Unlicensed command and illegal operation! Shanghai Baoshan "11.22" Tower Crane Accident Caused 1 Death and 2 Injuries, Investigation Report Released

2026-02-28 10:39:29

On February 26, the website of Baoshan District Government of Shanghai published the Investigation Report on "11.22" General Lifting Injury Accident of Block 0308-02, Unit BSP0-0103, Gucun Large Residential Community, Baoshan.

On February 26, the website of Baoshan District Government of Shanghai published the Investigation Report on "11.22" General Lifting Injury Accident of Block 0308-02, Unit BSP0-0103, Gucun Large Residential Community, Baoshan.

After investigation, it is confirmed that the "1111ž22" general lifting injury accident in the project of 0308-02 plot, BSP0-0103 unit, Gucun large residential community in Baoshan is a general production safety accident caused by workers'illegal operation and lack of on-site supervision. The investigation and analysis of the accident are reported as follows:

I. Relevant units of

the accident (I) Construction unit: Shanghai Zhaopan Real Estate Co., Ltd

. Shanghai Zhaopan Real Estate Co., Ltd. (Hereinafter referred to as "Zhaopan Real Estate Company") was established on July 19, 2024; Domicile: Floors 1-2, No.365, 367 and 377, Gubei East Road, Baoshan District, Shanghai; enterprise type: other limited liability company; legal representative: Qi Yanlong; unified social credit code: 91310113MADRA84314; business scope: licensed items: real estate development and operation; interior decoration of residential buildings. [For projects that must be approved according to the law, business activities can be carried out only after the approval of the relevant departments, and the specific business projects shall be subject to the approval documents or permits of the relevant departments] General projects: information technology consulting services; professional design services; landscaping construction; real estate brokerage; parking services; property management; non-residential real estate leasing; housing leasing; Construction, leasing and management of public rental housing within the scope of this Municipality. (

II) Construction unit: Shanghai Jingdong Construction Development Co., Ltd.

Shanghai Jingdong Construction Development Co., Ltd. (Hereinafter referred to as "Jingdong Construction Company") was established on June 29, 2005; Domicile: Room 443, No.201, Qinzhou Road, Xuhui District, Shanghai; Type of enterprise: limited liability company (invested or controlled by natural person); Legal representative: Zhang Yifeng. Unified Social Credit Code: 91310104777129081J; Business Scope: Permitted Items: Construction Project; Residential Interior Decoration; Professional Construction Operation. [For projects that must be approved according to the law, business activities can only be carried out with the approval of the relevant departments, and the specific business projects shall be subject to the approval documents or permits of the relevant departments] General projects: residential water and electricity installation and maintenance services; landscaping construction; property management; sales of building materials; wholesale of hardware products; retail of hardware products; real estate brokerage. [Except for the projects that must be approved according to the law, Shanghai Jingdong Construction Development Co., Ltd. shall carry out business activities independently according to the law with its business license.]

Shanghai Jingdong Construction Development Co., Ltd. holds the Work Safety License issued by the Shanghai Municipal Commission of Housing and Urban-Rural Development (No.: (Hu) JZ An Xu Zheng Zi (2006) 090094; the scope of permission: construction; Valid until October 27, 2028. Qualification Certificate of Construction Enterprise issued by the Ministry of Housing and Urban-Rural Development of the People's Republic of China, certificate number: D131110512; qualification category and grade: Grade I for general contracting of construction projects; valid until May 12, 2030.

(III) Labor Subcontractor: Shanghai Cailifeng Construction Labor Engineering Co., Ltd.

Shanghai Cailifeng Construction Labor Engineering Co., Ltd. (Hereinafter referred to as "Cailifeng Labor Company") was established on March 8, 2023; Address: Room 101, Building B, No.598, Jianguo West Road, Xuhui District, Shanghai; Type of enterprise: limited liability company (invested or controlled by natural person); legal representative: Ren Xiaoliang; unified social credit code: 91310104MACAAMLG7Y; business scope: permitted items: construction labor subcontracting; construction engineering design; construction engineering construction; professional construction operation; interior decoration of residential buildings. [For projects that must be approved according to the law, business activities can only be carried out after the approval of relevant departments, and the specific business items shall be subject to the approval documents or licenses of relevant departments] General items: indoor wooden door installation services; metal door and window construction; sales of building materials; sales of metal materials; retail of hardware products; sales of electronic components and electromechanical components; sales of mechanical equipment; Sales of special electronic equipment. [Except for the projects that must be approved according to law, Shanghai Cailifeng Construction Labor Engineering Co., Ltd. shall independently carry out business activities according to law with the business license]

