A photovoltaic power generation project signed by Guoneng Zhejiang!

2025-11-25 17:59:02

On the afternoon of November 23, a fishing-photovoltaic complementary project was signed in Lindai Town, Pinghu City, Jiaxing, Zhejiang Province.

On the afternoon of November

23, a fishing-photovoltaic complementary project was signed in Lindai Town, Pinghu City, Jiaxing , Zhejiang Province.

It is understood that the project is cooperated by Lindai Town and Guoneng (Zhejiang) Energy Development Co., Ltd . At the signing ceremony, the representative of Guoneng (Zhejiang) Energy Development Co., Ltd. introduced the company and the project.

The project belongs to fishing-photovoltaic complementary photovoltaic project, that is, photovoltaic panel array is erected above the water surface of the fish pond, and aquaculture is carried out in the water area below the photovoltaic panel. A new power generation mode of " water power generation and underwater aquaculture " has been formed.

All can be viewed after purchase
Correlation

On the afternoon of November 23, a fishing-photovoltaic complementary project was signed in Lindai Town, Pinghu City, Jiaxing, Zhejiang Province.

2025-11-25 17:59:02

It is mentioned in the amendment list that the emission limits of particulate matter, sulfur dioxide and nitrogen oxides in "drying equipment with independent heat source" in "dryer, drying mill, coal mill and cooler" in the original emission standard are revised to 10 mg/m ³, 50 mg/m ³ and 80 mg/m ³ respectively, and the emission limit of ammonia is increased to 8 mg/m ³.