China Railway 14th Bureau, China Railway Construction Port and Navigation Bureau, China Railway 12th Bureau, China Railway 2nd Bureau, China Railway 4th Bureau, China Railway 11th Bureau, China Railwa

2025-11-10 13:56:08

Construction scale: 710 Wp monocrystalline PV module 53239 blocks will be installed in this project, with a total PV module capacity of 37.7997 MWp. Configure 320 sets of 500kW/1000kwh energy storage: construct 120 charging guns of 600 kW, 2600 charging guns of 120 kw, 1200 charging guns of 80 kw and 820 charging guns of 7 kw; support the transformation of 9480 parking spaces and a set of charging management system.

Project Name: General Contracting

of Guangdong Photovoltaic Storage and Charging Project Construction Location: Guangdong Province

Construction Scale: 710 Wp monocrystalline photovoltaic module 53239 blocks are installed in total in this project. The total capacity of PV modules is 37. Equipped with 320 sets of 500kW/1000kwh energy storage: 120 600kW charging guns, 2600 120kw charging guns, 1200 80kw charging guns, 820 7kw charging guns: 9480 parking spaces and a set of charging management system.

Bid winning information:

Bid winner: Tunnel Engineering

Co., Ltd. of China Railway Shisiju Group Co., Ltd. Bid winning price: 97183.

The total planned investment for the first phase of the project is estimated to be 1,025 million yuan.

The construction includes 500 super charging stations and related supporting construction.

Duration (days): 730

Bid winning information:

First place: CRCC Harbour & Channel Engineering Bureau Group Co., Ltd.

Bid price (RMB): 1020000000

Second place: Hebei Construction Engineering Group Co.,

Ltd. Bid price (RMB): 10 24755560

No.3: The Fifth Engineering Co., Ltd.

