The Digital New Energy DataBM. Com has learned that recently, The bidding for the second batch of photovoltaic module frame procurement of Huadian Group in 2026 and the photovoltaic module centralized procurement project of China Energy Construction in 2026 have been opened.
This time, the frame mining scale of Huadian is 5G W, and the centralized mining scale of Zhongneng is 15G W.
It is reported that a total of 26 enterprises participated in the bidding of Huadian 5GW frame mining project, with a quotation range of 0.665-0.75 yuan/W ; A total of more than 30 enterprises participated in the bidding of China Energy Construction 15G W Centralized Procurement Project, with a quotation range of 0.69-0.788 yuan/W . It should be
noted that the 15GW centralized procurement of Zhongnengjian is divided into 6 bid sections to purchase TOPCon, BC and HJT components respectively. This bid opening is the quotation of TOPCon and BC bid sections, in which the unit price of TOPCon is 0.69-0.77 yuan/W . The bidding price of BC is 0.76-0.788 yuan/W.
浙公网安备33010802003254号