal peak power demand, large-scale energy storage is gradually becoming an important support to ensure the reliable operation of local power grid. Energy Storage Project

with Atlas SolBank 3.0 (Figure)
浙公网安备33010802003254号