MCC1 900 million, MCCCE 800 million, MCC5 700 million, MCC19 500 million

2025-12-17 17:23:51

A number of MCC enterprises have won major projects, totaling more than 2.9 billion yuan, demonstrating their strong strength and market competitiveness in the field of infrastructure.

Project Name: Jiangfeng Mingyue I Construction Project EPC (Second) Bid Section Successful Candidate Announcement

Construction Location: Northwest Corner

of the Intersection of Binjiang Avenue and Kegongyuan 2nd Road, Meishan City Construction Scale: The project is a commercial and residential community construction project. The total floor area is about 71395.65 ㎡ (contract) 107. The total construction area is about 206050. The project is divided into two phases of construction, of which the construction area of the first phase is about 105154.25 ㎡, and the construction area of the second phase is about 100895. The main construction contents include: new residential buildings, commercial buildings, underground parking spaces, property management rooms, old-age service facilities, municipal parks, etc.

Investment amount: The total investment of the project is about 140 million yuan, and the maximum bidding price for this bid section is 828493474.46 yuan (of which the maximum bidding price for construction is 814 016399. The maximum design bidding price is 14477075.

Bidding scope: (1) design: including the construction drawing design, follow-up design cooperation, participation in handover (completion) acceptance, data filing and handover within the scope of the project; (2) construction: all contents within the scope of the construction drawing design (including change and transformation) of the project.

Planned construction period: 1398 calendar days (including 30 calendar days for design and 1368 calendar days for construction). The specific commencement/start time shall be subject to the written notice of the Employer or the Supervisor.

Bid winning information:

First place: China Wuye Group Co., Ltd.

Quotation amount (yuan): 702771747.00

Second place: Zhonghuan Construction Engineering Group Co., Ltd.

Quotation amount (yuan): 70439977 9.00

Third place: Heze Urban Construction Engineering Development Group Co., Ltd.

Quotation amount (RMB): 702771745. Among them, the construction part accounts for 98.5%.

Construction site: west side

of Longwo Reservoir, Yanfeng Town, Meilan District, Haikou City, Hainan Province Bidding scope: The total investment of the project is 900 million yuan for the development and construction of the International Education City Business School Project. It mainly constructs teaching buildings, libraries, laboratories, ecological research institutes, sports centers, music centers, student apartments, faculty residential buildings, canteens and commercial supporting living communities.

Planned construction period: 1,095 calendar days; design period: within 90 calendar days from the date of signing the contract, the design unit shall submit the construction drawing design documents; construction period: within 1,005 calendar days.

Bid winning information:

First place: China First Metallurgical Group Co., Ltd.

Project name: Main contents of the second bid section

of the 2025 high-standard farmland construction project in Dunhua City, Jilin Province: field road, ditch protection, River revetment restoration and ancillary structures, etc.

Construction site: Guandi Town, Hongshi Township, Dunhua City Xianru Town

Bid Winning Information:

First Place: China Metallurgical Construction Engineering Group Co., Ltd.

Bid Price: 458500984.18 yuan

Second Place: Changchun Huayu Construction Engineering Co., Ltd

. Bid Price: 4515 88973:58 yuan

Third place: China Water Construction and Management International Engineering Co., Ltd.

Bid price: 454758809. The bid number is: E08-02-06, E08-02-03, E08-02-04, E08-02-05.

Construction Scale: For the public construction part of the University Town Relaxation Supporting Phase II Project, the total planned land area is about 66,300 square meters, and the total construction area is about 207,300 square meters. Among them, the above-ground building area is about 147,700 square meters, and the underground building area is about 5. It mainly constructs office, hotel, commercial, underground garage, civil air defense engineering and equipment room, and synchronously constructs public service supporting projects. The main contents and scale of the bidding for the general contracting of the

public construction are as follows:

The fifth bid section is the E08-02-06 plot, and the main construction contents and scale are as follows: the total floor area is about 19,600 square meters, and the total construction area is about 70,900 square meters, of which the above-ground construction area is about 50,600 square meters. The underground building area is about 2. It mainly includes hotels and commercial offices.

Bidding scope: The scope of this bidding is the general contracting for the construction of the public construction part of the University Town Relief Supporting Phase II Project. Including but not limited to soil protection, foundation and foundation, main structure, curtain wall engineering, building decoration (including fine decoration), building roof, building water supply and drainage and heating, building fire protection, building electricity, gas, photovoltaic, intelligent building, ventilation and air conditioning, building energy conservation, small municipal, elevator, floodlighting, high and low voltage power transformation and distribution engineering, civil air defense and ancillary facilities. All contents within the scope of drawings such as signs (including local nameplates), traffic safety works and supporting works shall meet the requirements of special acceptance specifications for green buildings and barrier-free facilities, excluding all heating pipe networks and equipment and facilities within one meter from the reserved points of landscape greening works and municipal heating to the heat exchange station in the plot. The specific contents shall be subject to the tender documents, drawings and bill of quantities. Division of

bid sections: The public construction part of the Project is divided into two bid sections:

Bid Section V: Plot No. E08-02-06 The estimated

contract price is about 7. The specific commencement time is subject to the commencement notice issued by the Supervisor.

Bid Winning Information:

No.1 in Bid Section

V: MCCCE Xiongan Construction Development Co., Ltd

. MCCCE Group Co., Ltd.

Bid Price (RMB 10,000): 38396. 6429370 HTML0 UNK4 0 Second place: China Construction Eighth Engineering Bureau Co., Ltd. 0 HTML 0 UNK4 1 China Construction Eighth Engineering Bureau Xiongan Development Co., Ltd. 0 HTML 0 UNK4 2 Bid price (RMB 10,000): 38374. 6187770 HTML 0 UNK4 3 Third place: China Railway Construction Engineering Group Co., Ltd. 0 HTML 0 UNK4 4 China Railway Construction Engineering Group Co., Ltd. Exhibition Co., Ltd. 0 HTML0 UNK4 5 Bid Price (RMB 10,000): 38405.528877

Project Name: Public Notice of

Winning the Bid for General Construction Contracting of Land Parcel No. XDG-2024-96 Construction Location: Land Parcel

at the Southwest Side of the Intersection of Qianou Road and Yucai Road, Huishan District, Wuxi City Construction Scale: The total construction area of this project is about 125324. The aboveground building area is about 90426.60 m2, and the underground building area is about 34898. The maximum single building area (including the basement): 34898.36 m2, the maximum number of floors of the building: 17, the maximum height: 52.5m, and the maximum span: 7.

All can be viewed after purchase
Correlation

A number of MCC enterprises have won major projects, totaling more than 2.9 billion yuan, demonstrating their strong strength and market competitiveness in the field of infrastructure.

2025-12-17 17:23:51