Bidding for Second-line SCR Ultra-low Emission Transformation Project of Heilongjiang Binzhou Cement Co., Ltd.

2025-11-20 11:26:59

On November 19, the tender announcement for the second-line SCR ultra-low emission renovation project of Heilongjiang Pennsylvania Cement Co., Ltd. was issued. The owner of the project is Heilongjiang Pennsylvania Cement Co., Ltd. and the tenderer is Northern Cement Co., Ltd.

On November 19, the tender announcement for the second-line SCR ultra-low emission renovation project of Heilongjiang Pennsylvania Cement Co., Ltd. was issued. The owner of the project is Heilongjiang Pennsylvania Cement Co., Ltd. and the tenderer is Northern Cement Co., Ltd.

The tender announcement shows that it is responsible for all engineering survey, design (equipment, air compressor room, power room and other buildings), complete supply of equipment, demolition of original equipment, installation and commissioning of equipment, commissioning, personnel training and technical services within the scope of general contracting of the project. The project mainly includes part of the process pipeline transformation and pipe network migration, inlet and outlet flues, reactor area system, ammonia circulation and transportation system and metering, injection system, rake and acoustic soot blower system, compressed air preparation system, ammonia and compressed air pipeline system, compressed air heat exchange (heating) system, Installation and commissioning of electrical and thermal control system (including SCR inlet and outlet flue gas analyzer, all control parameters and remote control access to the independent DCS system screen in the central control room), steel support, stair platform, external insulation, bridge and lighting, cable, monitoring, CEMS monitoring, denitration system. The Tenderer shall abide by the engineering settlement audit rules of the Tenderee, approve all construction contents, and the contract price shall be lump sum. The duration of the

project is 90 calendar days from the date of signing the contract. In addition to good reputation and relevant qualifications,

bidders are required to have no less than five similar projects completed in the past four years (from January 2021 to the present). The performance of similar projects refers to the high-temperature or medium-temperature SCR process route . Consortium bidding is not allowed

in this tender.

The bidding deadline and bid opening time are 13:30 on December 10, 2025.

All can be viewed after purchase
Correlation

On November 19, the tender announcement for the second-line SCR ultra-low emission renovation project of Heilongjiang Pennsylvania Cement Co., Ltd. was issued. The owner of the project is Heilongjiang Pennsylvania Cement Co., Ltd. and the tenderer is Northern Cement Co., Ltd.

2025-11-20 11:26:59

In order to thoroughly implement the spirit of the National Work Programme for the Construction of "Waste-free Cities" in the "14th Five-Year Plan" period and the newly issued Action Plan for the Comprehensive Treatment of Solid Waste, and to implement the general requirement of synergistic effect of pollution reduction and carbon reduction, Huzhou Municipal Bureau of Ecology and Environment adheres to the problem-oriented and systematic management, and takes the lead in the whole province and even in the whole country. Recently, the Guidelines for the Construction of Waste-free Cement Industry (hereinafter referred to as the Guidelines) were officially issued. This marks that Huzhou has taken a key step in promoting the green and low-carbon transformation of high energy-consuming industries and deepening the construction of "waste-free city", which will provide replicable solid waste standardized management and comprehensive treatment for the national cement industry.