of China Railway 22 Bureau Group Bidding Price (RMB): 1022008755

Project Name: 220 MW Distributed Photovoltaic EPC Project in Northern Tianjin and Northern Hebei 0 HTML 0 UNK1 7 project location: Tianjin 0 HTML 0 UNK1 8 the 220 MW distributed photovoltaic EPC project in northern Tianjin and northern Hebei has been approved by the project approval/approval and filing authority, the source of project funds is other funds, and the tenderer is Tianjin Zhongyi New Energy Co., Ltd. This project has met the bidding conditions, and the current bidding method is public bidding. 0 HTML0 UNK1 9 Construction Scale: 220 MW Distributed Photovoltaic EPC Project in Northern Tianjin and Northern Hebei, etc. The total installed capacity of this project is tentatively set at 220 MW. The bid winner is responsible for completing the design, equipment procurement, installation, commissioning, working face coordination (excluding the development or lease coordination of the construction site) and all installation work of the project. For details, please refer to all contents in the bidding documents 0 HTML 0 UNK2 0 Bid winning information: 0 HTML 0 UNK2 1 No.1: Electrification Engineering Co., Ltd. of China Railway 12th Bureau Group 0 HTML 0 UNK2 2 Bid price: 622.6 million yuan 0 HTML 0 UNK2 3 Project name: Tongjin Road 1, 2 # Block Residential, Commercial, Office, Cultural Activity Center and Supporting Facilities Project Design-Construction General Contracting Successful Candidate Announcement 0 HTML 0 UNK2 4 Project Location: Sichuan Province Chengdu 0 HTML0 UNK2 5 Bidding Conditions: The design-construction general contracting of the residential, commercial, office, cultural activity center and supporting facilities project on Plots 1 and 2 , Tongjin Road has been approved by the project approval/verification/filing authority, and the source of project funds is self-raised funds 61794. The project has met the bidding conditions, and the current bidding method is open bidding. 0 HTML0 61684 6 Bid winning information: 0 HTML0 UNK2 7 First place: China Railway Erju Group Construction Co., Ltd. 0 HTML0 UNK2 8 Bid price: 61458 RMB 5,572,540 0 HTML0 UNK2 9 Second place: China Construction Fifth Engineering Bureau Third Construction Co., Ltd. 0 HTML0 UNK3 0 Bid report: UNK2 789444 RMB ten thousand 0 HTML0 UNK3 1 No.3: Zhongshang Jiantou Construction Co., Ltd. 0 HTML0 UNK3 2 Bid price: 61534 RMB 8239.17 0 HTML0 UNK3 3 Project name: Shandong Energy Development Co., Ltd. of State Power Investment Group Bidding for the 47th batch in 2025 SPIC Wind and Solar Energy Storage and Transportation Integrated Base W5 Land Parcel Project (Phase II) 0 HTML0 UNK3 4 Project Location: Caiyangzi Saltworks, Shouguang, Shandong Construction Scale: The photovoltaic power generation capacity of Phase II of the Project is 239.41905 MWp photovoltaic (fixed 45.9186 MWp, Flexible support 193. Start time of work: within one month after the contract is signed, tentatively in September 2025, subject to the time of formal notification by the Employer. Date of Completion: March 31, 2026 10002DNYZC-2025-08-01-220-020HTML0 UNK3 5 Bid Section 2: Wind Farm Project EPC EPC Project (Bid Section) of Plot W5 Project (Phase II) of State Power Investment Corporation Lubei Saline-alkali Tidal Flat Wind and Solar Energy Storage and Transmission Integration Base 2: Wind farm project) (newly-built 87.5MW wind farm) from commencement preparation to completion acceptance, including all design (including overall responsibility for the preliminary design of all bid sections of the project), procurement (except for equipment supplied by Party A), formalities, construction, testing, commissioning, trial operation, training, handover and production, performance and quality assurance, Services and other contents within the project quality warranty period 0 HTML0 UNK3 6 Bid winning information: 0HTML0 UNK3 71 Bid section 0 HTML0 UNK3 8 First place: China Railway 21st Bureau Group Operation Management Co., Ltd. 0 HTML0 UNK3 9 China Railway 14th Bureau Group Electrification Engineering Co., Ltd. 0 HTML0 UNK4 0 China National Nuclear Power Planning, Design and Research Institute Co., Ltd. (Consortium) 0 HTML0 UNK4 1 Bid price: 43495: RMB 15.28 million 0 HT ML0 UNK4 2 Second place: Power China Nuclear Power Engineering Co., Ltd. 0 HTML0 UNK4 3 Bid price: 44311: RMB 2.806 million 0 HTML0 UNK4 42 Bid Section 0 HTML0 UNK4 5 First place: Power China Nuclear Power Engineering Co., Ltd. 0 HTML0 UNK4 6 Bid price: 30010 RMB 0.43 million 0 HTML0 UNK4 7 Second place: Power China Shandong Electric Power Construction Co., Ltd. 0 HTML0 UNK4 8 Power China East China Engineering Corporation (Consortium ) 0 HTML0 UNK4 9 Bid Price: 27999 RMB 0.99 million 0 HTML0 UNK5 03 Bid Section: 0 HTML0 UNK5 1 No.1: Zhongda'an Co., Ltd. 0 HTML0 UNK5 2 Bid Price: 190.To the proposed photovoltaic power station in Shayingweili, Guanling County, Guanling County Gangwujianzhuang Photovoltaic Power Station Jointly Constructs a 220KV Gathering Station; The proposed land area is about 3000 mu (the final land area is subject to the actual land area), and the land utilization rate should be improved according to local conditions. In principle, the lowest end of the bracket should not be less than 1. The installed capacity of photovoltaic power generation is 100m W (AC side) and the collector line, and the installed capacity of DC side is 130.240 MWp. It is planned to connect to 220kV Bogong Town Booster Station through 4-circuit 35KV collector line (this project does not involve the construction of booster station and outgoing line). No new energy storage power station will be built in this station. Energy storage is temporarily considered as purchasing energy storage value-added services; 0 HTML0 UNK5 3 Total Project Investment (RMB): 400000000.00, Estimated contract price of this bid section (RMB): 335000000.000 HTML0 UNK5 4 Bid winning information: 0HTML0 UNK5 5 First place: China Railway 15th Bureau Group Shanghai New Energy Development Co., Ltd. 0HTML0 UNK5 6 Henan Qiyuan Electric Power Survey and Design Co., Ltd. 0HTML0 UNK5 7 Total bid price (RMB 10,000): 32830.Second place in the 000000

: Guizhou Provincial Water Resources and Hydropower Investigation and Design Institute Co., Ltd.

