Guangdong is planned to rise by 30-50 yuan/ton, and the specific situation needs to be tracked. The market of the two lakes is mainly stable temporarily.
The price of cement in the Pearl River Delta region of Guangdong is planned to rise by 30-50 yuan/ton, and the specific situation needs to be tracked. The market of the two lakes is mainly stable temporarily.
The price of cement in the Pearl River Delta region of Guangdong is planned to rise by 30-50 yuan/ton, and the specific situation needs to be tracked. The market of the two lakes is mainly stable temporarily.
2025-10-24 16:42:06
CEMPI
102.2
-0.27 -0.26%
CONCPI
90.90
-0.14 -0.15%
CLKPI
110.80
-0.91 -0.81%
SPPI
45.04
-0.01 -0.02%
MORPI
73.32
0.00 0.00%
On November 11, the Economic and Credit Department of Hubei Province issued the Announcement on the Replacement Scheme of Supplementary Capacity for the 6166-ton Cement Clinker Production Line Project of Gezhouba Songzi Cement Co., Ltd. According to the Announcement, the 4000t/d clinker production line of Gezhouba Songzi Cement Co., Ltd. will supplement the production capacity of 1666t/d + 500t/d, totaling 2166t/d. After the supplement, the total production capacity of the production line will reach 6166 t/d.