Shanghai Cailifeng Construction Labor Engineering Co., Ltd. holds the Work Safety License issued by Shanghai Municipal Commission of Housing and Urban-Rural Development, with the serial number of (Hu) JZ An Xu Zheng Zi (2023) 090326; the scope of permission is construction; Valid until July 13, 2026. Holding the Qualification Certificate of Construction Enterprise (Certificate No.: D231802460); qualification category and grade: qualification of construction labor service enterprise; labor subcontracting is not graded (for record); valid until July 11, 2028.

(IV) Professional subcontractor: Shanghai Pangyuan Machinery Construction Co., Ltd.

Shanghai Pangyuan Machinery Construction Co., Ltd. (Hereinafter referred to as "Pangyuan Machinery Company") was established on February 26, 2010; domicile: Room 392, Zone E, Floor 3, Building 1, No.1288, Huateng Road, Qingpu District, Shanghai; Type of enterprise: limited liability company (invested or controlled by natural person), legal representative: Wang Hongxing; unified social credit code: 9131011855153309XA; Business scope: mechanical equipment installation engineering, construction machinery leasing, sales of mechanical and electrical accessories, hardware and electrical equipment, chemical products and raw materials (except dangerous, monitoring, precursor chemicals, civil explosives), metal structural parts processing, mechanical parts processing, repair, loading and unloading services, lifting equipment installation engineering. (

V) Tower crane labor service unit: Chizhou Golden Bee Construction Labor Subcontracting Co., Ltd.

Chizhou Golden Bee Construction Labor Subcontracting Co., Ltd. (Hereinafter referred to as "Chizhou Golden Bee Company") was established on July 23, 2020; Domicile: Xinhe Town Industrial Park, Qingyang County, Chizhou City, Anhui Province; Type of enterprise: limited liability company (sole proprietorship by natural person); Legal representative: Wu Fengge; Unified social credit code: 91341723MA2W1NHL8F (1-1); Business scope: Permitted items: construction labor subcontracting; urban distribution and transportation services (excluding dangerous goods); Road freight transport (excluding dangerous goods) [For projects that must be approved according to law, business activities can only be carried out with the approval of relevant departments] General projects: loading and unloading; information consulting services (excluding licensed information consulting services); information technology consulting services; human resources services (excluding job intermediary activities and labor dispatch services); enterprise management consulting; consulting and planning services; Carry out exclusive insurance agency business within the scope of authorization of the insurance company (with authorization) [except for licensed business,

(VI) Supervision unit: Shanghai Zhitong Construction Development Co., Ltd.

Shanghai Zhitong Construction Development Co., Ltd. (Hereinafter referred to as "Zhitong Construction Company") was established on August 22, 2001; Domicile: Room 623, No.371-385, No.359-367, Guangyan Road, Jing'an District, Shanghai; type of enterprise: joint stock limited company (non-listed, invested or controlled by natural person); legal representative: Hu Jijun; unified social credit code: 91310000703453874M; Business scope: engineering project management, engineering construction supervision, construction engineering consultation, engineering cost consultation, engineering equipment supervision, bidding agency, building materials sales, technology development, technology transfer, technical services and technical consultation in the field of construction engineering. [Projects that must be approved according to the law shall be approved by the relevant departments before business activities can be carried out]

Shanghai Zhitong Construction Development Co., Ltd. holds the Qualification Certificate for Project Supervision issued by the Ministry of Housing and Urban-Rural Development, with the certificate number of E131007999; the qualification level: Grade A for housing construction engineering supervision; Grade A for municipal engineering supervision; Valid until March 17, 2030.

2. Construction project contracting relationship

(I) Construction project construction contract: In October 2024, Zhaopan Real Estate Company and Jingdong Construction Company signed the Construction Project Construction Contract. Project name: Plot 0308-02 and 0314-05, Unit BSP0-0103, Gucun Large-scale Residential Community, Baoshan District (excluding pile foundation works). Project location: Gucun Town, Baoshan District, east to 0314-06 plot (public green space), west to 0308-01 plot (public green space), south to 0314-06 plot (public green space), north to Yanguan Road. Content of the Project: The total construction area is 200012.05 square meters, of which the above-ground construction area is 147062. The planned commencement date is October 25, 2024, the planned completion date is August 22, 2027, and the total planned construction period is 1032 calendar days. At the same time, the Agreement on Safety Production Responsibility was signed to clarify the safety production management responsibilities of both sides. Zhaopan Real Estate Company appointed Yang Mou-mou as the project manager, and Jingdong Construction Company appointed Jin Mou-mou as the project manager.