Sinohydro Bureau 8 Co., Ltd.

Total bid price (RMB 10,000): 33458. Third place in the 490000

: CCCC Urban Energy Research Institute Total bid price of CFHEC Southwest Engineering Co.,

Ltd.

of China Communications First Harbor Engineering Co., Ltd. (CNY 10,000): 33494. Renovate the existing 300 mu traditional plastic greenhouses, transform 307 mu plastic greenhouses into modern greenhouses, build 400 mu modern greenhouses, and improve the supporting infrastructure. At the same time, the project of soil improvement and fertilization was carried out in 1007 mu planting area. Relying on the characteristic grape industry in Liangli Town, the existing resources will be integrated and revitalized, and the current entrance building of 600 square meters will be upgraded and modified to the Putian School as a practical research classroom in the vineyard. The total investment of the

project is estimated to be about 12191.

Information on winning the bid:

First place: China Railway 11th Bureau Group Co., Ltd.

Member of the consortium: China Railway 11th Bureau Group Xi'an Construction Co., Ltd

. Member of the consortium: Anhui Huacheng Construction Bid Price of Construction Engineering Co., Ltd.

(RMB): 120596043.83

No.2: China Railway First Engineering Group Co., Ltd.

Bid Price (RMB): 120693574. 98

No.3: Huaibei Mining (Group) Engineering Construction Tender offer for the establishment of a limited liability company

(RMB): 120242496.01

Project name: Construction of Water Supply and Drainage Relocation Works for the Reconstruction and Expansion Project of Huocun-Longshan Section of Shenyang-Haikou National Expressway Successful candidate

Project overview: Huocun-Longshan Section of Shenyang-Haikou National Expressway Longshan Section (i.e. Guangzhou North Second Ring Expressway) Reconstruction and Expansion Project (hereinafter referred to as the "Project") is located in the north of the central urban area of Guangzhou, passing through Baiyun District and Huangpu District. The route of the Project generally runs from east to west, starting from Huocun Interchange, which intersects with Guangzhou-Shenzhen Expressway, and connecting with Guangzhou East Second Ring Expressway to the northwest through Luogang, Changping and Badou. It passes through Shihu, Beicun, Banghu and Shuili Interchange, ends at Longshan Interchange, which intersects with Guangqing Expressway, and connects with Guangzhou West Second Ring Expressway, with a total length of about 38.3 km. 76 bridges with a total length of 18029. 2m, including 4 extra-large bridges with a total length of 7779.4m, 21 large bridges with a total length of 8674.6m, and 1575 medium and small bridges.

Planned construction period: The construction period is tentatively scheduled to be 24 months, and the specific commencement date is subject to the commencement order issued by the Supervisor. As-built drawings shall be submitted within 30 days after the completion of the project: the defect liability period is 24 months.

Note: Party A has the right to adjust the above construction period according to the actual situation, and the cost of the increase or decrease of the construction period caused by Party A's requirements remains unchanged.

Bidding scope: according to the construction needs of the water supply and drainage relocation project of the whole line of the water supply and drainage relocation project of the reconstruction and expansion project of the Huocun-Longshan section of the Shenyang-Haikou National Expressway, the water supply and drainage pipeline relocation project affected by the highway construction and operation requirements within the construction scope shall be relocated. Including: project construction application (including planning construction application, construction construction application, fire control construction application, etc.), temporary land use outside the red line, land acquisition and demolition and young crop compensation, temporary construction works and laying construction measures, structure demolition and compensation, tree felling and relocation related construction procedures, environmental protection and water conservation, equipment and material procurement management, construction and installation construction [including four links (water, electricity, communication, etc.) Relevant contents and services in various stages such as road, leveling, commissioning, demolition works, electronic handover, cooperation in acceptance, completion and commissioning, handover, etc.

