In October, Tianrui Zhengzhou Cement Rotary Kiln continued to operate safely throughout the month, producing a total of 399389 tons of clinker , with an average hourly output of 536.8 t/H, both breaking the historical record.
In October, Tianrui Zhengzhou Cement was arranged in advance according to the arrangement of off-peak kiln shutdown, requiring the production department to seize the limited production time, strengthen the management of equipment and process, and ensure the high-quality operation of production equipment.
The burning branch strictly implements the three-level patrol inspection, the on-duty personnel of the branch focus on the patrol inspection of high, partial, remote and main equipment, the section and post regularly inspect the regional equipment, find hidden dangers and timely report the management, so as to ensure the continuous and stable operation of the equipment. According to the raw coal inventory, the
quality and technology department timely adjusts the raw meal proportioning, so that the ratio of the raw meal entering the kiln is stable, the temperature of the secondary and tertiary air entering the kiln is high, and the clinker is calcined well. For central control operation, statistics and analysis of key indicators of kiln and grinding system shall be conducted in each shift, and operation parameters shall be adjusted in time to reduce consumption. Portable gas analyzer shall be used to measure the preheater, calciner and other positions every day, and the measurement data shall be used as the basis to guide the operation adjustment, so as to achieve high quality and high yield. A journey of
a thousand miles begins with a single step. Tianrui Zhengzhou Cement will continue to do a good job in the management of technology, equipment and electricity step by step, and create better results with full enthusiasm.