1.36 billion yuan! The consortium of CCCC First Highway Engineering Co., Ltd. won the bid for the urban village reconstruction project

2025-03-11 10:24:12

Construction scale: survey, design, construction, installation, landscape, facilities, procurement and other turnkey projects within the planning scope of Badong Village, Baxi Village and Shierliying Village. The total construction area of the project is about 451,123 square meters. See the design specification for other details, and the actual construction contents required by relevant competent authorities and the Tenderee shall prevail.

Dongchangfu District Badong Village, Baxi Village and Shierliying Village Urban Village Reconstruction Project EPC

Construction Location: Dongchangfu District, Liaocheng City

Construction Scale: Survey, design, construction, installation, landscape, facilities, procurement and other turnkey projects within the planning scope of Badong Village, Baxi Village and Shierliying Village. The total construction area of the project is about 451,123 square meters. See the design specification for other details, and the actual construction contents required by relevant competent authorities and the Tenderee shall prevail. Total

planned investment: about 0.75 million RMB yuan of 137273.

The project content includes but is not limited to the relevant survey and design (preliminary design, preliminary design review and construction drawing design, construction drawing design review) of all projects such as the courtyard wall of the residential area and the single building within the courtyard wall, underground buildings, roads in and around the residential area, integrated pipelines, fire protection, civil air defense, landscape greening, ancillary facilities, intellectualization, maintenance, etc. BIM design, assembly design, detailed design, design change, etc.), procurement, construction, installation, commissioning, acceptance, warranty and cooperate with the tenderee to handle the formalities, household handover, defect repair within the warranty period and other general contracting of the whole process of the project and all social relations; Finally, the actual construction content shall prevail, in which the survey results shall be provided in 30 days and the preliminary design results shall be provided in 45 days.

Bid winning information:

First place: CCCC First Highway Engineering Group Co., Ltd.

Qingdao Coastal Architectural Design Co., Ltd.

Shandong Huiyu Civil Engineering Co., Ltd.

Preliminary bid amount 1363808957.3 RMB 0 HTML0UN K10 Second place: Shandong Xincheng Construction Engineering Co., Ltd. 0 HTML0 1365854171.4 1 Shanghai Lianchuang Design Group Co., Ltd. 0 HTML0 1365854171.4 2 Jinan Municipal Engineering Design and Research Institute (Group) Co., Ltd. 0 HTML0 1365854171.4 3 Pre-bid amount 1365854171.4 yuan 0 HTML0 1365854171.4 4 Third place : Shandong Liaojian Modern Construction Co., Ltd. 0 HTML0 1364895841.09 5 Beijing Yunxiang Architectural Design Co., Ltd. 0 HTML0 1364895841.09 6 Shandong Hydro-engineering-environmental Geological Engineering Co., Ltd. 0 HTML0 1364895841.09 7 Pre-bid Amount 1364895841.09 yuan 0 HTML0 1364895841.09 8

All can be viewed after purchase
Correlation