6 Engineering Bureaus of China Railway and China Railway Construction Corporation won the bid for high-speed rail big projects!

2025-10-20 13:24:21

The project starts from the newly-built Shanghai Baoshan Railway Station in Shanghai, passes through Suzhou City, Nantong City, Taizhou City, Yangzhou City, Nanjing City in Jiangsu Province, Chuzhou City and Hefei City in Anhui Province, and connects to the existing Hefei South Railway Station. The total length of the line is 553.762 kilometers, including 519.046 kilometers of new railways. There are 16 stations on the whole line, including 10 new stations. Supporting the construction of Shanghai Baoshan and Nanjing North EMU operation stations, the expansion of Nantong EMU operation stations, and the simultaneous implementation of the reconstruction project of Nanjing hub general speed system (Jiangbei area) and other related projects.

New Shanghai-Nanjing-Hefei High-speed Railway Station Building and Related Project

Construction Location: Shanghai and Jiangsu Province.

Construction Scale: The project starts from the newly-built Shanghai Baoshan Railway Station in Shanghai, passes through Suzhou City, Nantong City, Taizhou City, Yangzhou City and Nanjing City in Jiangsu Province, Chuzhou City and Hefei City in Anhui Province, and connects to the existing Hefei South Railway Station. The total length of the line is 553.762 kilometers, including 519.046 kilometers of new railways. There are 16 stations on the whole line, including 10 new stations. Supporting the construction of Shanghai Baoshan and Nanjing North EMU operation stations, the expansion of Nantong EMU operation stations, and the simultaneous implementation of the reconstruction project of Nanjing hub general speed system (Jiangbei area) and other related projects.

Main technical standards: railway grade: high-speed railway. Number of main lines: double lines. Design speed: 350 km/H. Minimum plane curve radius: 7000m in general section (5500m in difficult section), and the standard suitable for driving speed shall be adopted in the section where the hub is introduced. Maximum gradient: 20 ‰ in general section (25 ‰ in difficult section). Type of traction: electric power. Effective length of receiving-departure track: 650m. Train operation control mode: CTCS-3 train control system. Dispatching command mode: centralized traffic control. Other technical standards shall be subject to the Code for Design of High-speed Railway (TB 10621-2014). The planned total construction period of the

Project (including joint commissioning and operation test): 7 years for the section from Shanghai Baoshan Station (including) to Qidong Station (excluding), and 5 years for the section from Qidong Station (including) to the boundary between Jiangsu and Anhui.

Planned commencement date: October 2025. Planned completion date: October 2027.

Bid winning information

First place in HSZF-1 bid section

: China Railway 24th Bureau Group Co., Ltd.

Bid price: 87102. 3944 (RMB 10,000)

Second place: China Railway Construction Engineering Group Co., Ltd.

Bid price: 87108: RMB 74.48 million

Third place: China Railway Beijing Engineering Bureau Group Co., Ltd.

