China Railway Wins the Bid for Ten Billion Projects!

2026-02-11 09:09:46

According to the feasibility study report of the project, the general situation of the project is as follows (subject to the Project Application Report approved by the competent investment department): The Sanmenxia-Luoning Expressway Project starts from Sanmenxia City, connects with Lianhuo Expressway, runs southeast through Sanmenxia Hubin District, Shaanzhou District and Luoning County of Luoyang City, and ends at the north side of Xishandi Township of Luoning County, connecting with Luolu Expressway. The route is 64.37 kilometers long, including 39.63 kilometers in Sanmenxia City and 24.74 kilometers in Luoyang City.

Chongzuo City Jiangzhou District No.5 Junior High School Phase II Project

Bid Winning Information

No.1: Total Bid Price of China Railway Shanghai Engineering Bureau Group No.5 Engineering Co., Ltd.

92618887.61

: Puning City Nanjing Town Water Supply Pipe Network Renewal and Reconstruction Project

Bid-winning Information

No.1: China Railway Guangzhou Engineering Bureau Group Co., Ltd.

China Railway (Guangzhou) Investment Development Co., Ltd.

Bid Price (RMB) 86035933.641

: RMB 0.80 billion: Information

on

bid winning for EPC of Comprehensive Treatment Project of Drainage Facilities in Jiaxiu Area, Nanming District, Guiyang City Name of the bid winner:

China Railway Erju First Engineering Co., Ltd. 0H TML0 183421200.00 3 Guizhou Architectural Design & Research Institute Co., Ltd.0 HTML0 183421200.00 4 Bid price: 183421200.00 CNY0 HTML0 183421200.00 5.2 billion: EPC of design and construction of comprehensive treatment project of drainage facilities in Nanming District0 HTML0 183421200.00 6 Bid winning information0 HTML0 183421200.00 7 Name of the bid winner: 0 HTML0 195415655.00 8 China Railway Wuju Group Construction Engineering Co., Ltd. 0 HTML0 195415655.00 9 Guizhou Architectural Design & Research Institute Co., Ltd. 0 HTML0 UNK2 0 Bid price: 195415655.00 yuan 0 HTML0 UNK2 1 Baiyun District Maijia District Sewage Pipe Network Construction Project Design, Construction General Contracting 0 HTML0 UNK2 2 Bid Winning Information 0 HTML0 UNK2 3 Name of Bid Winner: 0 HTML0 UNK2 4 China Railway Wuju Group Construction Engineering Co., Ltd. 0 HTML0 UNK2 5 Zhengdao Design Co., Ltd. 0 HTML0 UNK2 6 Bid Price: The quotation of design service fee is 45% downward 0 HTML0UNK 27 Construction and installation fee quotation is 5% 0 HTML0 UNK2 8.92 billion: Rongxi District Centralized Commercial Project Construction General Contracting 0 HTML0 UNK2 9 Bid Winning Information 0 HTML0 UNK3 0 No.1: China Railway Construction Engineering Group Co., Ltd. 0 HTML0 UNK3 1 China Railway Construction Engineering Group Development Co., Ltd. 0 HTML0 UNK3 2 Bid Price (RMB 10,000): 92137 1390160 HTML0 UNK3 3.52 billion: Reconstruction and Expansion of Precast Concrete Component Works of G50 Gezidun Junction to Anhui-Hubei Boundary Section of Shanghai-Chongqing Expressway 0 HTML0 UNK3 4 Bid Winning Information 0 HT ML0 UNK3 5 First place: China Railway Major Bridge Engineering Group Co., Ltd. 0 HTML0 UNK3 6 Bid price (RMB): 526663259.020 HTML 0 UNK3 710.7 billion: Franchisee of Sanmenxia-Luoning Expressway Franchise Project 0 HTML0 UNK3 8 Construction site: Hubin District, Shaanzhou District, Sanmenxia City Luoning County, Luoyang City. 0 HTML0 UNK3 9 Project overview: According to the feasibility study report of the project, the project overview is as follows (subject to the Project Application Report approved by the competent investment department): The Sanmenxia-Luoning Expressway Project starts from Sanmenxia City, connects with Lianhuo Expressway, and runs southeast through Sanmenxia Hubin District, Shaanzhou District and Luoning County of Luoyang City. The terminal point is located on the north side of Xishandi Township, Luoning County, and connects with Luolu Expressway. The route is 64.37 kilometers long, including 39.63 kilometers in Sanmenxia City and 24.74 kilometers in Luoyang City. 0 HTML0 UNK4 0 Project Scale: This project is a new expressway project, including subgrade and pavement, bridges and culverts, tunnels, crossing works, traffic works and facilities along the line, greening works, temporary works, etc. The project adopts the technical standard of two-way four-lane expressway. The design speed is 100 km/H and the width of the integral roadbed is 26 meters. 0 HTML0 UNK4 1 The construction scale of this project is as follows (subject to the Project Application Report approved by the competent investment authority): 8113.2 mu of permanent land; 6.59 million cubic meters of filling, 18.2902 million cubic meters of excavation; 913000 square meters of asphalt concrete pavement; 61 bridges with a 25317 of m (including main bridges in the interchange area), including 3 extra-large bridges of 4,181m, 53 large bridges with a 20714 of m, 5 medium bridges of 421m; 105 culverts; 1 tunnel of 420m; 7 interchanges, including 2 hub interchanges and 5 service interchanges; 6 separated overpasses of 580m, 21 passages, 22 overpasses, 5 toll stations, 1 service area, 1 monitoring and communication sub-center, and 1 maintenance work area. 0 HTML0 UNK4 2 Prophase and construction period: 3.5 years. 0 HTML0 UNK4 3 Total Investment: The total investment of this project is 10.751 billion yuan (the final total investment of the project is subject to the budget approved by the competent department). 0 HTML0 UNK4 4 Financing Plan: The total investment of this project is estimated to be 10.751 billion yuan, and the proportion of project capital is 20%, about 2.150 billion yuan. The capital comes from the concessionaire's own funds, and the remaining funds are about 8.601 billion yuan, which are raised by the project company funded by the concessionaire in accordance with the law and regulations. The local government of the project will not provide government investment support and operation subsidies during the whole franchise period, such as the construction period and the operation period. 0 HTML0 UNK4 5 Bidding scope: The scope of this bidding is the bidding for the concessionaire of the concession project of Sanmenxia-Luoning Expressway. Operation mode of UNK4: After winning the bid, the concessionaire shall establish a project company in accordance with the Company Law of the People's Republic of China and other relevant laws and policies. The project company shall be responsible for the whole process of project planning, fund raising, construction implementation, operation management, debt repayment, asset management and project transfer, and shall operate independently and be responsible for its own profits and losses. After the expiration of the franchise period stipulated in the franchise agreement, the highway (including land use right), highway ancillary facilities, related information and related rights shall be transferred to the transportation authorities of Sanmenxia and Luoyang City free of charge in accordance with the franchise agreement. 0 HTML0 UNK4 7 Implementation: Build-Operate-Transfer (BOT). 0 HTML0 UNK4 8 Franchise period: The tentative franchise period of this project is 33.5 years, including the early stage, the construction period and the operation period (including the charging period). Among them, the preliminary and construction period is 3.5 years, and the operation period (including the charging period) is tentatively limited to 30 years. 0 HTML0 UNK4 9 Bid winning information 0 HTML0 UNK5 0 Bid winner: 0 HTML0 UNK5 1 Sponsor: China Railway Wuju Group Co., Ltd. 0 HTML0 UNK5 2 Consortium member: China Railway Capital Co., Ltd. 0 HTML0 UNK5 3 China Railway Transportation Investment Group Co., Ltd. 0 HTML0 UNK5 4 Henan Construction Group Group Co., Ltd. 0 HTML0 UNK5 5 China Railway Wuju Group First Engineering Co., Ltd. 0 HTML0 UNK5 6 China Railway Wuju Group Mechanization Engineering Co., Ltd. 0 HTML0 UNK5 7 China Railway Wuju Group Road & Bridge Engineering Co., Ltd. 0 HTML0 UNK5 8 Bidding Rate: Government Side Additional Revenue Distribution Proportion 60.00% 0HTML0UNK59

All can be viewed after purchase
Correlation

According to the feasibility study report of the project, the general situation of the project is as follows (subject to the Project Application Report approved by the competent investment department): The Sanmenxia-Luoning Expressway Project starts from Sanmenxia City, connects with Lianhuo Expressway, runs southeast through Sanmenxia Hubin District, Shaanzhou District and Luoning County of Luoyang City, and ends at the north side of Xishandi Township of Luoning County, connecting with Luolu Expressway. The route is 64.37 kilometers long, including 39.63 kilometers in Sanmenxia City and 24.74 kilometers in Luoyang City.

2026-02-11 09:09:46