for Construction and Mining of Copper Mine with Annual Output of 300,000 Tons in Baiyinwula, Balinzuo Banner , Chifeng City: design part: including but not limited to completion of tubular belt conveyor, ore transport road, connecting road, mining design, dump design, civil engineering (including tunnel), steel structure, All design contents of EPC project general contracting, such as equipment foundation, water supply and power technology, equipment technology, electrical technology related construction drawing design, budget cost, etc. Construction part: including but not limited to the completion of all construction contents of general contracting of EPC projects such as ramp, air shaft, main and auxiliary shafts, green mine construction, concentrator construction, filling station construction, tailings pond construction, mining, goaf filling, steel structure installation, equipment installation, etc. Procurement: procurement of all equipment and materials for EPC project. Bid winning information: First place: China Railway 24th Bureau Group Southwest Construction Co., Ltd. China Railway 24th Bureau Group Co., Ltd. Shaanxi Metallurgical Design and Research Institute Co., Ltd. Bid price: 2813.02 million yuan 0 HTML0U NK10 Second place: China Railway 20th Bureau Group Co., Ltd. 0 HTML0 279943 1 China Railway 20th Bureau Group No.2 Engineering Co., Ltd. 0 HTML0 UNK1 2 Shaanxi Mingde Tongsheng Engineering Design Co., Ltd. 0 HTML0 UNK1 3 Bid price: RMB 2,799,436,000 0 HTML0 UNK1 4 Third place: China Railway 12th Bureau Group Engineering Co., Ltd. 0 HTML0 281415 5 Shaanxi Yutai Architectural Design Co., Ltd. 0 HTML0 UNK1 6 Bid Price: RMB 2,814,152,000 0 HTML0 UNK1 7
