Lowest 1.321 yuan/W! Announcement of Successful Candidates for Datang 100MW Photovoltaic EPC Project!

2025-12-29 09:27:24

Digital New Energy DataBM. Com was informed that on December 24, (Shaanxi Company) Datang Pingli County 100MW Photovoltaic Project EPC General Contracting Project successful candidates were announced.

Digital New Energy DataBM. Com was informed that on December 24, (Shaanxi Company) Datang Pingli County 100MW Photovoltaic Project EPC General Contracting Project successful candidates were announced.

The announcement shows that the consortium of China Railway First Survey and Design Institute Group Co., Ltd. and China Construction Eighth Bureau General Contracting Construction Co., Ltd. ranked first with a bid price of about 0.76 million yuan 13214. The details are as follows:

It is understood that the project is located in Pingli County, Ankang City, Shaanxi Province, with a construction scale of 100MW and a planned construction period of 365 days . The tenderer is Datang Fuping Thermal Power Co., Ltd.

The bidding scope covers the construction drawing design, as-built drawing preparation, equipment and material procurement (excluding the equipment supplied by Party A) of the booster station, photovoltaic field area and collector line (excluding the outgoing line) of the project. It is worth noting that the procurement of equipment and materials in this tender is partly provided by the tenderee.

Related Reading: Datang 150MW PV Project EPC Bidding!

All can be viewed after purchase
Correlation

Digital New Energy DataBM. Com was informed that on December 24, (Shaanxi Company) Datang Pingli County 100MW Photovoltaic Project EPC General Contracting Project successful candidates were announced.

2025-12-29 09:27:24

Wang Changlin introduced that at present, the problem of insufficient demand in China's economic development is more prominent, but there are also problems of insufficient supply. Supply has reached the stage from "yes or no" to "good or bad", and some of them have great demand, but the supply can not be met. In view of these problems, we must resolutely implement the spirit of the Central Economic Work Conference, expand domestic demand, optimize supply, promote the dynamic balance and virtuous circle of supply and demand at a higher level, and promote the formation of more economic development models led by domestic demand, driven by consumption and endogenous growth.