Carbide slag enterprises shall give appropriate compensation to non-carbide slag enterprises for the increased kiln shutdown time during non-peak period, and the compensation standard shall be determined by both parties through consultation. The industrial and telecommunications departments of the
League cities should arrange the deployment in advance, reverse the time nodes, and guide and urge the carbide slag enterprises to actively communicate and negotiate with the non-carbide slag enterprises by organizing special promotion meetings between the carbide slag enterprises and the non-carbide slag enterprises, so as to ensure that the replacement agreement is signed on time. For carbide slag enterprises that have not signed the replacement agreement within the time limit, the industry and information department of the League City, together with the ecological environment department, must send special personnel to supervise the site to ensure that the kiln will be shut down from 0 o'clock on November 1 and can only be operated after the replacement agreement is signed.
When non-carbide slag enterprises provide kiln shutdown replacement time, they must provide the same amount of air pollutant emission indicators at the same time, and reduce the emission allowance at the same time according to the replacement days; carbide slag enterprises must use this indicator on the premise that their own emission indicators are insufficient and the production does not exceed 110% of the daily production capacity. Capacity replacement agreements and public documents shall be used as the basis for the verification of the total amount of pollutant discharge permits.
(2) Undertake the task of co-disposal of hazardous wastes. On the basis of ensuring the maximum temporary storage of the storage depot, the clinker production line undertaking the co-disposal of hazardous wastes shall reduce the production load to the minimum according to the inventory of hazardous wastes and the amount to be disposed of in the heating season, on the premise of meeting the task of co-disposal. After the end of the staggered peak period, the production load should continue to be reduced to offset the energy consumption and pollutant emissions generated by the minimum production load operation in the staggered peak period of the heating season.
The enterprise shall submit an application to determine the minimum production load and operation time limit, as well as the production load and operation time limit in non-heating season and non-peak period according to the disposal amount of hazardous waste in peak period, and formulate a specific plan for peak period staggering and production limitation. After the preliminary examination by the local League Municipal Bureau of Ecology and Environment, it will be submitted to the Department of Ecology and Environment before October 20, and will be examined and confirmed by the Department of Industry and Information Technology.
(Three) production lines that undertake residential heating tasks. In the heating season, priority should be given to the protection of residential heating, and the peak staggering time should be supplemented at one time during the non-heating season and non-peak staggering production period. From the end of the heating period, the kiln will be shut down immediately to make up for the peak staggering time of 5 months. Relevant supporting materials such as approval and filing of heating projects, completion acceptance documents, service contracts and service qualifications shall be examined by the departments of industry and information technology and ecological environment of the League City, and submitted to the Department of Industry and Information Technology and the Department of Ecological Environment of the Autonomous Region for filing before the corresponding differentiated peak staggering can be implemented.
(4) Rules for handling special matters. If the peak-shifting replacement time provided by non-carbide slag enterprises overlaps with the peak-shifting kiln shutdown time in summer and autumn, it shall be postponed and shall not be offset. Kiln shutdown time during non-peak period shall not be included in the peak-shifting production time in heating season. The unplanned shutdown time due to special reasons such as heavy pollution weather, overhaul and shutdown of kilns shall not offset the off-peak production time in the heating season.
(5) Procedures for adjusting the peak staggering plan. Once the plan of kiln shutdown for peak staggering production is reported, it shall not be changed in principle, and the enterprise shall not open the kiln in advance without the approval of the competent department of the autonomous region. If an enterprise really needs to adjust the peak staggering plan due to special reasons such as safety in production, prevention and control of air pollution, and guarantee of supply of key projects, it shall submit a written application to the departments of industry, information and ecological environment of the League city 15 working days ago; After fully soliciting the opinions of other cement enterprises within the jurisdiction, taking into account the market supply and demand and air quality as a whole and strictly examining and verifying, the departments of industry and information and ecological environment of the League City shall report to the Department of Industry and Information Technology and the Department of Ecological Environment of the Autonomous Region for examination and verification 10 working days ago. In principle, each enterprise is only allowed to adjust once in a peak-shifting year; the adjusted days of kiln shutdown shall not be lower than bottom line of the minimum days of kiln shutdown.
4. Work requirements
(1) Clear division of responsibilities. The League Municipal Bureau of Industry and Information Technology is responsible for reviewing the compliance of peak-shifting production plans and peak-shifting rules of the enterprises under its jurisdiction, and guiding the peak-shifting replacement of carbide slag enterprises and non-carbide slag enterprises; the Bureau of Ecological Environment is responsible for reviewing the peak-shifting production of collaborative disposal of hazardous waste enterprises, and guiding the convergence of peak-shifting production plans of enterprises with the requirements of environmental protection management and control in the region.
