SINOMA's MAL01 project in Lahau, Poland successfully ignited and produced the first batch of clinker

2024-02-02 10:15:52

Recently, the MAL01 project in Lahao, Poland, which was constructed by Sinoma International, successfully ignited and produced the first batch of clinker.

Recently, the MAL01 project in Lahao, Poland, which was constructed by Sinoma International, successfully ignited and produced the first batch of clinker . Stanislaw Sobczyk, Industrial Director of Holcim, Poland, Krzysztof Byczynski, Project Director, and Assistant General Manager of Sinoma Zhike witnessed the ignition of the project together with the project builders.

On January 25, following the successful ignition of the project, the first batch of clinker was produced smoothly, marking a major stage achievement of the Lahao MAL01 project.

Lahao MAL01 project is the largest project under construction of Holcim Group in Europe. The scope of the project includes from raw material processing to clinker transportation, including alternative fuel processing and metering transportation. It is the world's first clinker production line using 90% alternative fuels. At the same time, it is equipped with intelligent projects such as domestic pure low-temperature waste heat power generation and one-button start-stop. After the project is put into operation, the annual output of clinker will be 1.15 million tons. In December

2023, the Lahao MAL01 project was selected as the "Typical Case of China-EU Green and Low Carbon Development Cooperation in 2023".

All can be viewed after purchase
Correlation