On December 29, the Department of Industry and Information Technology of Hainan Province issued an announcement on the capacity replacement scheme of the 5000t/d cement clinker project of Changjiang Huasheng Tianya Cement Co., Ltd.

The announcement shows that the production capacity of Changjiang Huasheng Tianya Cement Clinker Co., Ltd. with a daily output of 5000 tons of cement clinker is transferred to the company's 13000t/d (Phase IV) and 7000t/d (Phase III) cement clinker production line projects according to the ratio of 1:1. The cement clinker line
of Changjiang Huasheng Tianya Cement Clinker Co., Ltd. with a daily output of 5000 tons is planned to be dismantled and withdrawn in September 2026. The original design capacity of 13000t/d (Phase IV) cement clinker production line project

of Changjiang Huasheng Tianya Cement Co., Ltd. is 10000t/d, and the supplementary capacity is 3000t/d. The original design capacity of the 7000t/d (Phase III) cement clinker production line project

of Changjiang Huasheng Tianya Cement Co., Ltd. is 5000t/d, and the supplementary capacity is 2000t/d.

浙公网安备33010802003254号