(II) Construction Subcontracting (Labor Service) Contract: In October 2024, Jingdong Construction Company and Cailifeng Labor Service Company signed the Construction Subcontracting (Labor Service) Contract. The scope and content of the subcontracting project: concrete structure masonry structure construction and corresponding supporting construction.The types of work involved include formwork workers (carpenters), concrete workers, steel workers, masonry workers, plumbing electricians, waterproof workers and other sporadic workers. The duration of the project is from October 25, 2024 to August 22, 2027. At the same time, the Agreement on Safety Production in Construction was signed, which clarified the responsibility of safety production management of both sides. Cailifeng Labor Service Company appoints Li Mou-mou as project manager, and Ding Mou-mou is responsible for safety management.

(III) Machinery Subcontract: In October 2024, Jingdong Construction Company and Pangyuan Machinery Company signed the Machinery Subcontract. The scope of the contract is the rental, installation and dismantling of tower cranes. The contract costs include monthly rental, access fees and labor costs. According to the contract, Pangyuan Machinery Company shall provide and equip sufficient licensed operators according to the transfer conditions of tower cranes. At the same time, the Agreement on Safety Production in Construction was signed, which clarified the responsibility of safety production management of both sides. Pangyuan Machinery Company appointed Guo Moumou as project manager.

(IV) Tower crane labor subcontract: Pangyuan Machinery Co., Ltd. and Chizhou Golden Bee Co., Ltd. signed the Labor Subcontract in January 2024, with the contract term ending on May 31, 2027.

(V) Construction Project Supervision Contract: On October 21, 2024, Zhaopan Real Estate Company and Zhitong Construction Company signed the Construction Project Supervision Contract. The scope of supervision is to supervise the construction quality, construction period, use of construction funds and safe and civilized construction of the project on behalf of the client. Service term of the supervision contract: tentatively from August 1, 2024 to December 31, 2027. Meanwhile, the Agreement on Safety of Construction Project Supervision has been signed to clarify the safety production management responsibilities of both parties. Zhitong Construction Company appointed Xie Mou-mou as the chief supervision engineer, and then submitted for approval to change the chief supervision engineer to Wang Mou-mou.

3. On December 29,

2018, Jingdong Construction Company applied to the State Intellectual Property Office for a patent for the steel platform of the elevator shaft, and obtained the Certificate of Utility Model Patent issued by the State Intellectual Property Office, Certificate No.9546895; Name of the utility model: a fixed tool-type operating platform in the high-rise elevator shaft; Patent No.: ZL2018 2 2273782. Elevator shaft steel platform experience calculation: qualified.

According to the investigation, Jingdong Construction Company has erected a hard quarantine measure to prevent falling every three layers (about 9 meters) in the wells of all commercial houses under construction, and the wells are blocked up and down by splicing steel plates and steel pipes.

4. Accident occurrence and emergency rescue

(1) On November 22, 2025, the accident occurred

in the project of 0308-02 and 0314-05 plots of BSP0-0103 units of Gucun large residential community in Baoshan District. Liu Moufa, Liu Moumeng and three workers in the carpentry class of Cailifeng Company started work at 6 o'clock. 56, three workers dismantled and installed aluminium formwork on the steel platform in the elevator shaft on the east side of the 14th floor of Building 17. Before the accident, two lifting wire ropes were hung under the hook of No.17 tower crane trolley, and a U-shaped shackle was hung on the wire rope respectively. Liu Mou-meng stood at the northeast corner of the steel platform and used tools to pry an aluminum template on the wall of the shaft and hook it. Xiang Mou-mou and Liu Mou-fa stood at the northwest corner and held the aluminum template. Then Liu Mou-fa gave a lifting signal to Bai Mou-mou, the driver of the No.17 tower crane, and lifted the aluminum template to the 15th floor to prepare for the installation of the aluminum template. During the lifting process of the tower crane, one of the U-shaped shackles with empty hooks was hung on the pedal at the northwest corner of the steel platform operating frame, and the steel platform was lifted, and the "corbel" stuck on the 13th floor under the east side of the rear steel platform moved from east to west and took off, and three workers and the steel platform fell together from the top of the shaft. During this period, it fell to the second floor after being buffered by the anti-falling hard quarantine facilities on the 12th, 9th, 6th and 3rd floors. After the fall, Liu Moumeng and Xiang Moumou climbed out of the elevator shaft door and found that Liu Moufa was still in the shaft. After the accident, Jingdong Construction Company immediately started the contingency plan, and removed Liu Moufa from the shaft, dialed 120 telephone calls, and sent three injured people to the North Hospital of Mount Hua Hospital for treatment and rescue. After diagnosis, Liu suffered skin abrasions; Xiang suffered minor injuries and was hospitalized. Liu died of ineffective rescue.

