Project Name: Announcement
of Bid Winning Results of Longgaozhao Urban Renewal Project (Phase III) in Luyang District Project Location: Luyang District
, Hefei City Project Scale: The project site is located in Longgaozhao District, Luyang District, Hefei City. The construction of this project mainly includes residential buildings (some of which are more than 20 floors high), commercial buildings and supporting facilities in the project plot. The total construction area of the project is about 47 square meters, including LY09-C-23-02 plot (with A construction area of about 100,800 square meters), LY09-A-08-01 plot (with A construction area of about 38,100 square meters), LY09-A-08-05 plot (with A construction area of about 45,100 square meters), LY09-A-08-06 Plot (building area of about 122,200 square meters), LY09-A-08-07 Plot (building area of about 55,700 square meters), LY09-A-08-09 Plot (building area of about 48,600 square meters), LY202509 (LY04-B-09-05) land parcel (with a construction area of about 6.
Expected entry date of the bidding project: October
2025 Service period: The cooperation period is tentatively set at 6 years, of which the construction period of a single sub-project is not more than 3 years and the operation period is 3 years.
Bidding scope: mainly including project investment, construction, agent construction and consignment, operation and maintenance, handover and other services. See the Employer's requirements for details. The design scope, construction scope and agent construction scope are as follows: LY09-C-23-02 Plot, LY09-A-08-01 Plot, LY09-A-08-05 Plot, LY09-A-08-06 Plot, LY09-A-08-07 Plot, LY09-A-08-09 Plot, LY202509 Plot, Eight sub-projects of agent green space (including North Second Ring Road and Northwest Corner Square of Sili River Road). The scope of consignment includes seven sub-projects: LY09-C-23-02 Plot, LY09-A-08-01 Plot, LY09-A-08-05 Plot, LY09-A-08-06 Plot, LY09-A-08-07 Plot, LY09-A-08-09 Plot and LY202509 Plot. If the regulatory plan is adjusted to a pure commercial plot or a residential plot (including mixed commercial and residential land) that is not sold to the public according to the requirements of the tenderee, the plot is not within the scope of the consignment project. Estimated
contract price: 352317: 640,000 yuan
Bid winning information:
Name of bid winning (transaction) unit:
CSCEC International Engineering Co., Ltd.
Hefei Jiahuan Construction Co., Ltd.
Zhongan Huali Construction Establishment Group Co., Ltd.
Hefei Vanke Ruicheng Real Estate Co., Ltd.
Coal Industry Hefei Design and Research Institute Co., Ltd.
Shanghai Tianhua Architectural Design Co., Ltd. Consortium
Project Name: Resource Utilization and Sugar of Livestock and Poultry Manure in Qinnan District and Qinbei District of Qinzhou City Sugarcane Ecological Planting and Breeding Recycling Industry A2 Bid Section Design-Procurement-Construction (EPC) General Contracting Successful Candidate Announcement
Date Location: Guangxi Zhuang Autonomous Region, Qinzhou City
Construction Scale: 1. Sugarcane High-quality Development Suitable for Machinery, Water and Fertilizer Base. Build or upgrade high-standard farmland: take 250 mu as a sub-unit, Total construction 7.
Estimated contract price: Investment amount is about 13.
Bid winning information:
No.1: Yunnan Jiantou First Water Conservancy and Hydropower Construction Co., Ltd.
China Construction Fourth Engineering Bureau Co., Ltd.
China Construction First Engineering Group South China Construction Co., Ltd.
Jinan Urban Construction Group Co., Ltd.
Anhui Construction Engineering Water Conservancy Development Investment Group Co., Ltd.