Bid winning information:

First place: China Railway 11th Bureau Group Co., Ltd.

Bid price (RMB 10,000): 17008. 5009

Second place: CCCC Road & Bridge Construction Co., Ltd.

Bid price (RMB 10,000): 171 56.9445

Third Place: Guangzhou No.3 Municipal Engineering Co., Ltd.

Bid Price (RMB 10,000): 17051.0088

Project Name: Civil Works of Infrastructure Renewal and Reconstruction (High-speed Railway Station, Road Network and Road) of Industrial Park in South Taihu New Area of Yangtze River Delta Integration Public

bidding scale: The Yangtze River Delta Integration South Taihu New Area Industrial Park Infrastructure Renewal and Reconstruction (high-speed rail Station Road Network) Project is in an east-west direction as a whole. The main line viaduct starts from Sujiazhuang Interchange and connects with the Second Ring North Road Expressway. The starting pile number is K0 + 000. The line crosses Tianheng Road in the west. After the interchange of Tianheng Road, it will continue to cross Mengxi Road and Changhushen Channel (planned Grade II Channel) westward, set up the interchange of Sanhuan West Road and Hangzhou-Nanjing Expressway, and then continue to cross Yangjiazhuang Road, Yanshan Road, Zhihe Road, and set up the interchange of Zhanqian Road. The route continues to cross the railway line westward (starting and ending pile number K4 + 822-K5 + 561) and then intersects with Miaofeng Highway and reserves the entrance and exit of Miaofeng Interchange, then the elevated landing to the end of the project, the end pile number K6 + 400, the total length of the route is about 6. The starting point of the ground road is located at the intersection of Hangchangqiao North Road Auxiliary Road and Second Ring West Road Auxiliary Road. The starting point pile number is FK0 + 000, corresponding to the main line pile number K0 + 000, the lower space of the main line viaduct is used for layout, it is separated from the main line after Mengxi Road, passes through the current Chuangye Bridge along the current Chuangye Avenue, merges with the main line after Dongbang Road, the route continues westward to Zhihe Road, the current Chuangye Avenue is used along the north side of the main line, and the route ends at the south side of Yaojiabu Village. The terminal is connected with the current Chuangye Avenue, and the terminal stake number is FK6 + 396. The total length of the ground road is about 6. The main line viaduct is provided with 6 bridges of 5586.76m, including 1 extra-large bridge of 2065m and 1 large bridge of 3521. The ground road is provided with 2 bridges of 653m, 1 large bridge of 633m (for use), and 1 medium and small bridge of 20m; There are 4 interchanges along the whole line. In addition, access conditions for Miaofeng interchange and 11 grade crossings are reserved. In addition, there are 880 parking spaces, 500 charging piles, 6 billboards and 1 LED billboard. The total investment of this

project is 2.79416 billion yuan (including 384.47 million yuan for the railway section). The construction and installation cost is 2.16756 billion yuan (including the railway section). 2

. Bidding scope:

TJ02 bid section: the starting and ending chainage of the main line viaduct of this project is K2 + 536 (the left chainage is K2 + 511)-K4 + 822 (excluding the main bridge and north approach bridge of the D ramp of the interchange of the Third Ring West Road (the starting and ending chainage is DK 0 + 000-DK0 + 412.14), G ramp tied-arch main bridge and north approach bridge (starting and ending chainage GK0 + 543.317-GK0 + 848.82) and widening bridge (starting and ending chainage CRK2 + 327.6-CRK2 + 603.3)), K5 + 561-K6 + 400 and the starting and ending chainage of the ground road FK2 + 671-FK6 + 396.

Bid winning information:

the first place in the TJ02 bid section

: the Third Engineering Co., Ltd.

of China Railway 16th Bureau Group China Gezhouba Group Bid price of Road and Bridge Engineering Co., Ltd.

