EPC Bidding for Datang 100MW Photovoltaic Project!

2025-11-21 09:09:29

On November 20, (Shaanxi Company) Datang Weibin 100M W Composite Photovoltaic Power Generation Project EPC General Contracting Tender Announcement was issued, and the owner of the project is Datang Baoji No.2 Power Generation Co., Ltd.

On November 20, (Shaanxi Company) Datang Weibin 100MW Composite Photovoltaic Power Generation Project EPC General Contracting Tender Announcement was issued. The owner of the project is Datang Baoji No.2 Power Generation Co., Ltd .

The announcement shows that the project is located in Gaojia Town, Weibin District, Baoji City, Shaanxi Province, with a construction scale of 100 MW , and the bidding scope includes the construction drawing design and completion drawing compilation of photovoltaic field, collector line and 110 kV booster station (excluding outgoing line). Procurement of equipment and materials (excluding equipment supplied by Party A), etc. In terms of

performance, This tender requires that the bidder must have two or more 50 MW (or MWp) and above (plain desert/mountain/water light (including sea) complementary/agricultural light (including forest light) complementary/distributed) photovoltaic power stations completed in the past five years. EPC general contracting performance. In terms of

time arrangement, the planned construction period of the project is 306 calendar days from March 1, 2026 to December 31 , 2026, subject to the time when the supervisor issues the commencement order (or the owner's notice). Consortium bidding is accepted

in this tender . In case of consortium bidding, a maximum of 2 units are allowed to jointly form. The

bidding documents shall be obtained from November 20, 2025 to 17:00 on December 4, 2025. The deadline for submission of

bidding documents is 09:00 on December 11, 2025 .

All can be viewed after purchase
Correlation

On November 20, (Shaanxi Company) Datang Weibin 100M W Composite Photovoltaic Power Generation Project EPC General Contracting Tender Announcement was issued, and the owner of the project is Datang Baoji No.2 Power Generation Co., Ltd.

2025-11-21 09:09:29

On November 21, the Office of Industry and Information Technology of Inner Mongolia issued the Announcement on the Replacement Scheme of Supplementary Production Capacity of 5000 Tons per Day Clinker Production Line of Ulanchabu Zhonglian Cement and the Transfer Scheme of 2500 Tons per Day Cement Clinker Production Capacity.