Generally speaking, the shutdown time in September was slightly shortened, and the capacity utilization rate was improved.

In September

2025, the high temperature weather subsided, the construction progress of downstream construction sites and mixing stations began to improve, and the demand gradually recovered. Although the overall peak staggering efforts were still strong, most areas showed a slight weakening. Generally speaking, the shutdown time in September was slightly shortened, and the capacity utilization rate was improved. More data, market analysis and research reports can be found in cement big data (https://data.ccement.com/).

All can be viewed after purchase
Correlation

Generally speaking, the kiln shutdown time in March is relatively long, and the capacity utilization rate is at a low level.

2026-04-08 16:35:01

Generally speaking, the kiln shutdown time in February is relatively long, and the capacity utilization rate is at a low level.

2026-03-03 15:26:59

Generally speaking, the shutdown time in January was extended as a whole, and the utilization rate of production capacity decreased.

2026-02-04 16:48:06

Generally speaking, the kiln shutdown time in December has been extended as a whole, and the capacity utilization rate has decreased.

2026-01-06 15:03:52

Generally speaking, the shutdown time of the kiln in November was extended as a whole, and the utilization rate of production capacity decreased.

2025-12-03 15:19:17

Generally speaking, the shutdown time in October was slightly shortened, and the capacity utilization rate was improved.

2025-11-03 15:08:42

Generally speaking, the shutdown time in September was slightly shortened, and the capacity utilization rate was improved.

2025-10-09 13:33:13

Generally speaking, the kiln was shut down for a long time in August, and the capacity utilization rate was at a low level.

2025-09-02 15:21:28

Generally speaking, the kiln was shut down for a long time in July, and the capacity utilization rate was at a low level.

2025-08-04 14:55:48

Generally speaking, the kiln was shut down for a long time in May, and the utilization rate of production capacity was low.

2025-06-05 13:15:41

In October last year, there were reports of improper use of forklifts as cranes in the cement department, and this website has made a safety reminder. In the New Year, a cement enterprise upgraded its packaging and launched a ton packaging project. Although the site selection, construction, equipment assembly and other links are orderly, and the palletizing robot is used to stack the small bags of cement, the forklift truck is still improperly used in the process of transferring and loading from the stacking position. This time the forklift is larger, unlike the last time the forklift was installed with a frame hanger, but the nature is the same, the forklift is used as a crane. This situation is regrettable.