Cement Net Exclusive: Replenishing Production Capacity Is Not New, Its Essence Is Rectification

2024-09-12 13:34:14

For the capacity replacement plan of the supplementary capacity project, the emphasis is on the supplement, as long as it is clear where the supplementary capacity comes from, and it is the compliance capacity. Other elements and procedures can and should be appropriately simplified. For example, whether the cross-provincial replacement of production capacity for supplementary projects needs to be the same as new projects, and whether the procedure of holding hearings can be simplified.

In January

2020, the official website of the Ministry of Industry and Information Technology published the administrative explanation of "Questions and Answers on the Implementation Measures of Capacity Replacement in Cement and Glass Industry". When asked about the scope of capacity replacement projects, the third part of the scope of the reply is the difference in the case of "approving small projects to build large ones".

It shows that the difference part of the project of "approving small and building large" is the capacity that needs to be supplemented. The supplement of this part of production capacity shall comply with the provisions of the Measures for the Implementation of Capacity Replacement in the Cement Industry, namely the original [2021] No.80 document of the Ministry of Industry and Information Technology.

Specific implementation includes but is not limited to that the capacity of cement clinker production line used to supplement capacity replacement must be compliant and effective; The capacity replacement ratio shall be no less than 2:1 for cement clinker construction projects located in the key areas of air pollution prevention and control stipulated by the state; For cement clinker construction projects located in non-key areas of air pollution prevention and control, the capacity replacement ratio shall not be less than 1.5: 1, and the cement clinker production line restricted by the national industrial structure adjustment catalogue shall be used as the replacement index and the inter-provincial replacement cement clinker index, and the capacity replacement ratio shall not be less than 2:1 ; The capacity replacement plan of the construction project shall be formulated by the project construction enterprise and submitted to the provincial competent department of industry and information technology at the project construction site for examination and approval, and then publicized and announced. For the replacement of production capacity across provinces, the enterprises that transfer production capacity shall formulate a plan for the transfer of production capacity, which shall be submitted to the competent industrial and information departments at the provincial level for publicity and announcement; In case of trans-provincial replacement, the competent department of industry and information technology at the provincial level in the place of transfer shall verify and confirm the capacity indicators, and announce the basic information of the proposed construction project provided by the enterprise on the portal website. Before publicizing the capacity replacement plan, the competent department of industry and information technology at the provincial level in the place of project construction shall entrust a national industry organization or intermediary agency to hold a replacement hearing.

For the capacity replacement plan of the supplementary capacity project, the emphasis is on the supplement, as long as it is clear where the supplementary capacity comes from, and it is the compliance capacity. Other elements and procedures can and should be appropriately simplified. For example, whether the cross-provincial replacement of production capacity for supplementary projects needs to be the same as new projects, and whether the procedure of holding hearings can be simplified.

Supplementary capacity is essentially the rectification of project capacity scale. As for the other work that needs to be approved by the relevant parties before the (new) filing capacity declaration of the project, it is the "preliminary" work to be carried out after the formulation of the capacity replacement plan. That is to say, the entry into force of this compliance capacity is not the time for the competent authorities to announce the replacement plan for supplementary capacity. There is no planned time for ignition and production!

Recently, the Department of Economy and Information Technology of Zhejiang Province issued the Notice of Supplementary Capacity Replacement Scheme of Jiande Southern Cement Co., Ltd. of Hangzhou Shanya Southern Cement Co., Ltd. The table of

production capacity does not mechanically apply to the table of production capacity of construction projects, and the content of the column is concise and clear, which is worth imitating.

All can be viewed after purchase
Correlation

尽管在需求旺盛时期,过多的产能大部分可以被吸收,但近年来我们看到需求低迷造成全球产能过剩,特别是在中国、欧洲、东地中海和中东地区。

2018-05-14 11:08:58

Recently, due to the persistent cost pressure in the south, the price of concrete has risen slightly with the raw materials, but the growth of market demand is limited, and the overall quotation is still stable. From October 31 to November 6, the national concrete price index closed at 112.47 points, up 0.31% annually and down 10.11% year-on-year.