According to a property rights trading platform, Donghu Cement Plant in Xinjiang Uygur Autonomous Region transferred a batch of machinery and equipment to be scrapped (No.3 kiln clinker production line) with a listing price of 2.1443 million yuan.
As of the base date of the valuation, there are 201 items of machinery and equipment to be scrapped in the production line transferred this time, mainly including raw coal bunker, pulverized coal bunker, reducer, fan, discharge valve of raw material homogenization silo, elevator, speed control scale, air cannon, air storage tank, chain conveyor, etc., which were put into use from 1993 to 2014. The machinery and equipment to be scrapped are generally maintained and managed, and are idle as of the base date of appraisal. The scope of this
demolition includes the foundation and underground foundation of machinery and equipment to be scrapped, production line equipment including zipper machine, vertical mill, coal mill, fan, motor, reducer, elevator, standby refractory in coal shed, cooling tower, preheater, humidifying tower, rotary kiln, grate cooler, burner, dust collector, medium conveying equipment, condenser, water pump, oil station, etc. Air compressor, reclaimer in the limestone homogenization silo (including power distribution and track), four-conjoined mixing bin, conveying system, all cables and pipelines within the scope of removal.