Evergreen 6600t/d cement clinker line co-processing solid waste project will be put into operation

2024-02-27 16:40:44

Jiangxi De'an Wannianqing Cement Co., Ltd.'s 6600t/d new dry process cement clinker production line co-processing solid waste project is a key project of the provincial building materials group, with a total investment of about 240 million yuan, a total planned annual disposal capacity of 50000 tons of hazardous waste, 50000 tons of fly ash, and a daily disposal capacity of 300 tons. It mainly constructs 16 systems such as waste storage, pretreatment, fly ash storage and transportation, water washing and desalination, water purification, evaporation and salt production, fly ash drying and finished ash into the kiln. Hazardous waste disposal involves 15 categories and 163 codes. The construction starting point is high, the standard is high and the construction is difficult. Last year, the environmental protection company overcame many difficulties, completed the main body of the pre-disposal workshop, the main plant and the complex building, and achieved phased results in the construction of environmental protection projects.

After the start of construction in the Spring Festival of the Year of

the Dragon, the solid waste project under construction by Jiangxi Building Materials Group, with the attitude of "starting is sprinting", pressed the "fast-forward key" to resume production after the festival. The solid waste co-disposal project of 6600t/d new dry process cement clinker production line of

Jiangxi De'an Wannianqing Cement Co., Ltd. is a key project of the provincial building materials group, with a total investment of about 240 million yuan. The master plan can dispose of 50,000 tons of hazardous waste and 50,000 tons of fly ash per year, with a daily disposal capacity of 300 tons. It mainly constructs 16 systems, including waste storage, pretreatment, fly ash storage and transportation, water washing and desalination, water purification, evaporation and salt production, fly ash drying and finished ash entering the kiln. Hazardous waste disposal involves 15 categories and 163 codes. The construction starting point is high, the standard is high and the construction is difficult. Last year, the environmental protection company overcame many difficulties, completed the main body of the pre-disposal workshop, the main plant and the complex building, and achieved phased results in the construction of environmental protection projects. After

the Spring Festival, De'an Environmental Protection Company entered the sprint stage of the decisive battle to put into production, and the resource reserve is a key link. Nowadays, all the hazardous waste disposal equipment of the project is installed in place, and the fly ash project is under construction in an orderly manner. It is reported that the company has signed the Government Procurement Contract for Fly Ash Disposal with the Jiujiang Municipal Government, which can ensure the production of full-load resources after the project is put into operation, and realize the "zero landfill" of waste incineration fly ash.

All can be viewed after purchase
Correlation

Data show that from January to October 2023, the national cement output was 1685.85 million tons, so the total cement output from January to October this year decreased by 184.69 million tons, or 10.96%, compared with the same period last year.