On November 10, the Guizhou Provincial Department of Industry and Information Technology issued the Announcement on the Capacity Transfer Scheme of the New Dry Cement Production Line with a Daily Output of 3000 Tons of Clinker of Guizhou Gangan Cement Co., Ltd. The capacity index of the production line will be transferred to two 5000 t/d clinker production lines of Yingde Longshan Cement, with a replacement ratio of 2:1. After the
completion of capacity replenishment, the capacity of the two 5000 t/d clinker lines in Yingde Longshan was changed to 5750t/d.

浙公网安备33010802003254号