On November 3, China Electric Power Construction Jilin Institute announced the results of the transaction of the energy storage system equipment procurement project for the EPC general contracting project of the sub-project 1 of the 1 million kilowatt and 4 million kilowatt hour independent energy storage project on the power supply side. The transaction unit of
the project is Zhuhai Hengqin Singularity Energy Storage Co., Ltd.
It is understood that the project is located in Dengkou County, Bayannaoer City, Inner Mongolia. The prefabricated cabin scheme is adopted, with a total capacity of 500MW/2GWh. A total of 100 energy storage subsystems are configured in this phase, each of which includes four energy storage battery prefabricated cabins and one power integrated machine.
In addition, 8 station electric cabins, 4 local monitoring cabins and 4 prefabricated cabins for spare parts are provided.
浙公网安备33010802003254号