Notice on Capacity Replacement Plan for Two Cement Clinker Projects with a Daily Output of 5,750 Tons of Yingde Longshan Cement Co., Ltd.

2025-12-04 12:10:46

Guangdong Industry and Information Technology Office announced the capacity replacement plan of Yingde Longshan Cement Project, implemented the national cement industry capacity replacement policy, and accepted social supervision.

In accordance with the requirements of the Notice of the Ministry of Industry and Information Technology on the Issuance of the Implementation Measures for Capacity Replacement in the Cement and Glass Industry (2024 Edition) (the original No.206 of the Ministry of Industry and Information Technology), The Capacity Replacement Plan for Two Cement Clinker Projects with a Daily Output of 5750 Tons of Yingde Longshan Cement Co., Ltd. is hereby announced, and the public is welcome to supervise it.

Attachment: 1. Capacity Replacement Plan

for Two Cement Clinker Projects with a Daily Output of 5,750 Tons of Yingde Longshan Cement Co., Ltd. 2. Letter of Commitment

Department of

Industry and Information Technology of Guangdong Province December 3

, 2025
All can be viewed after purchase
Correlation

Guangdong Industry and Information Technology Office announced the capacity replacement plan of Yingde Longshan Cement Project, implemented the national cement industry capacity replacement policy, and accepted social supervision.

2025-12-04 12:10:46

5000t/d cement clinker production line of Liaoning Yinsheng Cement Group Co., Ltd. The design capacity of the original cement clinker production line is 4000t/d, the supplementary capacity is 1000t/d, the replacement capacity is 2000t/d, and the replacement ratio is 2:1. A 2000t/d cement clinker production line of Cement Branch of Guizhou Bohong Industrial Co., Ltd. is used to replace the production capacity of this project. The production line has been shut down and is planned to be dismantled and withdrawn before November 30, 2026.