(RMB): 722,928,535.00

Second place: Huzhou Traffic Engineering Construction Group Co., Ltd.

Bid price (RMB): 722,761 726.00

Third place: CCCC Second Harbor Engineering Co., Ltd.

Bid price (RMB): 728,967, 809.00

Project Name: Luhe County Indemnificatory Housing Construction Project General Contracting (Construction Drawing Design and Construction) Announcement of

Successful Candidates Project Implementation (Delivery) Location: North Side of Chaoyang Road, Luhe County, Shanwei City (East Section of Chaoyang Road Extension)

Bidding Scope: This Bidding The scope is the general contracting of construction drawing design and construction of this project. The main construction contents and scales are as follows: 1. 19 new affordable housing units will be built, with a total construction area of 228829. 14 square meters, of which the capacity construction area is 192322.77 square meters. After completion, 2572 affordable housing units will be provided, and parking spaces, charging piles and other supporting facilities will be improved; 2. Renovation of 4 dormitories of standardized factory buildings in high-tech zones, with a building area of 28390.

Bidding content: complete the construction drawing design of the project, the general contracting management and comprehensive coordination of the whole process of the construction stage, the acceptance and handover of the construction to the completion of the project, and the general contracting of the whole process of the warranty service within the quality warranty period, handle the construction application and approval on behalf of the tenderee, and cooperate with the tenderee to handle the project settlement and financial audit of the relevant departments. Cooperate with the audit and audit investigation of the tenderee, including but not limited to the following items: 1. Design: (1) carry out construction drawing design, construction and acceptance process coordination, scheme optimization and design change (including estimation) in the construction process according to the bidding scope and quota; design service and coordination work in the whole process; Cooperate with the review of construction drawings, and assist the tenderee in handling the planning and construction application, construction application of various disciplines and preliminary design review, handling the construction project planning permit and other approval and application work, cooperation in the construction and acceptance process, review and seal of as-built drawings. (2) Requirements for design result documents: according to the contract requirements. 2. Construction part (including but not limited to): (1) Construction content (including but not limited to): complete all the construction contents of the project (subject to the scope agreed in the bidding documents and the contract, and the construction drawings approved and confirmed by the owner), prepare the as-built drawings, cooperate with the relevant departments in the pre-settlement (final) audit, project warranty and other work. Organize the acceptance and filing of the project and the collection, sorting and filing of engineering data, be responsible for handling various procedures required for the commencement and acceptance of the project and bear the cost of the construction party for handling the above procedures, carry out the construction management of the whole process of the project implementation stage, and do a good job in the overall coordination of project design and construction and other coordination and management work involved in the project. (2) Contracting mode: contracting construction, Contract for labor, materials, quality, safe production, civilized construction, construction period, acceptance of works within the scope of contracting, water supply, power supply, handover, settlement, management within the scope of construction and overall organization of the site, professional coordination and cooperation, insurance to be purchased by the contractor, preparation of as-built drawings (to meet the requirements of special acceptance such as planning), etc. Note: The whole process of quota design and quota construction is implemented for the Project. The Employer has the right to make appropriate adjustments to the Contractor's contracting scope and contracted quantities within the quota according to the actual situation of the Project, and the Contractor must obey unconditionally. The Employer shall not compensate the Contractor for any expenses incurred by reducing the scope of implementation and the content of implementation. The Contractor shall not change the scope and content of the project without the written consent of the Employer.

Construction period (delivery date): the design construction period is 60 calendar days, and the specific commencement date shall be subject to the written notice of the Tenderee;

the construction period is 1095 calendar days, and the specific commencement date shall be subject to the date of the mobilization notice issued by the Tenderee.

Maximum bidding price limit: the 75644 is RMB 7,200 yuan, of which

the maximum bidding price limit for construction drawing design fee is RMB 3,817,200 yuan. The maximum bidding price of

construction and installation cost is 75263.

Bid winning information:

Bid winning candidate: Guangdong Xinnanyue Construction Co., Ltd.

