The Digital New Energy DataBM. Com was informed that on December 26, the successful candidate for the EPC project of the 400000 kilowatt photovoltaic project in Xinjiang was announced.
Among them, the First Engineering Co., Ltd. of China Railway Tenth Bureau Group and its consortium ranked the first candidate with a 99970 of 0.118 million yuan and a unit price of 2.499 yuan/W . The details are as follows:

It is understood that the project is located in Qapqal Xibe Autonomous County , Ili Kazakh Autonomous Prefecture, Xinjiang, and the tenderer is Qapqal Xibe County Rui Carbon New Energy Co., Ltd. The construction scope includes civil construction (including infrastructure), equipment installation and commissioning, and a 220kV booster station of the 400MW photovoltaic project .
It is noteworthy that on December 11, the tenderer of the project issued a change announcement to adjust the qualification requirements of the bidder, and the opening time of the project was from December 19, 2025 to December 19, 2025. It is postponed to 9:30 on December 26, 2025. The specific adjustments are as follows:

(Related Reading: Xinjiang 400MW PV Project EPC General Contracting Bidding Change! )
浙公网安备33010802003254号