(2) Investigation

of the accident scene The accident occurred in Building 17, Block 0308-02, Unit BSP0-0103, a large residential community in Gucun, Baoshan. There is a tower crane with the site number of 17 on the south side of the building. The accident point is located at the elevator shaft on the east side of the 14th floor of the building. There is a yellow tower crane trolley hook above the elevator shaft, under which two lifting wire ropes are hung, one of which is hung with an aluminum formwork, and the other is hung with a U-shaped shackle. The elevator shaft is about 2100 mm wide and 1900 mm long. The aluminum formwork is attached to the wall. The steel platform of the elevator shaft has fallen to the second floor of the building. After investigation, the 12th, 9th, 6th and 3rd floors of the building are equipped with anti-falling platforms composed of steel plates and steel pipes, which have been collapsed by falling steel platforms layer by layer. The falling steel platform structure was left at the elevator shaft on the second floor, and a large amount of blood was left on the left side of the steel platform near the wall.

(3) Casualties and direct economic losses

caused by the accident resulted in one death and two injuries.

1.2.3.2

.

(IV) After the emergency rescue and disposal assessment

accident, Jingdong Construction Company and Cailifeng Labor Service Company immediately started the emergency response. Organize on-site rescue work, take proper measures, and do not cause secondary and derivative accidents. After assessment, the "11.22" accident information was submitted in a timely manner, the emergency response was rapid, the procedure was correct, and the on-site rescue and disposal was reasonable and effective

. (5)

After the accident, the relevant units actively cooperated with the accident investigation, quickly carried out the aftermath work, notified the family members of the deceased, soothed their emotions, and made the accident more serious. The social impact is reduced. On November 24, 2025, he signed the Agreement on Compensation for Industrial Death with his family members to complete the disposal of the aftermath.

5. Analysis of

the causes of the accident (1) Analysis of

the direct causes Bai Mou-mou, the driver of the tower crane of Pangyuan Machinery Company, accepted the command of Liu Mou-fa, a carpenter of Cailifeng Labor Service Company, who was not the commander, in the absence of the command of the signal department. In the process of lifting, the U-shaped shackle was hung on the operating frame of the elevator shaft platform, causing the platform to fall after lifting.

(2) Indirect cause analysis

1.2.3.4.5

. Failure to pass the inspection means. Timely find out and correct the illegal command and operation behaviors of the carpenters.

6.

The main problems

existing in the responsible units (1) Zhaopan Real Estate Company failed to strictly supervise the construction units and supervision units to implement the on-site management responsibilities in accordance with the safety management norms of construction projects, and the supervision and inspection efforts were insufficient.

(2) Although Jingdong Construction Company has taken certain safety protection measures to reduce the occurrence of accidents, the supervision and inspection of the construction site have not been strictly implemented, and the absence of supervision and illegal operation of the operation site have not been found in time.

(3) Cailifeng Labor Service Company did not strictly implement the safety management requirements of construction operations, and did not find and stop workers'illegal command of tower crane lifting operations in time.

(4) Pangyuan Machinery Company did not strictly implement the safety management requirements for construction operations 3, and did not timely inspect and stop the illegal lifting operations of tower crane drivers.

(V) Zhitong Construction Company did not fully fulfill its quality and safety supervision responsibilities. Although it issued supervision rectification orders for lifting operations of non-signal workers for many times in the daily supervision and inspection process, it did not promptly supervise the implementation of the closed-loop rectification and achieved substantial rectification results. In this accident, the hidden danger of illegal operation in the lifting operation of the tower crane at the accident point was not found by timely inspection.

7. Suggestions

on the identification and handling of accident liability (1) Opinions

on the identification and handling of the responsibility of the person responsible for the accident 1. Unlicensed and illegal command of tower cranes for lifting operations, resulting in the steel platform being lifted and lifted by U-shaped unloading hooks, causing accidents, and being responsible for the occurrence of accidents. Because he had died in the accident, he was not investigated.