Guangxi Hanhua Engineering Technology Consulting Group Co., Ltd. (Consortium)
Tender offer: 134325: RMB 0.00000000 ML0 UNK2 7 No.2: Zhongtong Construction Engineering Urban Construction Group Co., Ltd. 0 HTML0 UNK2 8 Guangxi Hanhe Architectural Planning and Design Co., Ltd. (Consortium) 0 HTML0 UNK2 9 Tender offer: 134676 of RMB 0.0000 million 0 HTML0 UNK3 0 No.3: Xinbang Construction Group Co., Ltd. 0 HTML0 UNK3 1COSCO Zhixin Design Co., Ltd. (Consortium) 0 HTML0 UNK3 2Bidding Price: 134797: RMB 500000 0 HTML0 UNK3 3Project Name: Class II Urban Residential Land Project of HD00-1412-0017 Plot (Phase II) of Shanty Town Reconstruction Balance Fund Plot in Baoshan Village, Haidian District, Beijing Construction site: Sijiqing Town, Haidian District 0 HTML 0 UNK3 5 Construction scale: The total construction area is about 92544. 82 square meters, and the above-ground construction area is 60044. 82 square meters. Underground construction area 32500. 0 HTML0 China Construction Third Engineering Bureau 6 bid-winning information: 0 HTML0 UNK3 7 bid winner: UNK3 Second Construction Engineering Co., Ltd. 0 HTML0 UNK3 8 bid price (RMB): 719619128. There are about 2500 new sheep houses, and the total investment of new sheep houses is about 112.5 million yuan. The source of funds is self-raised by enterprises. 0 HTML0 UNK3 9 Planned construction period: from October 20, 2025 to October 19, 2027 (a total of 730 calendar days) 0 HTML0 UNK4 0 Bid winning information: 0 HTML0 UNK4 1 Bid winner: China Construction Third Engineering Bureau Group Co., Ltd. 0 HTML0 UNK4 2 Zhongke Shenghua Engineering Group Co., Ltd. 0 HTML0U NK43 Project Name: Announcement of Bid Winning Results of Zhangjiang Road Extension Section and Connection Road Project (Integration of Construction and Operation) in Binhai New City, Fuzhou 0 HTML 0 UNK4 4 Construction Location: Changle District, Fuzhou City, Fujian Province 0 HTML 0 UNK4 5 Construction Scale: This bidding project includes 2 sub-projects. They are the extension and connection road works of Zhangjiang Road in Binhai New Town, Fuzhou, and the road works of Bailou Road Section B (Xincuo North Road-Zhangjiang Road) in Binhai New Town, Fuzhou. The specific construction contents are as follows: 0 HTML0 UNK4 6 (1) Fuzhou Binhai New City Zhangjiang Road Extension Section and Connection Road Project: The starting point of this subproject is connected to the existing Daoqing Road and the existing Xianbin Road, the road grade is urban trunk road, the design speed is 60 km/H, the total road construction length is 2715.25 m, and the width of the road red line is 40-50 m; Mazhang Road starts from the existing Zhangdong Road and ends at Zhangjiang Road of the project. The road grade is urban trunk road with a construction length of 316. The pipe network project includes water supply pipe DN300 ~ DN600 with a length of 6218 meters, rainwater pipe D600 ~ D1600 with a length of 8117 meters, and sewage pipe D300 ~ D500 with a length of 3473 meters. The implementation includes road engineering, bridge engineering, traffic engineering, water supply engineering, drainage engineering (rainwater, sewage), greening engineering, lighting and power engineering and ancillary facilities engineering. 0 HTML0 UNK4 7 (2) Fuzhou Binhai New City Bailou Road Section B (Xincuo North Road-Zhangjiang Road) Road Works: This subproject starts from Xincuo North Road, extends eastward, and ends at Zhangjiang Road. The road grade is urban trunk road, and the design speed is 50 km/H. The length of road construction is 204. The pipe network project includes water supply pipe DN200 ~ DN500 with a length of 550 meters, rainwater pipe D300 ~ D1000 with a length of 844 meters, and sewage pipe D400 with a length of 374 meters. The implementation includes road engineering, traffic engineering, water supply engineering, drainage engineering (rainwater, sewage), greening engineering, lighting and power engineering and ancillary facilities engineering.
Bid winning information:
Name of bid winner: CSCEC Strait Construction and Development Co., Ltd.
Member of the consortium: Fuzhou Planning and Design Institute Group Co., Ltd.
Fuzhou Chengcheng Supply Chain Management Co., Ltd.
