Tianshan Material withdraws from a 2500t/d clinker production line

2025-06-24 10:08:47

The announcement shows that the replacement capacity of Yulong Tongli Cement 4500t/d clinker production line in Zhumadian is 1000t/d, and the capacity of the production line after the replacement is 5500t/d.

On June 23, the Bureau of Industry and Information Technology of Zhumadian City, Henan Province issued the "Announcement on the Capacity Supplement Scheme of the 4500-ton Cement Clinker Production Line of Yulong Tongli Cement Co., Ltd. in Zhumadian City".

The announcement shows that the replacement capacity of Zhumadian Yulong Tongli Cement 4500t/d clinker production line is 1000t/d, and the capacity of the production line after the replacement is 5500t/d;

Withdrawn production capacity comes from a 2500t/d clinker production line of Henan Tongli Cement, and 1500t/d production capacity is used for this project, with a replacement ratio of 1.5: 1.

All can be viewed after purchase
Correlation

The announcement shows that the replacement capacity of Yulong Tongli Cement 4500t/d clinker production line in Zhumadian is 1000t/d, and the capacity of the production line after the replacement is 5500t/d.

2025-06-24 10:08:47

Through the implementation of energy management and control and the establishment of management and control system, cement enterprises can truly achieve safe and excellent energy supply, and ultimately achieve the goal of improving the overall energy efficiency, reducing consumption, reducing costs, and improving the intelligent level of cement manufacturing and management.