(2) Implementing hierarchical management of "red, yellow and green". For those who run for more than 7 days at the off-peak period, fail to stop and start according to the time node of the public announcement, fail to sign the off-peak replacement agreement on time and stop the kiln, fail to perform the contract or partially perform the contract after signing the agreement, stop production in the upstream of the carbide slag enterprise itself, and fail to perform the off-peak production by adding a large amount of limestone to the carbide slag enterprise. The cities and enterprises of the league that fail to carry out the production according to the determined load, fail to implement the rules and regulations of the industry, fail to keep faith, fail to report truthfully and practice fraud shall be given a red card warning; the cities and enterprises of the league that operate for 1-6 days beyond the plan shall be given a caution; the cities and enterprises of the league that stop production on time and sign a replacement agreement shall be given a green card commendation. If an interview is conducted with an alliance city and an enterprise that has received a red card warning or two caution, and the kiln is still carrying out peak staggering production or has not signed a replacement agreement after the interview, the violation information shall be included in the list or blacklist of serious illegal and dishonest enterprises through the national enterprise credit information publicity system (Inner Mongolia), and the enterprise legal person shall be included in the list of serious dishonesty. Joint punishment shall be imposed on enterprises that violate laws and regulations and their principal responsible persons. At the same time, in the list of cement clinker production lines updated and announced annually by the Office of Industry and Information Technology of the Autonomous Region in the next year, it is indicated that it is restricted to be traded as a capacity replacement index and included in the key supervision objects of the ecological environment department.
(3) Strengthen supervision and inspection. The Office of Industry and Information Technology of the Autonomous Region, together with the Department of Ecology and Environment, will incorporate peak-staggering production into the scope of provincial supervision, report the completion of peak-staggering production tasks annually, and carry out special supervision and inspection from time to time. The Municipal Bureau of Industry and Information Technology of the League should earnestly fulfill its leading responsibility, strengthen communication and coordination with the ecological environment departments, and coordinate the work of peak staggering production. Supervise and urge enterprises to stop kilns according to the prescribed time and conduct guidance, supervision and inspection, supervise enterprises to stop kilns on site before October 31, inspect the actual situation of kiln shutdown before March 31, and conduct spot checks from time to time during the period. If necessary, the power consumption of each enterprise can be monitored in real time. Establish a scheduling system for peak-staggering production (from November, each league city shall report the implementation of peak-staggering production of the previous month before the 5th day of each month until the end of the peak-staggering period). For enterprises that have not completed the task of peak staggering production, the relevant League cities urge them to rectify within a time limit. The Bureau of Ecology and Environment should strengthen the inspection of the implementation of peak staggering production by means of on-line monitoring system of air pollution and emission permits, and investigate and punish the illegal acts of excessive discharge, falsification of monitoring data and discharge of pollutants in violation of emission permits according to law.
(4) Give full play to the role of trade associations and capacity removal platforms.The Cement Association of the Autonomous Region shall closely follow up and analyze the cement market of the whole region together with the key enterprises, and put forward the peak-staggering production plan according to the factors such as environmental protection, energy consumption, environmental sensitive period and market situation. Support the association to set up a special team for peak staggering production supervision, establish peak staggering production account files, and implement normal supervision. The Cement Association of Inner Mongolia Autonomous Region is encouraged to take the lead and work with cement clinker enterprises in the central and western regions to continuously optimize the distribution of cement clinker production capacity in the central and western regions. It is entrusted by the departments of industry, information and ecological environment of the autonomous region to regularly verify and report the implementation of peak staggering production, and timely feedback the problems found in the work and the reasonable demands of enterprises. Strengthen communication and coordination with China Cement Association and Heilongjiang, Jilin, Liaoning, Hebei, Shanxi, Shaanxi, Ningxia and other surrounding provinces and regions, establish a cross-regional coordination and linkage mechanism, and realize the smooth operation and effective development of the industry. Support the capacity removal platform (Inner Mongolia Cement Group) to prepare a peak-shifting replacement scheme for carbide slag and non-carbide slag, coordinate non-carbide slag enterprises to provide reasonable replacement time, and ensure smooth and orderly clinker relief.
(5) Strengthen publicity and guidance. Increasing the intensity of peak staggering production is still the most effective way and the best means to promote the structural reform of the supply side and alleviate the serious contradiction of excess capacity in the industry. The League cities should earnestly sum up good experiences and good practices and publicize them, and promptly report and deal with the negative examples that are not implemented in place. It is necessary to further unblock the reporting channels, promptly disclose to the public telephone, fax, e-mail, and other reporting channels, and publicly expose enterprises that do not implement the rules and regulations of the industry, do not keep their promises, and do not carry out off-peak production.
(6) Time requirements for submission. The kiln shutdown scheme for each clinker production line, the peak-shifting replacement scheme and peak-shifting replacement agreement for carbide slag enterprises, and the peak-shifting production limitation scheme for collaborative disposal of hazardous wastes shall be submitted to the Department of Industry and Information Technology and the Department of Ecological Environment of the Autonomous Region respectively before 12:00 on October 20 after being reviewed by the Municipal Bureau of Industry and Information Technology and the Bureau of Ecological Environment of the League. After the completion of peak-staggering production, the departments of industry, information technology and ecological environment of the League cities shall check the actual shutdown of cement clinker production lines, the operation of carbide slag enterprises and hazardous waste co-disposal enterprises in their respective jurisdictions, and report the verification results to the Department of Industry and Information Technology and the Department of Ecological Environment of the Autonomous Region respectively before April 10.
Contact and Tel:
Metallurgical Building Materials Industry Division of the Office of Industry and Information Technology, Zhou yuanchao, 0471-4866490. Department of Atmospheric Environment, Department of
Ecology and Environment, Zhao Peng, 0471-4632053. Notice
is hereby given.