Minhe Qilianshan 2000t/d clinker production line to supplement 250t/d capacity

2025-11-26 13:24:17

The 2000t/d clinker production line of Minhe Qilianshan Cement Co., Ltd. is supplemented with 250t/d clinker production capacity, and the capacity index comes from the 500t/d capacity of the 1000t/d clinker production line of Qinghai Jiangheyuan Cement Co., Ltd., with the replacement ratio of 2:1.

On November 25, Huangyuan County of Qinghai Province issued the Announcement on the Capacity Replacement Scheme of Qinghai Jiangheyuan Cement Co., Ltd. The 2000t/d clinker production line

of Minhe Qilianshan Cement Co., Ltd. supplements 250t/d clinker production capacity. The capacity index is derived from the capacity of 500t/d in the 1000t/d clinker production line of Qinghai Jiangheyuan Cement Co., Ltd., and the replacement ratio is 2:1.

All can be viewed after purchase
Correlation

The 2000t/d clinker production line of Minhe Qilianshan Cement Co., Ltd. is supplemented with 250t/d clinker production capacity, and the capacity index comes from the 500t/d capacity of the 1000t/d clinker production line of Qinghai Jiangheyuan Cement Co., Ltd., with the replacement ratio of 2:1.

2025-11-26 13:24:17

A 4000t/d clinker cement production line supporting 6MW pure low-temperature waste heat power generation will be built, with an annual output of 1.2 million tons of clinker and 1.4 million tons of cement, including 350,000 tons of P.MH42.5 cement, 350,000 tons of P.LH42.5 cement and 700,000 tons of P.O42.5 cement.