Project Name: Yilan County Hemp Deep Processing Complex Project EPC Project General
Contracting Construction Location: Yilan County Economic Development Zone
, Harbin City Construction Scale: The total land area of the project is 1000000 square meters, and the floor area of the building base is 626840 square meters. The total construction area is 929800 square meters, and the planned green area of the project is 80000 square meters.
Bidding scope: preliminary survey, detailed survey, scheme design, preliminary design, construction drawing design and engineering construction in the implementation stage of the project, until the completion acceptance of the project, special acceptance according to the specifications and relevant government regulations, project completion acceptance filing, defect liability warranty, etc.
Planned construction period: the planned commencement date is December 15, 2025, and the planned completion date is December 15, 2028. Total construction period 1096 calendar days
Bid winning information:
First place: China Railway Construction Bridge Engineering Bureau Group No.4 Engineering Co., Ltd.
China Railway Fifth Survey and Design Institute Group Co., Ltd
. Bid quotation: 2,938,534,
Second place: Jiamusi Hongze Construction Engineering Co., Ltd.
Zhongshi Jianlian Engineering Design Co., Ltd
. Bid price: 2,936,415, 699.00 yuan
Third place: Henan Shuolu Construction Engineering Co., Ltd.
Meihua Architectural Design Co., Ltd.
Bid price: 2,941,856, 886.00 yuan
Project Name: Manganese Mining Project Design of Fuwan and Laopo-Mengmian Section of Zurong Manganese Mining Area, Debao County, Guangxi Construction general contracting (KWAD3G2025978)
Construction site: Debao County, Baise City, Guangxi Zhuang Autonomous Region
Construction scale: The mining license of this project was issued on December 1, 2023. The certificate No. C4500002011052110112080 is valid from December 1, 2023 to September 1, 2053. The mining area is covered by 36 turning point traps. Mining area 3. Fuwan mining area 22.
(1) Resource reserves: ① According to the "Furong Fuwan Mining Area in Debao County, Guangxi (Longtang Mine Section, Laopo Mine Section, Yitun Mine Section, According to the Review Opinion of Manganese Ore Detailed Survey Report (GCWS [2012] No.03), the resource reserves in the mining area are estimated to be (122b) + (333) 81.6033 million tons (manganese oxide ore + manganese carbonate ore). (122b) accounts for 29% of the total. ② According to the Mineral Resources and Reserves Assessment Opinion (Gui Chu Ping Zi [2021] No.20) issued by the Mineral Resources and Reserves Assessment Center of Guangxi Zhuang Autonomous Region on September 27, 2021, according to the Mineral Resources and Reserves Assessment Opinion (Gui Chu Ping Zi [2021] No.20), The raw ore reserve (proven + probable + inferred) of oxidized low-grade manganese ore in the mining area is 7.5125 million tons, and the reserve (proven + probable + inferred) of manganese carbonate low-grade manganese ore is 1264.
(2) Designed and utilized reserves of the mine: the mining method is open-pit/underground mining, and the main ore is manganese ore.
Project contract amount: 1. The design fee of this project is 82.43 million yuan; 2. The upper control price of open-pit mining is 35 yuan per ton, the upper control price of underground mining is 80 yuan per ton, and the total mining price is 7775.11 million yuan; 3. The final contract amount and the specific list unit price shall be subject to the Manganese Mining Contract for Fuwan and Laopo-Mengmian Sections of Zurong Manganese Mining Area in Debao County, Guangxi signed by both parties.
Bidding scope: This bidding is for the manganese mining outsourcing of Fuwan and Laopo-Mengmian sections of Zurong Manganese Mining Area in Debao County, Guangxi. Fuwan mining area covers an area of 22.132 square kilometers (subject to the mining license information), the mining depth: from 940 meters to -175 meters elevation, a total of 59 turning point delineated; Area of Laopo-Mengmian Mining Area 3.
The design contents include: temporary road design, water supply and sewage design, mineral processing plant design, material shed design, tailings pit design, mine mining design, mine restoration design and other supporting design work related to mining construction within the scope of construction.
The construction contents include: mine and industrial square construction, mining, mining area construction, mine construction and six systems construction. It includes stripping engineering, soil dumping engineering, shaft engineering, filling engineering and other supporting engineering, including temporary engineering, housing construction engineering, road engineering, pipe network engineering, slag retaining wall engineering, greening engineering, lighting engineering, intelligent engineering, power facilities engineering, industrial square, equipment procurement and installation, mine restoration and reclamation, etc. The Bidder shall be fully responsible for the safety, environmental protection, water and soil conservation, quality, cost, construction period, etc. of all works;
supporting and temporary facilities: including temporary construction roads, temporary power construction, temporary water pipeline construction, sewage pipeline construction, concentrator construction, material shed construction, tailings pit construction, ore outlet road construction, etc.
Bid winning information:
First place: China Railway Construction Southern Construction Investment Co., Ltd.
China Railway Construction Bridge Engineering Bureau Group Third Engineering Co., Ltd.
China Railway 21st Bureau Group Fourth Engineering Co., Ltd.
