Latest Progress of Longji 8.6G W Reconstruction and Expansion Component Project!

2025-06-26 09:52:48

On June 20, the Bureau of Ecology and Environment of Jiaxing City, Zhejiang Province, announced the approval decision on the EIA document of Jiaxing Longji Photovoltaic 8.6G W Single Crystal Module Reconstruction and Expansion Project.

On June 20, the Bureau of Ecology and Environment of Jiaxing City, Zhejiang Province, announced the approval decision on the EIA document of Jiaxing Longji Photovoltaic 8.6G W Single Crystal Module Reconstruction and Expansion Project .

It is reported that the total investment of the project is 257.79 million yuan , including 500,000 yuan for environmental protection. The construction site is located on the east side of Baiyunqiao Road and the south side of Jixiang West Road, Wangdian Town, Xiuzhou District, Jiaxing City. Using 17 production lines of existing spare workshops (1 , 3 , 4 # and 6 # workshops) to carry out technical transformation and intelligent upgrading, it is planned to purchase new facilities and equipment such as automatic glue adding equipment, screen printing equipment, scribing welder, overlap welder, junction box AI equipment, battery EPL and so on, and to upgrade typesetting machine, assembly line and other related facilities and equipment. After the completion of the project, the production capacity of monocrystalline modules is expected to increase by 8.6GW . According to

the data, Jiaxing Longji Photovoltaic Technology Co., Ltd. is a wholly-owned subsidiary of Longji Green Energy, and the actual production capacity of monocrystalline modules in 2024 is 9.5G W .


All can be viewed after purchase
Correlation

On June 20, the Bureau of Ecology and Environment of Jiaxing City, Zhejiang Province, announced the approval decision on the EIA document of Jiaxing Longji Photovoltaic 8.6G W Single Crystal Module Reconstruction and Expansion Project.

2025-06-26 09:52:48

On June 22, the front page of Jiangsu Huai'an Daily published an article focusing on the progress of local project construction. The article mentions that the project of Trina Solar Huai'an Base is pushing forward.

2025-06-24 09:39:42

The Port Coal Price Statistics Table shows the port coal prices in different regions. On the whole, some port prices have changed and some have not changed. Among them, the price change of Indonesian coal (3800 calorific value) at Xinsha Port is relatively large, with an increase of 30%; the price change of general bituminous coal (5500 calorific value, 5000 calorific value) at Qinhuangdao Port, general bituminous coal (5500 calorific value) at Sime Darby Port and Indonesian coal (3800 calorific value) at Haichang Port is relatively small, with a change value of 0. The data comparison time is April 2, 2026 and March 26, 2026.