Announcement of Capacity Replacement Plan for Clinker Production Line of Baimashan Cement Plant

2025-08-29 13:12:49

On August 29, Wuhu Municipal Bureau of Industry and Information Technology issued a public announcement on the capacity replacement scheme of cement clinker production line of Baimashan Cement Plant of Anhui Conch Cement Co., Ltd.

On August 29, Wuhu Municipal Bureau of Industry and Information Technology issued a public announcement on the capacity replacement scheme of cement clinker production line of Baimashan Cement Plant of Anhui Conch Cement Co., Ltd.

According to the requirements of the Measures for the Implementation of Capacity Replacement in the Cement and Glass Industry (2024 edition) and other documents, a 4000t/d cement clinker production line in Baimashan Cement Plant of Anhui Conch Cement Co., Ltd. has increased its capacity to 5250t/d by means of supplementary capacity. The replacement capacity is from Wuhu Huayang Cement Co., Ltd. and Wuhu Ruixin Cement Co., Ltd., and the replacement ratio is 2:1.

All can be viewed after purchase
Correlation

On August 29, Wuhu Municipal Bureau of Industry and Information Technology issued a public announcement on the capacity replacement scheme of cement clinker production line of Baimashan Cement Plant of Anhui Conch Cement Co., Ltd.

2025-08-29 13:12:49

This is a statistical introduction of cement and clinker storage capacity ratio. On September 11, the national clinker storage capacity ratio was 62.50%, and the national cement storage capacity ratio was 60.23%. The storage capacity ratio of the two types of products in each region showed different changes compared with the same period and the ring ratio. Among them, the change range was 35.00 percentage points higher than same period in the northeast region. Many types of data with small changes remained flat, with no increase or decrease.