2025, the high temperature weather subsided, the construction progress of downstream construction sites and mixing stations began to improve, and the demand gradually recovered. Although the overall peak staggering efforts were still strong, most areas showed a slight weakening. Generally speaking, the shutdown time in September was slightly shortened, and the capacity utilization rate was improved. More data, market analysis and research reports can be found in cement big data (https://data.ccement.com/).
浙公网安备33010802003254号