China Railway Tenth Bureau Group Co., Ltd.

Guangdong Urban and Rural Planning and Design Institute Science and Technology Group Co., Ltd.

China Railway General Contracting (Shanwei) Tender offer of Engineering Co., Ltd.

: 755148801. The total length of the road is 2032.78 meters, and the length of the route is 1980. Road grade: urban trunk road; pavement structure: cement concrete pavement; design speed: 50 km/H; design standard axle load: BZZ-100; number of motor vehicle lanes: two-way six lanes; Design life of road traffic volume reaching saturation state: 20 years; design reference period of concrete pavement: 30 years; road cross section form: two roads; Road cross section layout: 4.5m (sidewalk) + 3.0m (non-motorized vehicle lane) + 10.5 (motorized vehicle lane) + 4.0 (median) + 10.5 (motorized vehicle lane) + 3m (non-motorized vehicle lane) + 4. Road works, water supply and drainage works, lighting works, power and telecommunication trench works, traffic works, Greening project (including planning green belt outside the red line of the road), etc. See all contents included in the reviewed construction drawings and bill of quantities for details.

Bid winning information:

First place: China Railway 20th Bureau Group Co., Ltd.

Total bid price (RMB): 104353923.46

Second place: Guangdong Foundation Engineering Group Co., Ltd

. Total bid price (RMB): 104564310.37

No.3: Zhengzhou Yijian Group Co., Ltd.

Total bid price (RMB): 104511878. 51

Project name: Guangdong Province Intelligent Manufacturing Demonstration Base (Banfu Intelligent Decoration Park) Innovation and Entrepreneurship Carrier Construction Project 0 HTML0 58212 0 Construction Scale: The innovation and entrepreneurship carrier construction project of Guangdong Province Intelligent Manufacturing Demonstration Base (Banfu Intelligent Decoration Park) covers an area of 14414. 99 square meters, located in the east of Haitai Road, Lixi Village, mainly including the construction of three high-standard factories, one dormitory, UAV flight test operation square, etc., with a construction area of about UNK2. 76 square meters. The underground garage covers an area of 7,250.07 square meters (including civil air defense garage). The project gathers high-tech intelligent equipment manufacturing, and plans to build UAV popular science education, research and development center, flight test, training base, etc. 0 HTML0 UNK2 1 The total investment of the project is a 26981 of 0.11 million yuan. The tender amount is 172,080. 217.0 HTML0 UNK2 2 Bid winning information: 0 HTML0 UNK2 3 First place: China Railway 19th Bureau Group Co., Ltd. 0 HTML0 UNK2 4 Bid price (RMB): 158295686.120 HTML0 UNK2 5 Second place: China Railway 15th Bureau Group Co., Ltd. 0 HTML0 UNK2 6 Bid price (RMB ): 159088116.680 HTML0 151432199 7 No.3: China Railway Construction Engineering Group Co., Ltd. 0 HTML0 UNK2 8 Bid Price (RMB): UNK2.000 HTML0 UNK2 9 Project Name: G344 Reconstruction Project from Qizhuang to Ruluo in Ruzhou (Phase I, Project 0 HTML0 UNK3 0 Project overview: G344 Ruzhoujingqizhuang to Ruluojie Reconstruction Project starts at the intersection of G344 and G207 and ends at the west of Dongchefang Village (at the junction of Ruzhou and Ruyang), with a total length of 23. The first phase of the project is 13.6 km from the starting point of the project to S237, with a total investment of about 8. Up to now, 95% of the bridge and culvert works have been completed, and 13.6 km of half-range water stabilization construction has been completed. 1. Half asphalt lower layer paving 1 3. Half asphalt upper layer 1. 0 HTML0 UNK3 1 Construction unit: Ruzhou Highway Administration Bureau 0 HTML0 UNK3 2 Construction site: Ruzhou City, Pingdingshan City, Henan Province 0 HTML0 UNK3 3 Bid winning information: 0 HTML0 UNK3 4 First place: China Railway First Group Co., Ltd. 0 HTML0UN K35 Bid Price: 133448065.00 yuan 0 HTML 0 UNK3 6 Second Place: CCCC Tunnel Engineering Co., Ltd. 0 HTML 0 UNK3 7 Bid Price: 133478633 45 yuan 0 HTML 0 UNK3 8 Third Place: China Railway 15th Bureau Group Co., Ltd. 0 HTML 0 UNK3 9 Bid Price: 13 3491998.0 HTML0 UNK4 0 Construction Scale: The main construction content of the project includes the renovation and drainage pipe network construction of the North Ring Road, Gongnong Road and the surrounding waterlogging-prone areas. The specific construction scale is as follows: a new rainwater pipe network and a sewage diversion well will be built for 9 roads in the urban area of Dunhua City. The total length of the new rainwater pipe network is 12379m, the diameter of the rainwater pipe is d300mm-d1800 mm, and the pipe material is reinforced concrete pipe; the 68711 of the pipe trench recovery is m ².Maximum

