Recently, the Natural Resources and Planning Bureau of Zaozhuang City, Shandong Province, issued the "Shandong United Wangqi Cement Co., Ltd. 4000t/d New Dry Process Cement Clinker Production Line and Waste Heat Power Generation Project Planning Approval Announcement".
It is understood that the total investment in the technical transformation of the 4000t/d cement clinker new dry process production line project of Shandong United Wangqi Cement Co., Ltd. is 1 billion yuan, which is based on the daily output of 2500t/d. Equipment renewal and technical transformation are upgraded to 4000t/d new dry process cement clinker production line and supporting construction of 6MWh waste heat power generation system to realize intelligent, digital, energy-saving and environmental deepening of production process and equipment level. After the
project is put into operation, the total cost per ton of clinker will be reduced by 15.13%, the annual output of clinker will be 1.24 million tons, the annual power generation will be 32.24 million kWh, the annual power supply will be 30.3 million kWh, the annual output value will be increased by 500 million yuan, and the tax revenue will be increased by 50 million yuan.