China Railway Fourth Survey and Design Institute Group Co., Ltd.
No.2: Zhongzhen Construction Co., Ltd.
Guangxi Traffic Design Group Co., Ltd.
No.3: China Construction Group (Guizhou) Co., Ltd
. China Railway Engineering Design Consulting Group Co., Ltd.
Name: Meijin Jining Sishui Zhegou Town 300MW/1200MWh Compressed Air Energy Storage Project EPC
Project Overview: Meijin Jining Sishui Zhegou Town Compressed Air Energy Storage Project is located in Zhegou Town, Sishui County, Jining City, Shandong Province. It adopts advanced compressed air energy storage technology with an installed capacity of 300 MW. The energy storage scale is 1200MWh, the project covers an area of about 120 mu (about 80 mu), the total investment is about 2 billion yuan, and the EPC project is under the responsibility of Shandong Meijin New Energy Development Co., Ltd.
Bid winning information:
First place: China Railway 21st Bureau Group Co., Ltd.
Design quotation: 37000000.00 RMB yuan
Construction and installation engineering quotation: 2064563370 RMB.00 yuan
Second place: China Railway 14 Bureau Group Co., Ltd.
Design Quotation: 40300000.00 yuan
Construction and Installation Engineering Quotation: 2066010011.The
third place: China Railway 20 Bureau Group Co., Ltd.
Design quotation: 36200000.00 yuan
Construction and installation project quotation: 2064976696. The implementation mainly includes forest land construction and transformation project, undergrowth cultivation of traditional Chinese medicine, forestry base supporting system project, Base irrigation facilities project and forest products processing base transformation project, etc., to comprehensively improve the quality of forest land.
Bidding scope: including the implementation and management of the whole life cycle of the project in the stages of engineering design, construction and installation, equipment and facilities procurement and installation, relevant acceptance, handover, filing, defect liability period, quality warranty, forest maintenance, etc., and be fully responsible for the quality, safety, construction period and cost of the project.
Bid winning information:
First place: China Railway 21st Bureau Group Co., Ltd.
Guosheng Design Co., Ltd.
Hubei Tongjinxin Engineering Co., Ltd.
Hubei Chunding Construction Engineering Co., Ltd.
Bid quotation (RMB) ): 486629933.00
Second place: China Railway 12th Bureau Group Co., Ltd.
Zhicheng Jianke Design Co., Ltd.
Bid price (RMB): 486724275 0.00
Third place: Hubei Changjiang Road & Bridge Co., Ltd. 0HT ML0 486858299 4 Zhongming Engineering Design Consulting Co., Ltd. 0 HTML0 UNK1 5 Bid Price (RMB): 486858299. According to the industrial model of "one base, three centers" of intelligent supply chain, the overall planning and investment renovation and decoration of the project will be carried out. After completion, Danone will have an annual cargo transfer capacity of 65 (1.3) million tons. The investment of the project is about 12. The largest single building area is about 19000 square meters. 0 HTML0 UNK1 6 Contracting method: The Contractor shall implement the general contracting of design and construction for this project in accordance with the bidding documents, contract documents, relevant data and instructions, etc. This project shall implement the quota design, and the preliminary design budget estimate of the construction project shall not exceed the total investment of the project. Construction contract, including but not limited to labor contract, material contract, equipment contract, construction period contract, quality contract, cost control contract, safety contract, civilized construction contract, acceptance of the project within the scope of contracting contract, handover contract, settlement contract, data arrangement contract, insurance contract that the contractor shall purchase, preparation of as-built drawings contract, and warranty contract. The quantities shall be settled according to the actual situation, and the contract price shall be priced and settled according to the bidding documents and the pricing method agreed in the contract. 0 HTML0 1158300000.00 7 Bid winning information: 0 HTML0 1158300000.00 8 Name of bid winner: The Fourth Engineering Co., Ltd. of China Railway 20th Bureau Group 0 HTML0 1158300000.00 9 China Railway Construction & Installation Engineering Design Institute Co., Ltd. 0 HTML0 UNK2 0 Bid winning amount: 1158300000.00 RMB 0 HTML0 UNK2 1 Project name: Weicheng District Lecheng Road, Caihong Road, Zhonghe Road, Fuyuan Street, Shuangyong Road Water Supply Pipe Network Supporting Project Candidate Announcement 0 HTML0 UNK2 2 Construction site: Weicheng District, Weifang City, Shandong Province. Involving the areas along Lecheng Road, Caihong Road, Zhonghe Road, Fuyuan Street and Shuangyong Road 0HTML0UNK2 3 Construction content: mainly including water supply pipe network laying, construction of pipeline ancillary facilities (such as valve wells, water meter wells, etc.), road