Recently, Jinhua Municipal Bureau of Ecology and Environment released the EIA information announcement of Zhejiang Jinyuan Cement Co., Ltd. for the capacity replacement project of the cement clinker production line with a daily output of 4000 tons and the technical renovation project of using cement kilns to co-dispose of washed fly ash (two in one). The original two 2000t/d production lines of the project will be "dismantled and renovated", one will be dismantled and the other will be expanded and upgraded. After upgrading, the daily output of clinker will be 4000 tons, the annual output of clinker will be 691700 tons, and the resource utilization project of 30000 tons/year washed fly ash will be supported.

Zhejiang Jinyuan Cement Co., Ltd. originally has two cement production lines, with a single production line capacity of 2000 tons of cement clinker per day and a total production line capacity of 4000 tons of cement clinker per day. The transformation plan of this project is to dismantle one production line, expand and upgrade one production line, and replace the production capacity of the production line.
Main transformation contents: transformation of waste gas treatment system of raw material final grinding, transformation of preheater cyclone, capacity expansion of decomposition furnace, capacity expansion and transformation of cooler, transformation of high-efficiency energy-saving machine and energy-saving motor, intelligent safety supervision and other technical upgrading and transformation construction. After
upgrading and transformation, it will reach a cement clinker production line with a daily output of 4000 tons and an annual output of 691700 tons of clinker. The scope of transformation includes the cement production line and supporting auxiliary facilities from limestone crushing to the delivery of finished cement products. At the same time, supporting 30000 tons/year water washing fly ash resource utilization project.
浙公网安备33010802003254号