2.When there is no command signal of the signal worker on the site, he obeys the command of the worker to carry out the lifting operation in violation of the regulations, resulting in the empty hook hanging to the steel platform operating frame, causing the steel platform to fall, and is responsible for the accident. It is suggested that the Emergency Management Bureau of Baoshan District give him administrative punishment according to law.

(2) Suggestions

on the responsibility determination and administrative punishment of those responsible for the accident 1. Failure to strictly supervise and inspect the work of safety production at the construction site, failure to strictly implement the investigation of hidden dangers, failure to discover and eliminate hidden dangers of production safety accidents in time, and responsibility for the management of accidents. It is suggested that the Emergency Management Bureau of Baoshan District should impose administrative penalties according to law.

2. Failure to strictly supervise and inspect the safety production situation of the unit, timely investigation of hidden dangers of production safety accidents, and management responsibility for the occurrence of accidents, it is suggested that the Emergency Management Bureau of Baoshan District impose administrative penalties according to law.

3. Failure to strictly implement the safety production rules and regulations and operating rules of the unit, supervise and inspect the safety production work of the unit, fail to eliminate the hidden dangers of production safety accidents in time, and be responsible for the management of accidents. It is suggested that the Emergency Management Bureau of Baoshan District should impose administrative penalties

according to law. 4. It is suggested that the Emergency Management Bureau of Baoshan District should impose administrative penalties according to law if it fails to strictly implement and implement the safety production rules and regulations of the unit, fails to strictly supervise and inspect the safety production work at the construction site, fails to eliminate the hidden dangers of production safety accidents in time, and is responsible for the management of accidents.

5. Failure to strictly inspect the safety production status of the construction site, to timely investigate the potential safety hazards of the construction site, and to be responsible for the management of the accident, it is suggested that the Emergency Management Bureau of Baoshan District impose administrative penalties according to law.

6. Failure to strictly inspect the work safety of the unit, to timely investigate the hidden dangers of production safety accidents at the construction site, and to be responsible for the management of accidents, it is suggested that the Emergency Management Bureau of Baoshan District impose administrative penalties according to law.

7. Failure to strictly implement the investigation of potential safety hazards on the construction site, failure to fully consider the potential safety hazards in dangerous construction operations, failure to promptly request and urge the construction unit to rectify the closed-loop, and responsibility for the management of the accident, it is suggested that the Baoshan District Construction and Management Committee should deal with it according to law.

(III) Responsibility determination and administrative penalty recommendations

for the unit responsible for the accident 1.2.3.4

.

