On August 1, the Natural Resources and Planning Bureau of Jiaxing City, Zhejiang Province, issued the post-approval announcement of the Civil Engineering Project (Change) of the Production Base of 4G W Solar Photovoltaic Tracking Bracket of Zhejiang Weiwang Photoelectric Equipment Co., Ltd. in Nanhu High-tech Zone.
The announcement shows that the change mainly includes the adjustment of the production workshop from 3 floors to 4 floors, the adjustment of the left podium of the R & D workshop from 2 floors to 3 floors, the adjustment of the supporting office building from 6 floors to 5 floors, and the adjustment of the entrance and exit.
It is reported that the total investment of the project is 400 million yuan , and the construction site is located in Nanhu High-tech Zone , Jiaxing City, Zhejiang Province, with an area of 28119 square meters. It is constructed by Zhejiang Weiwang Photoelectric Equipment Co., Ltd. and is expected to form an annual production capacity of 80000 sets of solar photovoltaic tracking brackets after putting into operation.