Total contract price: 3250 80706 yuan
Project Name: Fuzhou Binhai New Town CBD Surrounding Road Network and Pipe Network Supporting Project (Integration of Construction and Operation) Public Announcement
of Bidding Results Construction Location: Changle District, Fuzhou City
Construction Scale: This bidding project includes 4 sub-projects. They are Fuzhou Binhai New Town Shawei Road (Daoqing Road-Wanxin Road) Road Project (Bid Section II), Fuzhou Binhai New Town Binjiang Binhai Road Surrounding Connection Road Project (Bid Section II), Fuzhou Binhai New Town Hujing Road (S201-Shawei Road) Road Project (Bid Section II), Road works of longitudinal branch road network in CBD area west of Shawei Road, Binhai New Town, Fuzhou (the fourth bid section). The specific construction contents are as follows: (1) Fuzhou Binhai New City Shawei Road (Daoqing Road-Wanxin Road) Road Project (the second bid section): This subproject is the second bid section of Fuzhou Binhai New City Shawei Road (Daoqing Road-Wanxin Road) Road Project. The project starts from Hengjiu Road and ends at Hengsan Road, with a length of 876. The road grade is urban secondary trunk road, with a design speed of 40 km/H. The road width is 40-47m. The pipe network project includes water supply pipe DN200 ~ DN600 with a length of 2330 m, rainwater pipe D 600 ~ D1400 with a length of 2180 m, and sewage pipe D 400 ~ D500 with a length of 1000 m. The implementation includes road engineering, traffic engineering, water supply engineering, rainwater engineering, sewage engineering, pole engineering, power engineering, communication engineering and other ancillary works. (2) Fuzhou Binhai New City Binjiang Binhai Road Surrounding Connecting Road Project (the second bid section): This subproject is the second bid section of Fuzhou Binhai New City Binjiang Binhai Road Surrounding Connecting Road Project, including 6 municipal roads, ① Heng'er Road (Shahu Road): The road starts from Zongsan Road and ends at Binjiang Binhai Road, with a planned length of about 231 meters and a planned width of 22 meters. The road grade is urban branch road, and the design speed is 30 km/H; ② Hengqi Road (Fuhai Road): the road starts from Zonger Road and ends at Binjiang Binhai Road. The planned length of the road is about 223 meters, and the planned width is 25 meters. The road grade is urban branch road, and the design speed is 30 km/H; ③ Hengba Road: The road starts from Zonger Road and ends at Binjiang Binhai Road. The planned length of the road is about 232 meters, the planned width is 22 meters, the road grade is urban branch road, and the design speed is 30 km/H; ④ Huwen Road: The road starts from Zong'er Road and ends at Binjiang Binhai Road. The planned length of the road is about 249 meters, the planned width is 22 meters, the road grade is urban branch road, and the design speed is 30 km/H; ⑤ Hengshier Road F: The road starts from Hengshier Road and ends at Binjiang Binhai Road, with a planned length of about 385m and a planned width of 22m. The road grade is urban branch road with a design speed of 30km/H; ⑥ Hengshier Road G: The road starts from the connecting line of Xincun Road and ends at Hengshier Road A. The planned length of the road is about 335 meters, the planned width is 22 meters, the road grade is urban branch road, and the design speed is 30 km/H. The pipe network project includes 1521 meters of rainwater pipes and 1511 meters of water supply pipes. The implementation contents include road works, culvert works, drainage pipelines (rainwater and sewage), water supply pipelines, electrical and lighting, power pipes, communication pipelines, traffic and safety facilities, greening works and ancillary facilities. (3) Fuzhou Binhai New City Hujing Road (S201 ~ Shawei Road) Road Project (Bid Section II): This subproject is the second bid section of Fuzhou Binhai New City Hujing Road (S201 ~ Shawei Road) Road Project. The road starts from Shangruimen Road (Donghuan Road), connects with the built Zhangjiang River Bridge, extends eastward, and ends at Zhili Road (Shawei Road). The main intersecting roads along the line are Shugang Road (Zhangdong Road), Zhangjiang Road, Jingang Road, etc., with a design length of 1065.073 meters and a red line width of 40 ~ 51. The pipe network project includes a sewage pipe network D400 with a length of 500 meters and a rainwater pipe network D300 ~ D1200 with a length of 3067 meters; The water supply pipe network gauge is DN 300 ~ DN600, with a length of 2,245 meters. The implementation includes road engineering, water supply and drainage engineering, electrical engineering, traffic safety facilities and greening engineering. (4) Fuzhou Binhai New City Shawei Road West CBD Area Longitudinal Branch Road Network Project (the fourth bid section): This subproject is the fourth bid section of Fuzhou Binhai New City Shawei Road West CBD Area Longitudinal Branch Road Network Project. The road runs from north to south and starts from Xiahenglou Road. The line intersects with Shuangzhu Road, Yugong Road, Bingxin East Street, Yingxu Road, Mianzhai Road, Shanghenglou Road and Huating Street. As for Jiahai Road (Shahu Road), the stake number is ZSK0 + 172 ~ ZSK1 + 408.551, and the project length is 1707. The pipe network project includes rainwater pipe network D300 ~ D1400, with a length of 2633 meters; Sewage pipe network D 400, 1550m in length; water supply pipe network DN200-DN300, 1740m in length. The implementation includes road engineering, traffic engineering, water supply and drainage engineering, lighting and power engineering, greening engineering, etc. Requirements
for construction period: the total construction period or the planned commencement (completion) date is 300; the requirements for the construction period of each key node are (if any) the construction period of the project starts from the date of handling the construction permit, of which [1.2.3.
浙公网安备33010802003254号