Bid price: 87102: RMB 76.77 million 0HT ML0 41127 4HSZF-3 Bid Section 0 HTML0 UNK1 5 First Place: China Railway Shanghai Engineering Bureau Group Co., Ltd. 0 HTML0 UNK1 6 Bid Price: 41127.1111 (RMB ten thousand) 0 HTML0 41130 7 Second place: China Railway Construction Engineering Group Co., Ltd. 0 HTML0 UNK1 8 Bid price: 411.301635 (RMB ten thousand) 0 HTML0 UNK1 9 Third place: China Construction Eighth Engineering Bureau Co., Ltd. 0 HTML0 41127 0 Bid price: 411.276940 (RMB ten thousand) 0 HT ML0 UNK2 1HSZF-4 Bid Section 0 HTML0 UNK2 2 First Place: China Railway Electrification Bureau Group Co., Ltd. 0 HTML0 UNK2 3 Bid Price: 48157.4507 (RMB 10,000) 0 HTML0 48153 4 Second place: China Railway Construction Engineering Group Co., Ltd. 0 HTML0 UNK2 5 Bid price: RMB 481.537229 million 0 HTML0 UNK2 6 Third place: China Railway 14th Bureau Group Co., Ltd. 0 HTML0 UNK2 7 Bid price: RMB 481.535842 million 0 HTML 0 UNK2 8HSZF-5 Bid Section 0 HTML0 UNK2 9 First Place: China Railway 15th Bureau Group Co., Ltd. 0 HTML0 UNK3 0 Bid Price: 28891.0929 (RMB 10,000) 0 HTML0 UNK3 1 Second place: China Railway Construction Engineering Group Co., Ltd. 0 HTML0 UNK3 2 Bid price: 28890 of RMB 8914 (RMB 10,000) 0 HTML0 UNK3 3 Third place: China Construction Eighth Engineering Bureau Co., Ltd. 0 HTML0 UNK3 4 Bid price: 28889 of RMB 1118 (RMB 10,000) 0 HT ML0 UNK3 5 HSZF-6 Bid Section 0 HTML0 UNK3 6 First Place: China Railway 12th Bureau Group Co., Ltd. 0 HTML0 UNK3 7 Bid Price: 172787 0.3705 (ten thousand yuan) 0 HTML0 UNK3 8 Second Place: China Railway Construction Engineering Group Co., Ltd. 0 HTML0 UNK3 9 Bid Price: 172783 .5123 (RMB ten thousand) 0 HTML0 UNK4 0 Third place: China Railway Beijing Engineering Bureau Group Co., Ltd. 0 HTML0 UNK4 1 Bid price: 172789.60.63 (RMB ten thousand) 0 HTML0 UNK4 2 HSZF-7 bid section 0 HTML0 UNK4 3 First place: China Railway Construction Group Co., Ltd. 0 HTML0UN K44 Bid Price: 89666 70.4 million yuan 0 HTML0 UNK4 5 Second place: China Railway Construction Engineering Group Co., Ltd. 0 HTML0 UNK4 6 Bid Price: 89669 56.89 million yuan 0 HTML0 UNK4 7 Third place: China Railway Tenth Bureau Group Co., Ltd. 0 HTML0 UNK4 8 Bid Price: 89 6,655,899 (ten thousand yuan) 0 HTML0 UNK4 9 Supervision HSZFJL-1 bid section 0 HTML0 UNK5 0 First place: Lanzhou Jiaotong University Engineering Consulting Co., Ltd. 0 HTML0 UNK5 1 Bid price: 16,525,767 (ten thousand yuan) 0 HTML0 UNK5 2 Second place: Shanghai First Construction Supervision Co., Ltd. 0 HTML0 UNK5 3 Bid price: 16.520000 (ten thousand yuan) 0 HTML0 UNK5 4 Third place: Henan Great Wall Railway Engineering Construction Consulting Co., Ltd. 0 HTML0 UNK5 5 Bid price: 1653.0000 (RMB 10,000) 0 HTML0 UNK5 6 Supervision of HSZFJL-2 Bid Section 0 HTML0 UNK5 7 First place: Tianjin New Asia-Pacific Engineering Construction Supervision Co., Ltd. 0 HTML0 UNK5 8 Bid price: 1982.0000 (RMB 10,000) 0 HTML0 UNK5 9 Second place: Henan Great Wall Railway Engineering Construction Consulting Co., Ltd. 0 HTML0 UNK60 Bid price: 1983.0000 (RMB 10,000) 0 HTML0 UNK61 Third place: Shanghai First Construction Supervision Co., Ltd. 0 HTML0 UNK62 Bid price: 1982.0000 (RMB 10,000) 0HTML0UNK63

All can be viewed after purchase
Correlation

The project starts from the newly-built Shanghai Baoshan Railway Station in Shanghai, passes through Suzhou City, Nantong City, Taizhou City, Yangzhou City, Nanjing City in Jiangsu Province, Chuzhou City and Hefei City in Anhui Province, and connects to the existing Hefei South Railway Station. The total length of the line is 553.762 kilometers, including 519.046 kilometers of new railways. There are 16 stations on the whole line, including 10 new stations. Supporting the construction of Shanghai Baoshan and Nanjing North EMU operation stations, the expansion of Nantong EMU operation stations, and the simultaneous implementation of the reconstruction project of Nanjing hub general speed system (Jiangbei area) and other related projects.

2025-10-20 13:24:21

Statistics of Imported Clinker Sources from January to September 2025 (by Country)