Recently, the public resources trading platform of the Xizang announced that the successful candidate for EPC project (the first tender section) of the 4000 t/d cement clinker production line relocation project of Langxian Gaozheng Building Materials Co., Ltd. of the Xizang has entered the stage of public announcement.

The announcement shows that the top three successful candidates are Tianjin Cement Industry Design and Research Institute Co., Ltd., Chengdu Building Material Industry Design and Research Institute Co., Ltd., China Railway 19th Bureau Group First Engineering Co., Ltd., and Anhui Conch Building Material Design and Research Institute Co., Ltd.

It is understood that the project intends to adopt a new dry pre-decomposition production process, using six-stage preheater, SCR denitrification system, oxygen-enriched combustion technology, to build the first level of energy consumption, ultra-low emission production line of Xizang, to meet the future needs of special cement production capacity expansion.
The goal is to build a first-class, Xizang, intelligent and environmentally friendly green factory in China. A 4000t/d clinker cement production line supporting 6MW pure low-temperature waste heat power generation will be built, with an annual output of 1.2 million tons of clinker and 1.4 million tons of cement, including 350,000 tons of P.MH42.5 cement, 350,000 tons of P.LH42.5 cement and 700,000 tons of P.O42.5 cement.
浙公网安备33010802003254号