Project Name: Huaxin · CCCC Fengqi Kechuang Port Project Bid Winning Result Announcement
Construction Location: East to: Qujiagang West to: Xintongbotang South to: Beiqing Highway North to: Fengxitang
Project Overview Description: There are three plots in this project: 11-10, 13-05 and 14-05. The total planned land area is 30585. 83 square meters, and the total construction area is 95373. 07 square meters. The total above-ground building area is 72442. 01 square meters, the total above-ground capacity area is 71645. 42 square meters, and the total underground building area is 22931. 06 square meters. The comprehensive building density is 38.91%, the comprehensive plot ratio is 2.342, the green space ratio is 20%, and the maximum number of floors is 1 underground and 13 above ground. Of which: Plot 11-10: the planned land area is 9638.31 square meters, the total building area is 27082. 31 square meters, the above-ground building area is 19462. 25 square meters, the above-ground capacity area is 19276. 62 square meters, the underground building area is 7620.06 square meters, the building density is 38.83%, the plot ratio is 2.0, and the green space ratio is 20%. Maximum number of floors: 1 underground and 5 above ground. Plot 13-05: The planned land area is 10475. 08 square meters, the total building area is 34499. 77 square meters, the above-ground building area is 26493. 18 square meters, the above-ground capacity area is 26187. 70 square meters, the underground building area is 8006.59 square meters, the building density is 38.94%, the plot ratio is 2.5, and the green space ratio is 20%. Maximum number of floors: 1 underground and 13 above ground. Plot 14-05: The planned land area is 10472. 44 square meters, the total building area is 33790. 99 square meters, the above-ground building area is 26486. 58 square meters, the above-ground capacity area is 26181. 10 square meters, the underground building area is 7304.41 square meters, the building density is 38.96%, the plot ratio is 2.5, and the green space ratio is 20%. Maximum number of floors: 1 underground and 13 above ground. The contracting scope includes but not limited to: main structure engineering, building decoration engineering, roof and waterproof engineering, indoor electrical engineering, water supply and drainage, temporary fence, termite control (if any), intersection opening, lightning protection detection, exterior wall coating engineering, door and window curtain wall engineering, fire engineering, weak current engineering, pile foundation, electricity, elevator, municipal garden, outdoor water supply engineering and other related engineering. See the bill of quantities and drawings for details. Total
project investment: RMB
100 million Construction and installation cost of this bid section: 35011: RMB 8,
100 Ceiling price: 35011: RMB 8,100
Construction period: 596 calendar days
Bid winning information: 0 HTML UNK8 Bid winner: CCCC Second Highway Engineering Co., Ltd. 0 HTML0 UNK9 Bid price: RMB 343,120,167 0 HTML0 34312 0 Project name: Announcement of Successful Candidates for the Construction Project of Tianchang to Yizheng Section of Ring Expressway in G9904 Nanjing Metropolitan Area 0 HTML0 UNK1 1 Project location: Tianchang City, Anhui Province 0 HTML0 UNK1 2 Project overview: The project starts from the starting point of Jinji North Hub Interchange in Tianchang City, connects with the loop line of Nanjing Metropolitan Area and Xinyi-Yangzhou Expressway, connects with the planned Jinhu-Yizheng Expressway, ends at the Anhui-Jiangsu provincial boundary near Wangying, Huangqiao Village, Jinji Town, and connects with the Yizheng section of the planned loop line of Nanjing Metropolitan Area, with a total length of 17.199 km. Highway grade: expressway; design speed: 120km/H; number of lanes: two-way six-lane; subgrade width: 34.5m. 0HTML0 UNK1 3 Bidding scope: 0HTML0 UNK1 4 Temporary works, subgrade, pavement, bridges and culverts, traffic safety, greening and environmental protection works, housing construction works and other contents within the scope of construction drawings and bill of quantities, including construction, acceptance and defect repair. The details shall be subject to the construction drawing and the bill of quantities. This project is divided into two bid sections, and the specific scope is as follows: 0 HTML0 828104210.72 5 Maximum bidding price limit: TY-1 construction bid section 828104210.72 RMB (including provisional sum 75000000 RMB 0.00); TY-2 construction bid section 745428153 RMB.86 (including provisional sum 65000000 RMB.00). 0 HTML0 Division of bid sections of UNK1 6:2 bid sections (TY-1 and TY-2). 0 HTML0 UNK1 7 Planned construction period: The planned construction period is 36 months, and the defect liability period is 2 years. 0 HTML0 530049308.17 8 Bid winning information: 0 HTML0 530049308.17 9TY-2 bid section 0 HTML0 UNK2 0 Name of the first successful candidate: CCCC Second Harbor Engineering Co., Ltd. 0 HTML0 UNK2 1 Bid price: 530049308.17 yuan 0 HTML0 UNK2 2
浙公网安备33010802003254号