China Southern Power Grid Energy Storage Accessories Frame Procurement Tender Announcement
(Tender No.:/)
(the date involved is subject to the date specified in the announcement/document issued)
Energy Storage Accessories Frame Procurement (Tender No.:/) has been approved by the project approval authority. The tenderer is China Southern Power Grid Power Technology Co., Ltd. This project has met the bidding conditions and is now open for bidding. Location of
the bidding project: Guangzhou
I. Bidding Information
(I) Project Name: Framework Procurement
of Energy Storage Accessories (II) Tenderee: China Southern Power Grid Power Technology Co., Ltd.
(III) Bidding Agency: Guangzhou Junsheng Engineering Cost Consulting Co., Ltd.
(IV) Implementation of Funds: Implemented 0 H TML0 UNK1 0 (V) Description of source of funds: Other funds 0 HTML0 UNK1 1 (VI) Project category: Goods 0 HTML0 UNK1 2 (VII) Qualification examination method: Post-qualification 0 HTML0 UNK1 3 (VIII) Delivery period: 0 HTML0 UNK1 4 Subject matter 1: After signing the contract and from the date of receiving the delivery notice Supply and commissioning shall be completed within 45 calendar days, subject to the signing of the contract. 0 HTML0 UNK1 5 Subject 2: Supply and commissioning shall be completed within 45 calendar days after signing the contract and receiving the supply notice, subject to the signing of the contract. 0 HTML0 UNK1 6 Subject 3: Supply and commissioning shall be completed within 80 calendar days after signing the contract and receiving the supply notice, subject to the signing of the contract. 0 HTML0 UNK1 7 (IX) Place of delivery: The place of delivery shall be the place designated by the tenderee, and the quotation shall include labor costs, travel expenses, equipment costs, transportation costs, installation and commissioning costs, taxes, inspection fees, etc. The construction materials used by the bidder in the construction process shall be purchased by the bidder in accordance with the requirements of the tenderee, and shall conform to the requirements of relevant national and industrial quality and technical standards; 0 HTML0 UNK1 8 Validity period of framework bidding results: The term of this framework contract shall be two years from the date of signing the contract. When the actual procurement amount reaches 150% of the estimated amount of the bid package before the expiration of the framework contract, the framework contract will be terminated. When the framework contract is about to expire and the actual purchase amount does not reach 150% of the estimated amount of the bid package, the validity period can be extended by signing a supplementary agreement, but not more than half a year, and the actual purchase amount can not exceed 150%. After the expiration of the framework contract, the framework procurement contract is terminated. 0 HTML0 UNK1 9 (X) Quotation method: quote the unit price according to the list. 0 HTML0 UNK2 0 Two, Project overview and bidding scope 0 HTML0 UNK2 1 (I) The list of bids and subcontracting are as follows: 0 HTML0 UNK2 2
1. The IP address of other bidders downloading the bidding documents, the CPU serial number and the hard disk serial number of the bidding documents are consistent at the same time;
2. The IP address, the CPU serial number and the hard disk serial number of the bidding documents uploaded by other bidders are consistent at the same time;
3.
If any of the above situations occurs in the smallest independent evaluation unit (subject/package/lot) of the procurement project, all bidding documents of the bidder responding to the procurement project and the subsequent procurement of the same procurement project will be rejected.
If there is collusion in the bidding documents, the relevant bidders will be punished for not accepting the bidding in accordance with the relevant provisions of China Southern Power Grid Corporation.
5. Submission
of tender documents 1. Number and mode
of submission of tender documents (1) through the electronic procurement trading platform of the Southern Power Grid (if the https://ecsg.com. fails to produce or upload tender documents on the electronic procurement trading platform of the Southern Power Grid as required, the tender documents shall be submitted to the electronic procurement trading platform of the Southern Power Grid. The Bidder shall bear all the consequences. After obtaining the bidding documents, if the potential bidder considers that it does not meet the relevant procurement requirements or is unwilling to participate, it may decide not to participate in the bidding of this project (subject/package), and shall not upload the relevant documents to the system, which will be regarded as giving up the bidding automatically.
(3) The commercial documents, technical documents and quotation documents shall be submitted in units of (subject matter).
2. Time for submission of bidding documents:
Time for submission of electronic bidding documents: 9:00:00 on July 21, 2023; deadline for submission of bidding: 8:30:00 on August 14, 2023. The tenderee or its bidding agency will not accept the bid documents submitted and uploaded
after the deadline. For units that
have not completed the processing of unit digital certificate (USBkey), in order to avoid delaying the submission of tender documents, Please log in the e-procurement trading platform of China Southern Power Grid as early as possible (https://ecsg.com.
VI. Time and place
of bid opening: 8:30 on August 14, 2023; (Subject to the date specified when the document is issued)
Location: China Southern Power Grid Electronic Procurement Trading Platform;
Method: This project is an electronic bid opening. Bidders do not need to arrive at the bid opening site. They must log in the "China Southern Power Grid Electronic Procurement Trading Platform" at any place with Internet environment according to the bidding deadline specified in the bidding documents, insert their legal digital certificates, and decrypt and sign the bidding documents.
In case of unsuccessful uploading of the bidding documents (blank or abnormal display after decryption), or the bidding documents are not decrypted or signed due to other reasons of the bidder, the bidder shall be deemed to withdraw its bidding documents.
Seven、 Other announcement
media are China Public Service Platform for Tendering and Bidding (https://www.cebpubservice.com/) and China Southern Power Grid Electronic Procurement Trading Platform (https://ecsg.com.
VIII. Bidders and other interested parties of the supervision department
shall have the right to complain to the relevant administrative supervision department if they believe that the bidding activities violate the provisions of laws, regulations and rules.