(IV) Other handling recommendations

1.0 HTM L0 UNK1 52.0 HTML 0 UNK1 6. Accident prevention and rectification measures 0 HTML 0 UNK1 7 (1) Zhaopan Real Estate Company, Jingdong Construction Company, Cailifeng Labor Service Company, Pangyuan Machinery Company and Zhitong Construction Company shall hold a special meeting on accidents in accordance with the requirements of "four not letting go" to inform the accident situation and draw inferences from each other. Deeply draw lessons from the accident, carefully analyze the causes of the accident, and take corrective measures to prevent the accident from happening again in view of the problems exposed in the accident. 0 HTML0 UNK1 8 (2) Cailifeng Labor Service Company and Pangyuan Machinery Company should further implement the main responsibility of safety production, carry out in-depth accident analysis, strengthen warning education, and rationally arrange safety management personnel in the operation area. Strictly implement the safety production management regulations, implement the industry standards, strengthen the management of the operation site, strengthen the post safety awareness education of employees, fully consider the safety of the site operation environment, put an end to the habitual illegal and risky operation behavior of workers, and strengthen the input of various safety measures. 0 HTML0 UNK1 9 (III) Zhaopan Property Company shall further strengthen the implementation of unified and coordinated management responsibilities, strictly restrict the implementation of safety production responsibilities by participating units, strengthen on-site inspection and supervision, and effectively lead the identification and control of safety risks and the investigation and management of potential accidents at the operation site. Carry out the investigation of hidden dangers in the working environment and construction process in an all-round way, further sort out and clarify the management responsibilities and control norms of all parties, pay close attention to the habitual violations on the working site, and strictly implement the company's internal reward and punishment system. 0 HTML 0 UNK2 0 (4) Jingdong Construction Company should further strengthen the supervision and management of subcontractors, take the lead in organizing the investigation of hidden dangers on the construction site, urge subcontractors to strictly implement the requirements of construction safety management, pay close attention to the illegal operation on the construction site, and disobey the general contracting management of construction units. Form an effective closed-loop rectification to prevent accidents from happening again. 0 HTML0 UNK2 1 (5) Zhitong Construction Company shall further strengthen the performance of the safety supervision responsibility of project supervision, strengthen the supervision of the construction site, and ensure that the supervisors are in place and perform their duties. Potential safety hazards and problems should be found, reported and rectified in time to form a closed loop and achieve substantive rectification results. At the same time, we should strengthen the training and education of supervisors, enhance their safety awareness and supervision ability, ensure that the supervision work is scientific, standardized and effective, and provide a strong guarantee for the safety of the project. 0 HTML0 UNK2 2 (6) The competent authorities of the construction industry shall strictly supervise and urge the relevant units of the construction project to implement the main responsibility for safe production, strengthen project supervision, establish a long-term mechanism for safe production, regularly analyze the weak links and hidden dangers of accidents in construction, and ensure the effective implementation of the safety system. We will intensify the investigation and punishment of violations of laws and regulations, punish units that refuse to rectify or fail to rectify according to law, and include them in the list of dishonesty. At the same time, we should strengthen the safety education and training of employees, enhance safety awareness and operational skills, and reduce the occurrence of safety accidents from the source. 0 HTML 0 UNK2 3 (7) The people's government of Gucun Town should further standardize the functions of supervision, supervision and guidance of functional departments. Strengthen the daily inspection of construction sites within the jurisdiction, increase the intensity of inspection, investigate potential safety hazards according to professional standards, put forward rectification measures, rectification is not in place without acceptance, and coordinate with higher authorities to rectify. At the same time, we should improve the system of accident hidden danger investigation and management, implement closed-loop management, and ensure timely rectification of hidden dangers. In view of the common problems, we should conduct in-depth research with relevant departments to plug security loopholes from the source and prevent similar accidents. In addition, we should improve the emergency response mechanism, start the plan quickly when safety accidents occur, and control the situation. Strengthen the publicity and education on the safety production of the construction unit, and mention Article 7 of the Machinery Subcontract: Party B's Rights and Obligations (II) Party B's Obligations.. The operators must obey Party A's management, obey Party A's command and arrangement, and operate in strict accordance with JGJ33-2012 Technical Regulations for Safety in the Use of Construction Machinery. Mechanical Equipment Subcontracting Safety Agreement IV. Party B's mechanical operators shall obey the arrangement and command of Party A's relevant construction personnel, abide by the rules and regulations, and strictly prohibit illegal operation; and have the right to refuse the illegal command of Party A's relevant construction personnel. 5. Party B's random operators must hold valid operation certificates and abide by the operating procedures of the corresponding machinery during production. 0 HTML0 UNK2 4 Accident Investigation Team of Baoshan District Government 0 HTML0 UNK2 5 January 13, 2006 0 HTML0 UNK2 61.3. If Party a violates the aforementioned obligations, the relevant responsibilities and expenses for the work injuries and accidents of the outsourced project personnel shall be borne by Party A. 0 HTML0 UNK2 7 2. Technical Specification for Safety of Construction Machinery (JGJ33-2012) 4. Construction hoisting machinery: 4.1. When the signal is unclear or wrong, the operator should refuse to implement. 4.1.0 HTML0 UNK2 8 3. Machinery Subcontract Article 7: Party B's Rights and Obligations (II) Party B's Obligations 3.. Operators must obey Party a's management, obey Party a's command and arrangement, and operate in strict accordance with JGJ33-2012 Technical Regulations for Safety in the Use of Construction Machinery. Mechanical Equipment Subcontracting Safety Agreement IV. Party B's mechanical operators shall obey the arrangement and command of Party A's relevant construction personnel, abide by the rules and regulations, and strictly prohibit illegal operation; and have the right to refuse the illegal command of Party A's relevant construction personnel. 5. Party B's random operators must hold valid operation certificates and abide by the operating procedures of the corresponding machinery during production.

All can be viewed after purchase
Correlation

On February 26, the website of Baoshan District Government of Shanghai published the Investigation Report on "11.22" General Lifting Injury Accident of Block 0308-02, Unit BSP0-0103, Gucun Large Residential Community, Baoshan.

2026-02-28 10:39:29