surface breaking and restoration, pipe network connection and other water supply pipe network supporting projects, to improve the regional water supply infrastructure. Enhance water supply guarantee capacity 0 HTML0 UNK2 4 Bid winning information: 0 HTML0 UNK2 5 No.1: China Railway 18th Bureau Group Beijing Engineering Co., Ltd. 0 HTML0 UNK2 6 Bid price: 85139 of RMB 203353 0 HTML0 UNK2 7 No.2: Shenghong Construction Development Co., Ltd. 0 HTML0 UNK2 8 Bid price: 85217 898180 RMB 10,000 0 HTML 0 UNK2 9 No.3: Shandong Hongjinying Construction Group Co., Ltd. 0 HTML 0 85093 0 Bid price: UNK3. The bid winner is responsible for the design, equipment procurement, installation, commissioning, The working face coordination (excluding the development or lease coordination of the construction site) and all installation work are detailed in the bidding documents. 0 HTML 0 UNK3 1 Bid winning information: 0 HTML 0 UNK3 2 First place: Electrification Engineering Co., Ltd. of China Railway 12th Bureau Group 0 HTML 0 UNK3 3 Bid price: RMB 600,600,000 0 HTML 0 UNK3 4 Project name: Reconstruction and expansion project of Sanbao-Shuikou Highway Site Mountain Service Area (South Area) Project Construction 0 HTML 0U NK35 Construction site: Jiangmen City, Guangdong Province 0 HTML0 UNK3 6 Construction scale: Fokai Expressway is located in Foshan City and Jiangmen City, Guangdong Province, with a total length of 79. Zhishan Service Area (South Area) is a part of the reconstruction and expansion project of Sanbao-Shuikou Highway in Guangdong Province. The total length of Sanbao-Shuikou Highway Reconstruction and Expansion Project in Guangdong Province is 33. The service area (south area) covers an area of 62.5 mu (one side). The average traffic flow into the service area is estimated to be 12870/61287 (vehicles/day). The main technical and economic indicators are as follows: the total land area is 41697 ㎡, and the building area is 4500 ㎡. The area of roads, squares and parking lots is 30000 ㎡, the green area is 7197 ㎡, and the total building area is 8000 ㎡ (including 1710 ㎡ of dormitory building, 122 ㎡ of garage, 590 ㎡ of water and electricity room, and 31.5 ㎡ of garbage room. Transparent enclosure 813.0 HTML0 UNK3 7 Bid winning information: 0 HTML0 UNK3 8 First place: China Railway 11th Bureau Group Co., Ltd. 0 HTML0 UNK3 9 Total bid price (RMB): 1263256030 HTML0 UNK4 0 Second place: China Railway 12th Bureau Group Co., Ltd. 0 HTML0 UNK4 1 Total bid price (RMB) 1265547840 HTML0 UNK4 2 Third place: China Railway 18th Bureau Group Co., Ltd. 0 HTML0 UNK4 3 Total bid price (RMB): 1262342420 HTML0 UNK4 4 Project name: Subcontracting of Sumaoping Tunnel Works of the Second Contract Section of Huizhou Nim Ping Ring Island Expressway Project 0 HTML0 UNK4 5 Project overview: Located in Huidong County, Huizhou City, the project starts from Pingzheng Village, Jilong Town, Huidong County, Nim Ping Peninsula, Huizhou City, joins the planned Hehuishan Expressway and intersects with Shenhai Expressway (with Jilong Hub Interchange), passes through Huangbu Town, Pinghai Town and Xunliao Coastal Tourism Resort, and ends at Chisha Village, Xunliao Town, Huidong County, joining the Huizhou Bay Bridge.The project is an important part of the "Five Horizontal Lines" Shenzhen-Shantou Cooperation Zone to Yunfu Yunan in the Guangdong Provincial Expressway Network Planning (2020-2035).
Sumaoping Tunnel Project, chainage: K20 + 200 ~ K21 + 915, including Sumaoping Tunnel Project (length: 1.365 km, left line: LK20 + 526 ~ LK21 + 879, right line: K20 + 509 ~ K21 + 885; Including embedded parts of ventilation facilities), subgrade works (length of 0.348 km, left line LK20 + 200 ~ LK20 + 526, LK21 + 879 ~ LK21 + 909.8; Right line K20 + 200 ~ K20 + 509, K21 + 885 ~ K21 + 915. Excluding the main line pavement, bridge, traffic safety electromechanical engineering, greening engineering, cultivation soil stripping layer, cultivation soil temporary storage area protection and drainage, river flood control evaluation and remedial measures. The specific scope of the project shall be subject to the construction drawings issued by the purchaser, the bill of quantities, the items and details listed in the technical requirements and the relevant annexes.
Project location: Huizhou Nim Ping Island Ring Expressway Project-Subcontracting of Sumaoping Tunnel Project in the Second Contract Section; the project is located in Huidong County, Huizhou City.
Bid winning information:
Bid winner: The Fifth Engineering Co., Ltd.
of China Railway Shisiju Group Corporation Bid price (excluding value-added tax): RMB
118722891 Project name: Julong South Northeast Street, Overview of Survey, Design and Construction General Contracting
Project of Maoshan Dongbei Street Reconstruction Project: This project involves five roads, namely, Julong South Dongbei Street-Shiju Highway, Maoshan Dongbei Street, Maoshan Xinnan Street, Guotangmenkou South Street and Guoshi Road, with a length of about 9.