Another New Energy Company Applies to Raise Funds to Build Photovoltaic Projects

2023-07-21 10:26:00

Yicheng New Energy intends to raise no more than 2.5 billion yuan to expand the company's lithium battery production capacity and enhance the installed capacity of the company's photovoltaic power plants. This application has been accepted by Shenzhen Stock Exchange.

On July 21, Henan Yicheng New Energy Co., Ltd. (Hereinafter referred to as "Yicheng New Energy") issued a prospectus (declaration) for issuing stocks to specific targets, which was accepted by Shenzhen Stock Exchange.

Yicheng Xinneng intends to raise a total of no more than 2.5 billion yuan (including this number), mainly for the construction of lithium-ion battery anode materials and distributed photovoltaic power station projects.

The announcement shows that the main reason for Yicheng Xinneng's fund-raising is to expand the production capacity of lithium batteries and enhance the installed capacity of photovoltaic power plants, help the company upgrade its new energy strategy industry and enhance its market competitiveness.

It is reported that Yicheng Xinneng was founded in 1997 with a registered capital of 2.081 billion yuan and listed in June 2010. The company's main business is: production and sales of high-efficiency monocrystalline silicon cells, production and sales of lithium batteries, operation of solar power plants and production and sales of ultra-high power graphite electrodes and anode materials. Up to now, the largest shareholder of Yicheng New Town, China Pingmei Shenma Group, holds 48.51% of the shares, and the actual controller is Henan SASAC.

All can be viewed after purchase
Correlation

Yicheng New Energy intends to raise no more than 2.5 billion yuan to expand the company's lithium battery production capacity and enhance the installed capacity of the company's photovoltaic power plants. This application has been accepted by Shenzhen Stock Exchange.

2023-07-21 10:26:00

The Department of Industry and Information Technology of Ningxia Hui Autonomous Region announced on May 21 that, in accordance with the relevant requirements of the Measures for the Implementation of Capacity Replacement in Cement and Glass Industry (2024 edition), the Department of Industry and Information Technology of Ningxia Hui Autonomous Region organized experts to conduct on-site verification and acceptance on May 20, 2026, after the application of enterprises and the preliminary examination by the industrial and information departments of Shapotou District and Zhongwei City. The main equipment of the cement clinker production line with a daily output of 2500 tons used by Ningxia Shengjin Cement Co., Ltd. for capacity replacement to Anhui Tongling Shangfeng Cement Co., Ltd. has been dismantled and does not have the capacity to resume clinker production.