The Digital New Energy DataBM. Com was informed that on November 7, Datang Jinneng Qiziwan 200 MW Photovoltaic Power Generation Project EPC General Contracting " According to the announcement, Located in Qiziwan General Contracting Project Department, Muguan Island, Qingdao District, Qingdao City, Shandong Province, the project intends to purchase monocrystalline N-type TOPCon double-sided double-glass photovoltaic modules with peak power of 715 Wp .
project as a whole is expected to be 0H on December 30, 2025 UNK1 3 of TML0 is connected to the grid at full capacity. 0 HTML0 UNK1 4 In terms of performance, this tender requires bidders to have 0 HTML0 UNK1 5 0 HTML0 UNK1 6 in the past five years (from January 1, 2020 to January 1, 2025, subject to the time of signing the contract). 0 HTML0 UNK1 7700Wp and above TOPCON component 0 HTML0 UNK1 8, cumulative contract performance 0 HTML0 UNK1 9 at least 50 MW0 HTML0 UNK2 0. 0 HTML0 UNK2 1 This lot 0 HTML0 UNK2 2 does not accept 0 HTML0 UNK2 3 agent quotation. 0 HTML0 UNK2 4 The time for the purchaser to sell the procurement documents is 0 HTML0 UNK2 5 November 7, 2025 to November 13, 2025 0 HTML0 UNK2 6. 0 HTML0 UNK2 7 The deadline for the first submission of response documents/the first opening time of response documents is 0 HTML0 UNK2 8 9:30 on November 14, 2025 0 HTML0 UNK2 9 (Beijing time).
浙公网安备33010802003254号