bidding price: 108036100 RMB

Information on winning the bid:

First place: China Railway First Engineering Group Co., Ltd.

China Railway 18th Engineering Group Co., Ltd.

Second place: Jilin Mancang Construction Engineering Co., Ltd. 0 HTML0 UNK5 Liaoning Municipal Engineering Design and Research Institute Co., Ltd. 0 HTML0UNK6 Third place: Shandong Honghua Construction and Installation Engineering Co., Ltd. 0 HTML0UNK7 Jinghe Design Group Co., Ltd. 0 HTML0UNK8 Project name: Construction of Road Upgrading and Reconstruction Project from County Town to Yigaierqi Town of X509 Line in Shache County 0 HTML0UNK 9 Project scope: Reconstruction of 17.95 kilometers of road and supporting ancillary facilities (Arelle Township to Yigaierqi Town Section 17.0 HTML0 89314738.81 0 Bid winning information: 0 HTML0 89314738.81 1 First place: China Railway Siju Group Co., Ltd. 0 HTML0 89314738.81 2 Bid price: 89314738.81 RMB 0 HTML0 89394536.97 3 Second place: China Railway 16th Bureau Group Co., Ltd. 0 HTML0 89394536.97 4 Bid price: 89394536.97 RMB 0 HTML0 89394536.97 5 Third place: CCCC First Highway Engineering Co., Ltd. 0 HTML0 89532833.0 6 Tender offer: 89532833.0 HTML0 89532833.0 7 Project investment estimation: RMB 241.89 million 0 HTML0 89532833.0 8 Bidding scope: review of construction drawing design (including construction drawing budget) documents (including survey documents and detailed design documents) of all works of the main line of the project and the works implemented simultaneously with the main line. Hereinafter referred to as construction drawings), including review of construction drawing design principles, construction drawings (including mandatory review of construction drawings required by local competent construction authorities, special review of construction drawings such as fire protection and civil air defense), construction drawing budget, review of detailed survey outline, technical requirements and detailed survey report, review of changed design construction drawings and related documents, and other coordination work during the period of project completion acceptance.

All can be viewed after purchase
Correlation

Construction scale: 710 Wp monocrystalline PV module 53239 blocks will be installed in this project, with a total PV module capacity of 37.7997 MWp. Configure 320 sets of 500kW/1000kwh energy storage: construct 120 charging guns of 600 kW, 2600 charging guns of 120 kw, 1200 charging guns of 80 kw and 820 charging guns of 7 kw; support the transformation of 9480 parking spaces and a set of charging management system.

2025-11-10 13:56:08

Recently, the Bureau of Industry and Information Technology of Xuchang City, Henan Province issued the "Henan Hubo Lingwei Cement Group Co., Ltd. 4500 tons per day clinker new dry process cement production line (Phase II) project supplementary capacity replacement plan, Henan Hubo Lingwei Cement Group Co., Ltd. 4500 tons per day new dry process cement clinker production line (Phase I) capacity replacement plan announcement".