Project Name: Plot 105-01, Huangpu District Announcement of
Successful Candidates for the New Project of Bile Middle School Construction Location: Plot 105-01, Huangpu District East to Zhaozhou Road, west to Shunchang Road, north to Yongnian Road, south to Xujiahui Road, 105-02 and 105-03 Plots
Construction Content: Build a 36-class middle school. The main construction contents include: building a new teaching building in the north area of the western plot (7 floors above the ground), two single buildings in the teaching building in the south area (2-3 floors above the ground) and two basements (partially with mezzanine), and rebuilding three single buildings; Newly build three single buildings and two basements (partially with mezzanine) of the auxiliary buildings in the north area (2 floors above the ground), the auxiliary buildings in the south area (2 floors above the ground) and the cloister in the south area (1 floor above the ground) of the eastern plot; implement outdoor general works such as sports venues, roads, pipelines and greening; The highest single building height of this project is 28 meters, and the largest single building area is 46457. 05 square meters. This project will be implemented in two phases from the west to the east (for the specific implementation contents of the first and second phases, please refer to Chapter VIII Technical Standards and Requirements). The construction scale of the project is as follows: The total construction area is 60371. 3 square meters, of which the above-ground construction area is 26516. 7 square meters (including the reconstruction area of 1224.7 square meters). The underground building area is 33854:.6 square meters (subject to the final opinion of the planning and capital department)
Total project investment: 5,253.82 million yuan
Construction and installation cost of this bid section: 743.99 million yuan
Maximum price: 72911: 0.02 million yuan
Construction period: 1643 calendar days
Bid winning information:
First place: Shanghai Construction Engineering Group Co., Ltd.
Bid offer (10,000 yuan): 72274. 5255
Second place: MCC20 Group Co., Ltd.
Bid offer (10,000 yuan): 7289 2.7545
Project Name: Chengdu Bailian Outlets Plaza Project Design-Construction General Contracting/Bid Section Bid Evaluation Result Announcement
Construction Location: Group 3, 6, 7 and 8 of Huilong Community, Bailianchi Street, Chenghua District, Huilong Community Collective, Group 2 of Yilitang Community.
Construction Scale: The land area of the project is 142.6119 mu (about 63 ㎡ in 95074). Bailian Outlets Shopping Plaza is planned to be built with a total construction area of about 134,900 square meters, including about 88,600 square meters of above-ground construction area and about 46,300 square meters of underground construction area. There are about 937 self-built parking spaces. The building has two floors above ground/three floors in some areas and one floor underground. The height of the building is not more than 24 meters. The structure is a reinforced concrete frame structure. After the completion of the project, 100% of the project will be self-sustaining, with the park commercial space as the carrier, the panda IP linkage as the highlight, the integration of local cultural experience as the feature, the effective superposition of multiple resources, the formation of differentiation and specialization, the exploration of Ole + products, and the positioning of the first panda theme scenic spot cultural tourism consumption project in China. Build Bailian Group's first 3.0 upgraded flagship Ole, which integrates shopping, catering, entertainment and tourism.
Planned construction period: 468 calendar days (including a design period of 60 calendar days).
Bidding scope: engineering design, engineering construction, procurement and installation of materials and equipment, completion acceptance, filing, handover, defect repair and warranty services within the defect liability period of the project, as well as management and control of quality, safety, progress, cost, contract and information of the project.
Specifically, it includes: 1) Scope of engineering design: the scope of this design is the temporary site of the project, including the preliminary (overall) design and construction drawing design of the designated contents, and at the same time, the statistics of various indicators and data required by Party A (or the client designated by Party A) and the construction coordination work in the construction stage shall be completed. The specific design contents are detailed in the attached General Contracting Service Assignment. Including professional landscape greening design, floodlighting, intelligent deepening design, green building consultation, civil air defense design, foundation pit enclosure design, BIM design, PC design, sign design, international or domestic green building certification services and other special deepening design contents. 2) Scope of project procurement: the scope of construction includes but is not limited to building materials and equipment, elevators, air conditioners and other facilities and equipment that are integral to the project. 3) Construction scope of the project: within the scope of the red line, including but not limited to earthwork, civil engineering, mechanical and electrical installation works (water supply and drainage, strong and weak electricity, heating and ventilation, elevators, fire protection, floodlighting, seismic support, etc.), decoration of public parts, landscape engineering, door and window curtain wall works, outdoor roads, rainwater and sewage, and other ancillary works. Site obstacle clearance, site leveling, temporary access roads, temporary facilities, measures necessary for the completion of the project and the preparation of as-built drawings, as well as other sporadic works required by the construction unit, warranty, defect repair and service during the defect liability period and warranty period of the project; It does not include water supply, power supply and distribution, gas, communication, etc. In supporting projects, as well as government monopoly projects and related materials and equipment. 4) Others: including the early stage (cooperate with the construction permit, quality inspection, security inspection and filing, and obtain the drawing review certificate), data filing (including paper and image data), project completion acceptance, special acceptance (including all special acceptance of environmental protection, fire protection, lightning protection, health, traffic police, civil air defense, greening, water, electricity, ventilation, postal and other functional departments), Project handover, settlement audit and submission for approval, urban construction filing of completion data, project filing, warranty service during the warranty period, and management and control of project quality, safety, progress, cost, contract, information, etc.
Contracting method: fixed total price package for design part and fixed total price package for construction part. The Contractor shall undertake all expenses related to the construction of the Project, including labor, materials, construction period, quality, materials, safe and civilized construction, etc.
Bid winning information:
First place: (leader) Shanghai Construction Engineering First Construction Group Co., Ltd.
(member) Chengdu Construction Engineering Seventh Construction Engineering Co., Ltd.
(member) East China Architectural Design and Research Institute Co., Ltd.
Bid quotation (yuan): 672534938.59
No.2: (Leader) China Construction Eighth Engineering Division Co., Ltd.
(Member) China Southwest Architectural Design & Research Institute Co., Ltd.
Bid Price (yuan): 668558400.000 HTML0 UNK2 7 Third place: (leader) Chengdu Construction No.5 Construction Engineering Co., Ltd. 0 HTML0 UNK2 8 (member) Sichuan Tiantuo Architectural Design Co., Ltd. 0 HTML0 UNK2 9 (member) Sichuan yuanjian Construction Co., Ltd. 0 HTML0 UNK3 0 Tender offer (RMB): 667120640.000 HTML0UN K31